Parthi Kandavel

Parthi Kandavel

Ward 20, Scarborough Southwest

Email
Councillor_Kandavel@toronto.ca
Phone
416-392-4052
345 results
Feb 26, 2025
2025.EC18.4

Proposed Pilot for Non-Motorized Mobile Food Vendors in University-Rosedale

City of Toronto Municipal Code Chapter 740, Street Vending, regulates the sale of refreshments, including food, drink and ice cream, from motorized vehicles and non-motorized vehicles on City highways.  A review of Chapter 740 is planned to occur throughout 2025, with the findings and recommendations expected to be presented to Council by the end of 2025.

 

The purpose of this report is to respond to 2024.MM24.5 More Great Eats, which directs Municipal Licensing & Standards (“MLS”) to report back with recommendations for a pilot to permit non-motorized vehicles to obtain a mobile vending permit and operate from mobile vending zones in University-Rosedale (Ward 11).

 

This report was developed with input from Transportation Services.

Date
2025-02-26
Motion
Adopt Item
Vote
Yes
Decision body
Economic and Community Development Committee
Total
6-0
Status
Carried
Feb 20, 2025
2025.SC20.6

513 Huntingwood Drive - Application to Remove a Private Tree

This report requests that Scarborough Community Council deny the request for a permit to remove one privately owned tree located at 513 Huntingwood Drive. The applicant indicates the reason for requesting removal of the tree is because the tree is in poor condition and there is a concern about potential failure.

         

The Colorado blue spruce tree (Picea pungens) measures 60 cm in diameter. The City's Tree By-laws do not support the removal of this tree as it is healthy and maintainable. The permit was denied, and the applicant is appealing the decision. Community Council has delegated authority from City Council to make a final decision as to whether a permit may be issued when an applicant appeals the denial of a permit of a tree protected under the By-laws.

Date
2025-02-20
Motion
Amend Item
Vote
No
Decision body
Scarborough Community Council
Total
1-4
Status
Lost
Feb 20, 2025
2025.SC20.1

2759 and 2761 to 2763 Kingston Road and 52 St Quentin Avenue - Official Plan and Zoning By-law Amendment Application - Decision Report - Approval

This Report recommends approval of the application to amend the Official Plan and Zoning By-law for the site municipally known as 2759 and 276 to 2763 Kingston Road and 52 St Quentin Avenue to permit the development of a 10-storey (36.83 metres including the mechanical penthouse) mixed-use building containing 95 residential units with retail on the ground floor. The development is proposed to contain 6,408 square metres of residential gross floor area and 433 square metres of retail gross floor area with two levels of underground parking with access from a private driveway off of St Quentin Avenue.

 

The proposed development is consistent with the Provincial Planning Statement (2024). The proposed development also conforms to the City's Official Plan. It will provide housing options in a mid-rise form, intensifying an underutilized site along Kingston Road consistent with the existing and planned context.

Date
2025-02-20
Motion
Adopt Item as Amended
Vote
Yes
Decision body
Scarborough Community Council
Total
5-0
Status
Carried
Feb 11, 2025
2025.CC27.1

Budget Implementation Including Property Tax Rates, User Fees and Related Matters

The purpose of this report is to recommend the additional approvals required to give effect to the 2025 Budget and includes the following matters:

 

2025 Property Tax Rates and Related Matters: City Council must enact a by-law to levy property tax rates that generate the tax revenue set out in the City’s budget. This report recommends the 2025 municipal tax rates, reflected in the 2025 Mayor's Proposed Budget.

 

For 2025, an average budgetary tax rate increase of 4.37 percent is proposed, as detailed in Table 1. This includes a 5.40 percent increase for residential and industrial properties and a 2.70 percent increase for multi-residential and commercial properties.

Additionally, this report recommends an incremental tax rate increase for the City Building Fund Levy to support critical capital investments in transit and housing. This includes a 1.50 percent increase for residential and industrial properties, and a 0.75 percent increase for multi-residential and commercial properties.

 

Table 1: 2025 Recommended Municipal Property Tax Rate Increases

 

Property Class

2025 Tax Rate Increase for Operating Budget

2025 Tax Rate Increase for City Building Fund

2025 Total Municipal Tax Rate Increase

Residential, New Multi-Residential, Farmland, Managed Forest, Pipelines

5.40%

1.50%

6.90%

Multi-Residential

2.70%

0.75%

3.45%

Commercial

2.70%

0.75%

3.45%

Industrial

5.40%

1.50%

6.90%

Total Tax Rate Increase

4.37%

1.21%

5.58%

 

This report further recommends:

  • annual adjustments to the income threshold for the City’s property tax, solid waste and water relief programs;
  • creating a new Co-operative Housing Grant Program for eligible low-income seniors or persons with disabilities who are members of, and who reside in, non-profit housing co-operatives;
  • extending application deadlines for tax relief programs; and
  • applying interest and penalties for the Municipal Accommodation Tax and the Municipal Land Transfer Tax programs in the same manner as property taxes.

2025 User Fees: User fees are reviewed and adjusted through the budget process, including the final rates and service fees for Rate Supported Programs (Solid Waste Management Services and Toronto Water). The 2025 Mayor’s Proposed Budget outlines estimated revenues from user fees, subject to City Council approval as required by the City of Toronto Act, 2006. This report seeks Council approval for user fee changes and the introduction of new fees.


Provincial Gas Tax and Canada Community Building Fund: In accordance with the directive to report annually to City Council through the capital budget process, this report provides an overview of the Provincial Gas Tax (PGT) and Canada Community Building Fund (CCBF) programs, which are vital to supporting Toronto's public transit and infrastructure investments. These programs, as outlined in the 2025-2034 Capital Budget and Plan, have enabled the City to fund key projects aimed at maintaining and expanding its transit network. Details of the planned eligible projects funded under these programs are included in Appendix B.

 

Other Items Requiring Council Direction: This report also makes recommendations with respect to matters related to the 2025 Budget that do not fall under the strong mayor powers:

  • Requests for Program specific report backs and interdivisional collaboration
  • Establishment of a new reserve fund
  • Request for an amendment to the Development Charges Act to authorize the City of Toronto to prevent or change annual indexing requirements, to aid in incentivizing housing development
  • Technical changes to the Toronto Municipal Code to reflect governance changes and responsibilities of the City’s Deputy Treasurers
  • Amendment of Municipal Code Chapter 743, Streets and Sidewalks, Use of to support the implementation of Road Disruption Activity Reporting System (RoDARS)
Date
2025-02-11 20:39 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Date
2025-02-11 20:38 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
22-1
Status
Carried
Date
2025-02-11 20:37 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
21-2
Status
Carried
Feb 11, 2025
2025.MPB27.1

2025 Operating and Capital Budget

Section 226.14 (2) of the City of Toronto Act, 2006 provides that the Mayor shall, in accordance with the regulations, prepare a proposed budget for the City and provide the proposed budget to City Council for City Council’s consideration. This report fulfills this requirement.

 

In the 2024 Budget we faced a $1.8 billion budget shortfall. That’s why, after a decade of neglect, we brought in a bold budget and a New Deal with the provincial government that worked to get our city back on track. We made significant progress over the last year with improved City services, faster emergency response times, and more shovels in the ground building affordable housing. And, for the first time in decades, we improved the City’s credit rating to AA+ – saving Torontonians money on borrowing costs related to transit, housing, and more.

 

Of course, our challenges are too great to solve in one year, but the hard choices made in 2024 are paying off for Toronto as seen in this year’s budget. The 2025 Budget began with a $1.2 billion budget shortfall. That’s a $600 million improvement from 2024. But closing this shortfall remains a challenge. To balance the 2025 Budget we are delivering another $680 million in reductions and offsets combined with the results of successful intergovernmental agreements that help us do more for Torontonians. 

 

The Mayor’s 2025 Budget makes important investments to build more homes faster, accelerate approvals for purpose built rentals, and rapidly increase the supply of affordable and non-market housing. The budget works to prevent evictions, the loss of affordable housing, and to support renters through investments in the new Renoviction by-law, as well as critical programs like Eviction Prevention in Community, the Rent Bank, RentSafe, the Multi-Unit Residential Acquisition Program and the Tenant Support Program. We are getting Toronto moving with historic investments in the TTC and traffic agents. We are improving TTC service while freezing fares. The budget feeds more kids through expanded School Food Programs, summer camps and continues to invest in youth with expanded after school programs, additional youth hubs, increases to grants for youth-serving organizations, and a new $5 million Youth Safety Initiative to stop rising youth violence in our city. This Budget also expands library hours as we move to seven day a week library service at every branch in the city. It works to build a more liveable city with improved 311 service, investments to fix our community centres, roads, parks, and public space, expanded hours for pools and recreation centres, alongside opportunities to help Torontonians reduce their climate footprint.

 

In the 2025 Budget, we are also introducing the first full-year of our City-wide fourth emergency service, Toronto Community Crisis Service (TCCS). It is a caring approach to supporting people in crisis, where trained crisis workers respond, de-escalate, and refer people to appropriate mental health and other social services. In addition, through the adoption of a multi-year hiring plan by the Toronto Police, 109 net new police officers will be added this year, including an expanded neighbourhood officer program. We are also adding 95 new frontline paramedics and 52 new firefighters to improve emergency response times across the city. And we are expanding eligibility for property tax deferral and cancellation programs, so thousands more qualify for support.

 

The Mayor's Proposed 2025 Tax and Rate Supported Operating Budget is $18.849 billion gross and $5.639 billion net. The Mayor's Proposed Tax and Rate Supported 2025-2034 Capital Budget and Plan is $59.597 billion gross and $10.524 billion debt. The Capital Budget and Plan focuses on investments in Transit Funding ($17.0 billion), Transportation ($6.1 billion), and Housing ($4.5 billion plus a further $4.5 billion provided through foregone revenues); and includes investments such as the Line 2 subway train replacement and e-Bus procurement, focuses on climate mitigation and adaptation actions aimed at reducing ~160,725 tonnes/CO2 across all capital projects in the 2025 budget, and reduction of State of Good Repair (SOGR) backlog with an additional $6.0 billion increase in SOGR spending over the next 10 years.

 

On January 28, 2025, the City of Toronto, the Government of Canada, and the Government of Ontario announced $975 million to accelerate the delivery of Waterfront Toronto’s revitalization plan. With this investment, this partnership will build more than 14,000 homes, including affordable rental housing; create an estimated 100,000 skilled trades jobs; and add $13.2 billion to the economy. Each order of government has agreed to contribute $325 million to this initiative. Based on this recent announcement, I have directed the Chief Financial Officer to report to City Council in the first quarter of 2025, allocating $325 million in available capital funding capacity to the 2025-2034 Capital Budget.

Date
2025-02-11 17:20 PM
Motion
Amend Mayor's Proposed Budget
Vote
Yes
Decision body
City Council
Total
24-1
Status
Carried
Date
2025-02-11 17:19 PM
Motion
Amend Mayor's Proposed Budget
Vote
No
Decision body
City Council
Total
3-22
Status
Lost
Date
2025-02-11 17:18 PM
Motion
Amend Mayor's Proposed Budget
Vote
No
Decision body
City Council
Total
2-23
Status
Lost
Feb 5, 2025
2025.MM26.11

Let's Amplify the Need for a New Fiscal Framework - New Deal for Cities

  • The City of Toronto is facing challenges due to growing populations and service demands.
  • There is a structural deficit and a backlog in city repairs.
  • Toronto is taking on financial responsibilities that should belong to higher levels of government.
  • Advocacy groups like the Federation of Canadian Municipalities and the Association of Municipalities of Ontario are pushing for better financial tools for municipalities.
  • A new Municipal Growth Framework is proposed to align local revenues with growth, addressing issues like housing and infrastructure.

Decisions and Recommendations

  • Councillor Lily Cheng, supported by Councillor Jamaal Myers, recommends that:
    1. City Council should ask the City Manager to find ways to work with regional organizations.
    2. The goal is to promote sustainable fiscal frameworks that match the City’s priorities during upcoming elections and afterwards.
AI Generated
Date
2025-02-05 21:27 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
17-1
Status
Carried
Date
2025-02-05 10:27 AM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
25-1
Status
Carried
Feb 5, 2025
2025.PH18.6

Progress on Building More Supportive Homes

The City of Toronto has taken an increased role in the creation of new supportive and rent-geared-to-income (RGI) homes for people experiencing or at risk of homelessness, particularly since the adoption of the HousingTO 2020-2030 Action Plan (HousingTO Plan) and as a response to the COVID-19 pandemic. Despite increased action and investments, Toronto’s housing and homelessness crises have worsened. Deeply affordable rental housing is at risk of being lost, and difficult and volatile economic conditions have made the construction of new housing, particularly RGI, supportive, affordable rental homes, more challenging. The shortage of supportive homes, inadequacy of social assistance rates, and need for greater mental health and social supports is illustrated most starkly by the rising number of encampments in Toronto.

 

Concerted action and investment from all orders of government and the private, health, and social services sectors is needed to respond to these crises. Despite this growing need, federal and provincial investment in measures proven to be most effective – new supportive housing, mental health and social supports, and higher social assistance rates that match the cost of living – have not kept pace.

 

This report provides a summary of the City’s progress in creating new supportive homes, and requests authorities needed to complete existing in-flight developments creating more than 700 RGI and supportive homes and to advance new projects through an application for funding under a revised federal program to build more RGI and supportive homes.

 

On November 14, 2024, Canada Mortgage and Housing Corporation (CMHC) announced changes to the Affordable Housing Fund (AHF), including the creation of a new permanent Rapid Housing Sub-stream. CMHC also announced that $963 million was being made available over five years (2025-2029) across Canada under this new program. The program replaces the former Rapid Housing Initiative (RHI), which was delivered through three phases between 2020 and 2022, for a total of $4 billion over three years nationally. The RHI supported the creation of rent-geared-to-income and supportive homes for people experiencing or at risk of homelessness, by providing capital grant funding to eligible projects covering up to 100 percent of capital costs. The City of Toronto and its Indigenous and non-profit housing partners received $610.8 million in capital funding under the RHI, supporting the creation of more than 1,500 new homes. These investments have enabled the City to expand its supply of newly built supportive housing and exceed targets under the first 24-Month Housing and Homelessness Response Plan, launched in 2020 as a response to the COVID-19 pandemic. Since 2020, 3,880 supportive housing opportunities have been secured, including 1,763 net new supportive homes, for people experiencing or at risk of homelessness.

 

This report outlines key program changes and requests authority from City Council for staff to make applications and enter into agreements with CMHC under the new program. Despite new limitations and reduced funding available under this program, it is recommended the City continue to invest in due diligence activities to bring projects forward to be considered by CMHC. This report also recommends City Council request the federal government:

  • make significantly greater funding available under this new program,
  • make changes to program design based on the elements of the RHI that were most effective in creating new supportive homes for people experiencing homelessness, and
  • provide Toronto with a portfolio of funding and financing under a Canada-Ontario-Toronto Builds model.

Through this report, staff are also requesting Council approvals required complete in-flight projects creating more than 700 RGI and supportive homes, including authority for Purchase Order Amendments, authority to enter into operating and lease agreements with non-profit housing providers, and property tax exemptions.

 

City Council took significant action in 2024 to expand its housing programs to support the creation of a range of new rental homes, including the launch of a new Community Housing Pre-development Fund to support community housing providers with early due diligence, and approval of a new Rental Housing Supply Program offering funding and incentives to a range of rental homes. The City acting alone cannot address the housing and homelessness crises, particularly for the more than 12,000 Toronto residents currently experiencing homelessness. A whole-of-government and whole-of-community response is needed to effectively respond. This must include new and enhanced policy, program, and funding tools at the federal and provincial levels that are effectively designed and adequately scaled to meet the depth of need, and investment in upstream interventions such as social assistance programs and access to mental health and social services, to prevent more households from falling into poverty, housing precarity, and homelessness.

Date
2025-02-05 21:25 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
17-1
Status
Carried
Date
2025-02-05 21:24 PM
Motion
Amend Item
Vote
No
Decision body
City Council
Total
4-14
Status
Lost
Feb 5, 2025
2025.EX20.13

Toward Municipal Autonomy and Effective Local Governance

City Council on December 17 and 18, 2024, referred Motion MM24.15 to the Executive Committee for consideration.

  

Doug Ford’s latest overreach into municipal jurisdiction is another reminder that Canada's constitution was written when our country was largely an agrarian society. Large cities like Toronto are now responsible for delivering, and funding a large share of, transit, roads, social housing, recreation, and other services residents rely on every day. Yet the province can overturn any of our considered and debated decisions on a whim.

 

Constant provincial meddling in municipal affairs undercuts local democracy and threatens civic engagement. We risk Torontonians tuning out our public meetings and consultations if the sentiment that the province will just overturn Council decisions takes root.

 

Whether Torontonians agree with a Council decision regarding a development plan, how elections are conducted, or a bike lane, the level of government making the decision should be accountable. Toronto needs a new arrangement with senior levels of government that ensures we have the independence necessary for 21st century cities to thrive and achieve results for residents. Common in the United States and elsewhere, Charter Cities have supreme authority over “municipal affairs.” Also referred to as “Home Rule”, a Charter City’s law concerning a municipal affair will trump a state law governing the same topic.

 

It's time for Canada's largest city to have the tools it needs to effectively chart its own course to decide how we grow, get around, support each other, and improve our quality of life. A City Charter will also assist in making the division of roles and responsibilities between senior levels of government and City Hall more transparent and therefore more accountable to the public.

 

No one can be under any illusion that a Charter is possible at present given such a move would require support from the provincial government. However, it is important to start work on how greater independence could be structured and communicate the benefits to Torontonians, other municipalities, and senior levels of government. That’s why this motion requests the City Manager to establish a Program Advisory Body that would serve as a task force on Municipal Autonomy and Effective Local Governance that would include local advocates and governance experts.

Date
2025-02-05 20:58 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
18-2
Status
Carried
Date
2025-02-05 20:57 PM
Motion
Amend Item (Additional)
Vote
No
Decision body
City Council
Total
1-19
Status
Lost
Feb 5, 2025
2025.EX20.11

ReNew Golden Mile Environmental Assessment: Final Report

The ReNew Golden Mile Environmental Assessment Study (EA Study) was initiated in 2022. The EA Study builds on the Golden Mile Secondary Plan and Golden Mile Transportation Master Plan approved by City Council in October 2020.

 

The Golden Mile area, generally consisting of lands located along Eglinton Avenue East and Craigton Drive, between Victoria Park Avenue and Birchmount Road, has been influenced by agricultural, industrial, and commercial eras of development. The area became known as the "Golden Mile of Industry" during the post-World War II era with the construction of large-scale manufacturing buildings along Eglinton Avenue East, between Pharmacy Avenue and Birchmount Road. Large-scale commercial development generally occurred during the 1990's, replacing many of the former industrial buildings that fronted onto Eglinton Avenue East.

 

The Golden Mile Secondary Plan advanced a vision for a new mixed-use community with a range of tall, mid-rise and some low-rise buildings to be constructed over the next 20+ years. There are 14 sites with active development applications within the Plan Area. City Council has approved or accepted settlement offers for 12 of the 14 sites. These approvals and accepted settlement offers, combined with the balance of development potential for other sites in the area, are currently estimated to accommodate approximately 32,700 residential units, 57,500 residents and over 20,000 jobs (including replacement jobs).

 

The EA Study is completing phases 3 (Alternative Designs) and 4 (Environmental Study Report) of the Municipal Class Environmental Assessment (MCEA) process and establishes the preferred alignments and designs of new and reconfigured streets to support future development and growth. The EA process completed to date involved developing and evaluating alternative street alignments and designs for the following transportation infrastructure:

 

-A potential reconfiguration of O’Connor Drive, along with an extension to Birchmount Road;

-A new east-west public street north of Eglinton Avenue East from Victoria Park Avenue to Birchmount Road (“Golden Mile Boulevard”);

-A potential realignment, widening and reconfiguration of Craigton Drive to directly connect to Ashtonbee Road; and

-A potential reconfiguration of Thermos Road and Sinnott Road at the Eglinton Avenue East intersection.

 

The Preferred Alignments and Designs resulting from the EA process for each of the corridors are provided in Attachment 1.

 

Additionally, other corridor improvements are recommended along Jonesville Crescent and Ashtonbee Road to Birchmount Road that do not require completion of phases 3 and 4 of the MCEA. The corridor improvements will ensure these streets are complete streets to support existing and future residents and businesses.

 

City Council considered an interim staff report on June 26, 2024, which provided an update on the EA Study. The report summarized the process of developing and evaluating alternatives for both alignments and street designs, consultation undertaken on the alternatives and feedback received, the evaluation of the alternatives and presented Preliminary Recommended Alignments and Designs. Council endorsed the Preliminary Recommended Alignments and Designs for the purposes of completing the mandatory public consultation required during phase 3 of the MCEA process. Council also directed City staff to further consult with three property owners in the area on the alignment of the O’Connor Drive Extension between Lebovic Avenue and Birchmount Road.

 

The purpose of this report is to summarize the consultation undertaken on the Preliminary Recommended Alignments and Designs, refinements made to Recommended Alignments and Designs to address feedback received, where appropriate, and present the final Preferred Alignments and Designs. The report seeks endorsement from Council on the final Preferred Alignments and Designs and authorization for City staff to proceed with preparing and filing the Environmental Study Report for the EA Study in accordance with the MCEA process for Schedule C projects, and requests direction to proceed with the recommended corridor improvements along Jonesville Crescent and Ashtonbee Road identified in the Study as part of future capital planning processes.

 

Additionally, in accordance with Council direction from Item - 2024.MM23.8, this report also provides a summary of the appropriateness and the process requirements of a four vehicular lane design for the O’Connor Drive Reconfiguration and Extension from the ReNew Golden Mile EA’s western limit to Birchmount Drive.

 

It is anticipated that the full delivery of all of the ReNew Golden Mile EA streets would be fully realized in a long-term horizon of over 20+ years.

Date
2025-02-05 19:57 PM
Motion
Adopt Item as Amended
Vote
No
Decision body
City Council
Total
17-3
Status
Carried
Date
2025-02-05 19:55 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
15-5
Status
Carried
Feb 5, 2025
2025.EX20.5

Moss Park Arena - Governance and Operational Transition Plan

This report responds to City Council's direction to the General Manager, Parks, Forestry and Recreation, now Parks and Recreation, in collaboration with the City Manager to develop a transition plan to change the governance and operations of Moss Park Arena from a Board of Management to a City-operated arena to come into effect by the end of 2025.

 

In addition, City Council directed that the Moss Park Arena Board, work with the General Manager, Parks and Recreation to review opportunities for the Moss Park Arena to enhance equitable community access to the Arena’s programs. City Council also directed the City Manager and General Manager, Parks and Recreation to report back on options to strengthen local access to programming and enhanced diversity of Board membership within current operating and governance structure of Moss Park Arena.

 

This report outlines the required actions to facilitate an effective transition, as well as implementation timelines and potential impacts including personnel, clientele and other liabilities and obligations.

 

The report also provides an analysis of the geographic reach of the Moss Park Arena programs as well as recent efforts to improve access to arena programs, and an update on Board diversity and enhanced local representation through the City's Public Appointments Policy.

Date
2025-02-05 19:29 PM
Motion
Adopt Item
Vote
No
Decision body
City Council
Total
13-5
Status
Carried
Feb 5, 2025
2025.PH18.5

Housing Action Plan: Avenues Policy Review - Decision Report

For over two decades, Toronto’s Avenues have been part of the City’s strategy to manage growth and accommodate intensification. Through the Housing Action Plan (HAP) 2022-2026, Council directed City Planning to review the Official Plan to ensure that it aligns with the need for more housing in areas that can accommodate more residential growth. As part of the HAP Work Plan, the Avenues Policy Review examined opportunities to enable more housing by reframing the Avenues vision, policies, and mapping. This initiative represents one of 54 actions items in the HAP.

 

Avenues have attracted significant realized and potential growth. The City’s Development Pipeline bulletin for 2023 (January 2019 - December 2023) reported that Avenues contained the most proposed projects of any of the Official Plan’s growth management areas. In total, there are 640 development projects (271 under review, 227 active, and 142 built) that account for over 180,000 residential units and over 1 million square metres of non-residential gross floor area, representing 24 percent of the city’s units and 8% of its non-residential gross floor area in the pipeline. While not all of these projects are approved, under construction, or built, this data demonstrates the importance of Avenues in supporting transit supportive growth.

 

This report recommends an Official Plan Amendment (OPA) to update the Avenues policies in Section 2.2.3. It also introduces mapping changes to Map 2 to expand the Avenues geography and other policy updates necessary to implement the new vision and policy framework. These updates leverage the Avenues as a growth management tool, identifying more opportunities for housing across the city and creating a more streamlined policy framework with clear direction on the type of growth to be directed to Avenues. The most significant changes include:

  • 283 kilometres of new Avenues, representing an increase of approximately 165 percent.
  • Removing requirements for Avenue Segment Reviews and new Avenue Studies.
  • Introducing a new monitoring program to assess the Avenues implementation.
  • Directing growth along Avenues to be up to the height and scale of mid-rise buildings.
  • Directing more growth near subway, light rail transit, and GO transit stations, approximately 36 percent of new and existing Avenues.
  • Providing uses that activate the ground floor in developments along Avenues in Mixed Use Areas.
  • Directing applicants to consult with small businesses, community service providers, and the local community when proposing developments that would result in the displacement of existing small businesses and community service providers, and to assess the potential of their return.

To implement this new vision, policies, and mapping for Avenues, this report also recommends next steps for staff to redesignate and rezone lands along and nearby Avenues. The new policies do not result in a net new development application submission requirement in the new Avenues policies.

Date
2025-02-05 17:42 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
11-13
Status
Lost
Date
2025-02-05 17:40 PM
Motion
Amend Item
Vote
No
Decision body
City Council
Total
16-8
Status
Carried
Date
2025-02-05 17:37 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
6-17
Status
Lost
Feb 5, 2025
2025.PH18.4

Expanding Housing Options in Neighbourhoods - Ward 23 Multiplex Study - Official Plan and Zoning By-law Amendments - Decision Report - Approval

Building on the Expanding Housing Options in Neighbourhoods (EHON) City-wide Multiplex Study, City Council directed staff to undertake an area specific study within an area that roughly corresponds to the boundaries of Ward 23 – Scarborough North. The study explored the potential of permitting multiplexes with up to six dwelling units on properties designated Neighbourhoods in the Official Plan, and increasing the maximum building depth up to 19 metres, regardless of the lot dimensions.

 

This report summarizes the work undertaken and recommends approving area specific Official Plan and Zoning By-law Amendments to permit multiplexes with five and six dwelling units (also referred to as fiveplexes and sixplexes, respectively) in all residential zones within the study area. The proposed amendments build on the existing city-wide multiplex permissions for up to four units, and do not include changes to built form performance standards. This study is a significant pilot which brings forward permissions to expand city-wide multiplex dwelling unit permissions from four to six units within a single residential home. This is one of 54 actions in Toronto's 2023 Housing Action Plan (HAP), which seeks to increase the housing supply within complete, inclusive, and sustainable communities with critical infrastructure to support growth. The new homes enabled by the HAP will contribute to the provincial housing target of 285,000 new homes in Toronto by 2031.

 

As part of the City’s commitments under the federal Housing Accelerator Fund (HAF), the City has committed to permit more low-rise, multi-unit housing development through as-of-right zoning by-laws in Neighbourhoods, including permissions for residential buildings with up to six dwelling units. Adoption of the recommendations in this report marks a significant milestone towards meeting this commitment in 2025.

 

The recommended amendments are consistent with the Provincial Planning Statement 2024 and also in keeping with the recently adopted new Chapter 1 to the Official Plan vision, which aims to eliminate disparities, prioritize climate action, and become the world’s most inclusive city.

 

The Ward 23 Multiplex Study consisted of a work program that included a jurisdictional scan of multiplex permissions in other cities; a detailed review of multiplex development applications submitted to the city; a three-phased analysis prepared in consultation with ReHousing; and engagement with local residents and industry professionals. The key findings of the above streams of work were analyzed and informed the recommended Official Plan and Zoning By-law Amendments.

 

Expanding the multiplex permissions will increase new low-rise housing options for Torontonians in Ward 23. New residents in low-rise neighbourhoods can help stabilize declining populations, optimize the use of existing infrastructure, and support local retail establishments and services. While it is anticipated that most multiplex units will be delivered as market rental housing, they would provide ground-related alternatives, adding to the range of housing in Toronto’s low-rise, mid-rise, and tall building types. Additionally, these new permissions could unlock additional opportunities for individuals to access funding and low interest rate loans for housing projects through the Canada Mortgage and Housing Corporation (CMHC). While the proposed amendments will expand the planning permission for up to six units, this report also details potential challenges to their implementation beyond simply adjusting the zoning permissions.  These issues, and other lessons learned through the Ward 23 Multiplex Study, will inform ongoing work being undertaken by City Planning and other Divisions to permit and promote multiplexes city-wide.

Date
2025-02-05 17:34 PM
Motion
Adopt Item as Amended
Vote
No
Decision body
City Council
Total
18-5
Status
Carried
Feb 5, 2025
2025.MM26.13

Affirming Our Canadian Independence

  • The City Council meeting addressed concerns about comments made by President Donald Trump regarding Canada’s independence.
  • There is growing anxiety about the implications of these statements on Canada’s culture, values, and economy.
  • The Council recognized the need to clarify Toronto's stance on this issue amid discussions of potential tariffs on trade.

Decisions and Recommendations

  • Councillor Stephen Holyday, supported by Councillor Vincent Crisanti, recommended that:
    1. City Council officially declare Toronto’s opposition to any proposal for Canada to become the 51st state of the United States.
    2. The resolution be sent to all Toronto Members of Parliament for further action.
AI Generated
Date
2025-02-05 11:42 AM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
26-0
Status
Carried
Feb 5, 2025
2025.MM26.7

Creation of a City of Toronto "Buy Local, Buy Canadian" Campaign

  • The City Council meeting addressed potential economic impacts from President Trump's proposed 25% tariff on Canadian goods.
  • The focus was on supporting local economies in Toronto and across Canada.
  • The meeting highlighted the need for municipalities, businesses, and residents to respond proactively.

Decisions and Recommendations

  • Councillor Mike Colle, supported by Councillor Jennifer McKelvie, proposed a motion.
  • City Council will ask the City Manager and relevant divisions to create a “Buy Local, Buy Canadian” campaign.
  • The campaign aims to encourage residents and businesses to purchase local goods and services.
  • This initiative seeks to protect local jobs in Toronto and Ontario from potential job losses due to tariffs.
  • City Council will also share this initiative with all Ontario municipalities to promote wider participation.
AI Generated
Date
2025-02-05 11:41 AM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
26-0
Status
Carried
Date
2025-02-05 11:40 AM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
26-0
Status
Carried
Date
2025-02-05 11:40 AM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
26-0
Status
Carried
Feb 5, 2025
2025.MM26.1

Re-Opening and Amending Item 2024.EX15.3 - Advancing the Homelessness Services Capital Infrastructure Strategy (HSCIS) and the 2025 Shelter Infrastructure Plan

  • The City Council meeting focused on addressing homelessness, a significant social challenge.
  • Toronto Shelter and Support Services proposed a shelter at Wilson Avenue and Keele Street.
  • The vacant land at 1220 Wilson Avenue is owned by the Toronto Parking Authority and is currently underused.
  • The location is near Humber River Hospital, which presents an opportunity for collaboration to support the homeless.

Decisions and Recommendations

  • Councillor James Pasternak, supported by Councillor Jon Burnside, proposed to exclude 1220 Wilson Avenue from being developed as a shelter.
  • The Council will ask the Toronto Shelter and Support Services to discuss a supportive housing option on the hospital campus with Humber River Hospital.
  • The Council will direct the Parks and Recreation General Manager to investigate the possibility of creating a park at 1220 Wilson Avenue and report back in early 2025.
AI Generated
Date
2025-02-05 10:21 AM
Motion
Re-open Item
Vote
Yes
Decision body
City Council
Total
10-16
Status
Lost
Jan 20, 2025
2025.HL21.5

Feedback from Toronto Public Health's Health and Homelessness Working Table

  • The City Council meeting focused on health and homelessness in Toronto.
  • In January 2023, the Board of Health asked the Medical Officer of Health to form a working group to address health issues related to homelessness.
  • The Health and Homelessness Working Table included experts and individuals with lived experiences.
  • The group held eight meetings from August 2023 to May 2024, discussing various health issues and the need for better service coordination.

Decisions and Recommendations

  • The Board of Health recognized the importance of affordable housing and equitable income for health improvement.
  • The Medical Officer of Health was tasked with assessing service accessibility and sharing the working group's report with relevant agencies.
  • Collaboration with the Government of Ontario and Canada was urged for policy and funding support.
  • An intergovernmental collaborative group was proposed to address homelessness health issues, including diverse stakeholder representation.
  • Ongoing advocacy for affordable housing options was requested, and support for undocumented Torontonians was affirmed.
  • The Federal Government was asked to consider expunging cannabis possession records.
AI Generated
Date
2025-01-20 13:11 PM
Motion
Amend Item (Additional)
Vote
Absent
Decision body
Board of Health
Total
9-0
Status
Carried
Dec 20, 2024
2024.CC25.1

Results of Collective Bargaining Negotiations between the City of Toronto and Toronto Civic Employees Union Local 416

  • The City Council meeting focused on collective bargaining outcomes between the City of Toronto and the Toronto Civic Employees Union Local 416.
  • The purpose was to seek Council's approval for the negotiated agreements.

Decisions and Recommendations

  • City Council ratified the Memorandum of Settlement for the Main Unit and Paramedics.
  • The Mayor was requested to adjust the 2025 Non-Program Expenditure Budget and Operating Budgets as per the settlements.
  • Staff were authorized to amend pay rates, benefits, and other agreed changes in the settlements.
  • Confidential Attachments 1 and 2 will remain confidential due to their relevance to labor relations.
  • Attachments 3 and 4 will also remain confidential until the agreements are finalized, after which they will be publicly released.
AI Generated
Date
2024-12-20 10:22 AM
Motion
Adopt Item as Amended
Vote
Absent
Decision body
City Council
Total
21-1
Status
Carried
Dec 18, 2024
2024.MM24.42

Declaring Food Insecurity an Emergency

  • The City Council meeting addressed rising food insecurity in Toronto.
  • A personal story highlighted the impact of hunger on children.
  • Food bank visits in the Greater Toronto Area have increased significantly.
  • The City currently supports over 230,000 children through a school food program.
  • An initiative was approved to feed 8,000 more kids starting in January.
  • The Council recognized the urgent need for a comprehensive solution.

Decisions and Recommendations

  • City Council declared food insecurity an emergency in Toronto.
  • The City Manager will incorporate this emergency into future food insecurity efforts.
  • The Provincial Government is requested to increase funding for school food programs.
  • Both Provincial and Federal Governments are urged to address the root causes of food insecurity.
  • The Council will share these recommendations with relevant governmental and educational organizations.
AI Generated
Date
2024-12-18 23:15 PM
Motion
Adopt Item
Vote
Absent
Decision body
City Council
Total
16-1
Status
Carried
Dec 18, 2024
2024.CC24.13

417-419 Burnhamthorpe Road - Ontario Land Tribunal Hearing - Request for Directions

  • The City Council meeting took place on December 17 and 18, 2024.
  • It addressed a Zoning By-law Amendment and Site Plan Control applications for a townhouse development at 417-419 Burnhamthorpe Road.
  • The applicant revised the proposal multiple times and appealed to the Ontario Land Tribunal due to delays in decision-making.
  • A settlement offer was received on December 5, 2024, which required urgent attention.

Decisions and Recommendations

  • City Council adopted the confidential instructions from the City Solicitor, as amended.
  • The settlement offer was accepted, and the City Solicitor will support it at the Ontario Land Tribunal.
  • Council instructed the Solicitor to ensure compliance with various engineering and environmental requirements before finalizing the Zoning By-law Amendment.
  • Amendments to the Municipal Code were approved to restrict parking permits for residents of the new development.
  • The City Solicitor was authorized to take necessary actions to implement these decisions.
AI Generated
Date
2024-12-18 23:12 PM
Motion
Amend Item
Vote
Absent
Decision body
City Council
Total
2-15
Status
Lost
Date
2024-12-18 23:12 PM
Motion
Adopt Item as Amended
Vote
Absent
Decision body
City Council
Total
15-2
Status
Carried
Dec 18, 2024
2024.CC24.12

33-51 Walsh Avenue and 2717-2745 Weston Road - Ontario Land Tribunal Hearing - Request for Directions

  • On September 22, 2022, applications were submitted for a Zoning By-law Amendment and Site Plan Control for a mixed-use development at Walsh Avenue and Weston Road.
  • The proposal includes six towers, a public park, and retail space.
  • The applicant appealed to the Ontario Land Tribunal due to the City Council's delay in decision-making.
  • Upcoming hearings are scheduled for February 17-March 7, 2025.

Decisions and Recommendations

  • City Council adopted recommendations from the City Solicitor on December 17-18, 2024.
  • The Council accepted a settlement offer and directed the City Solicitor to support it at the Ontario Land Tribunal.
  • Confidential instructions were made public, detailing requirements for the development, including various reports and assessments to be submitted by the owner.
  • The City Solicitor was authorized to take necessary actions to implement the decisions.
  • Certain confidential information remains undisclosed at the City Solicitor's discretion.
AI Generated
Date
2024-12-18 23:06 PM
Motion
Adopt Item
Vote
Absent
Decision body
City Council
Total
14-2
Status
Carried
Dec 18, 2024
2024.CC24.6

4001 Steeles Avenue West, 5000 Jane Street and 360 Hullmar Drive - Ontario Land Tribunal Hearing - Request for Directions

  • The City received applications for a Zoning By-law Amendment and Site Plan Control for 4001 Steeles Avenue West.
  • The proposal includes three towers of 45, 45, and 35 storeys.
  • The applicant appealed due to the City Council's lack of decision, leading to an upcoming Ontario Land Tribunal hearing.
  • The hearing was postponed to May 2025 for further instructions.

Decisions and Recommendations

  • City Council adopted recommendations from the City Solicitor's report on December 17 and 18, 2024.
  • Authorized the public release of certain confidential instructions.
  • Accepted a settlement offer and directed the City Solicitor to support it at the tribunal.
  • Required the owner to provide various reports and studies, maintain existing rental units for 20 years, and improve current buildings.
  • Mandated future tenant consultations and a Construction Mitigation Plan.
  • Authorized the City Solicitor to implement the decisions.
AI Generated
Date
2024-12-18 23:00 PM
Motion
Adopt Item
Vote
Absent
Decision body
City Council
Total
13-2
Status
Carried
Dec 18, 2024
2024.PH17.2

Expanding Housing Options in Neighbourhoods - Neighbourhood Retail and Services Study Phase Two Final Report

This report recommends approval of zoning by-law amendments (ZBLA) to permit certain small-scale retail, service and office uses on Residentially-zoned properties within Neighbourhoods city-wide, and to update home occupations permissions in all areas. The ZBLAs provide for a more extensive list of permitted uses on major streets and more limited permissions on streets in the interior of Neighbourhoods. Changes are also proposed to home occupations permissions in all areas. This is the final report for Phase Two of the Expanding Housing Options in Neighbourhoods (EHON) –Neighbourhood Retail and Services Study. The report also recommends approval of a monitoring approach. This study was undertaken with a combined team of staff from the City Planning and Development Review divisions.

 

Draft zoning by-law amendments were presented to the Planning and Housing Committee in May 2024 and have been the basis for public and stakeholder consultations from June to October 2024, as well as internal discussions with City divisions. The proposed amendments have been revised to reflect feedback from these consultations. Amendments with respect to commercial use permissions in the Residential Zone category are appended in Attachment 1. Amendments with respect to home occupation permissions are appended in Attachment 2.

 

Small scale retail, service and office uses historically played an important role in many Toronto Neighbourhoods. This includes corner stores in the old City of Toronto, and small plazas in Etobicoke, York, North York and Scarborough. These uses, however, were strictly limited by Official Plan Policies and Zoning By-law provisions established in the mid-20th century and then carried forward over time into the current Official Plan and City-wide Zoning By-law. As a result, many residents have never had these amenities close to their homes, and others have seen them decline over decades, as existing establishments closed, and new ones did not take their place.

 

Recent developments in the city have enhanced the opportunity and the necessity to create greater opportunities for these community amenities. These changes include the dramatic shift toward working from home, and the anticipated new homes in Neighbourhoods driven by the EHON initiatives including laneway suites, garden suites, multiplexes and, on major streets, townhouses and low-rise apartments, as well as permissions for multi-tenant housing and components of the Housing Action Plan. Neighbourhoods with more residents, who spend more time close to home, are places which need more amenities and can support those amenities with more potential customers, employees and business owners. The focus of the proposed changes are to provide a city-wide policy environment that is more supportive of local businesses and services, allowing the flexibility for different communities to evolve in their own ways. In the pre-war City, “ghost store” buildings that were previously commercial and have switched to residential could be converted back into retail stores. In the parts of the city built in the post-war period, areas which have lost their local plaza or grocery store could see new stores along major streets where they were not permitted in the past.

 

The proposed ZBLAs, Attachments 1 and 2 to this report, build upon Official Plan changes approved by Council in 2022, to further complete and connect communities. The proposed amendments present a balanced approach to permit these uses while minimizing adverse impacts on nearby residents by permitting them in a physical scale, and in locations, that are compatible with and integrated into Neighbourhoods.

Date
2024-12-18 22:12 PM
Motion
Refer Item
Vote
Absent
Decision body
City Council
Total
18-1
Status
Carried
Dec 18, 2024
2024.CC24.2

Policy Framework - City Response to Demonstrations

  • The City Council meeting took place on February 6 and 7, 2024.
  • The focus was on developing a policy framework for managing rallies and protests.
  • The framework aims to align with the City’s Human Rights and Anti-Harassment Policy.
  • The Toronto Police Service will primarily respond to demonstrations, with the City coordinating activities as needed.

Decisions and Recommendations

  • City Council adopted the Policy Framework – City Response to Demonstrations.
  • City agencies and corporations are requested to align their policies with the new framework.
  • The City Manager will report on a proposed bylaw in early 2025 to protect vulnerable institutions and ensure Charter rights.
  • A one-time grant program of up to $2.5 million for community organizations focused on hostile vehicle mitigation will be established in 2025.
  • The item will be forwarded to the Toronto Police Service Board for information.
AI Generated
Date
2024-12-18 21:42 PM
Motion
Adopt Item as Amended
Vote
Absent
Decision body
City Council
Total
22-0
Status
Carried
Date
2024-12-18 21:41 PM
Motion
Adopt Item as Amended
Vote
Absent
Decision body
City Council
Total
21-1
Status
Carried
Date
2024-12-18 21:40 PM
Motion
Adopt Item as Amended
Vote
Absent
Decision body
City Council
Total
22-0
Status
Carried
Dec 18, 2024
2024.CC24.3

SmartTrack Stations Program - Update

  • The City Council meeting focused on the SmartTrack Stations Program.
  • This program aims to enhance transportation in Toronto through five new stations.
  • The total budget for the program is $1.689 billion, funded by the City, Federal, and Provincial governments.
  • Rising costs due to market conditions prompted discussions between the City, Province, and Metrolinx.
  • Two options were evaluated for station prioritization, with a recommendation for Option 2b.

Decisions and Recommendations

  • City Council confirmed the priority for three stations: East Harbour, Bloor-Lansdowne, and St. Clair-Old Weston.
  • The City Manager will request the Province to find funding for two additional stations: Finch-Kennedy and King-Liberty.
  • Ongoing discussions with all levels of government will be initiated to secure funding commitments.
  • A third-party review of cost estimates for all stations will be requested.
  • Confidential information regarding the program will remain private until completion.
AI Generated
Date
2024-12-18 19:15 PM
Motion
Adopt Item as Amended
Vote
Absent
Decision body
City Council
Total
20-3
Status
Carried
Date
2024-12-18 19:14 PM
Motion
Withdraw a Motion
Vote
Absent
Decision body
City Council
Total
19-4
Status
Carried
Dec 18, 2024
2024.RM24.1

Call to Order

  • The City Council meeting was called to order at 9:41 a.m. by Speaker Nunziata.
  • The meeting began with the national anthem, O Canada.
  • A moment of silence was held to honor the discovery of unmarked graves at a former residential school in British Columbia.
  • Council members reflected on the lives of individuals who passed away, including Michael Baum and others.
  • Speaker Nunziata acknowledged the Indigenous Peoples of the land and their cultures, emphasizing the importance of understanding and improving relationships.

Decisions and Recommendations

  • The agenda materials for the meeting were made available online for public access.
  • Acknowledgment of the traditional territories of various Indigenous nations, including the Mississaugas of the Credit and others.
  • Another moment of silence was observed for Ronnie des Vignes and Juana Velarde Gomez.
AI Generated
Date
2024-12-18 17:28 PM
Motion
Extend the Meeting
Vote
Yes
Decision body
City Council
Total
19-3
Status
Carried
Dec 18, 2024
2024.MM24.43

321 Laird Drive - Request for City Solicitor to Attend at the Toronto Local Appeal Body

  • The City Council met to discuss an appeal regarding a minor variance application at 321 Laird Drive.
  • The Committee of Adjustment had previously refused this application on September 26, 2024.
  • The applicant has appealed this decision to the Toronto Local Appeal Body.
  • Urgent action is needed due to upcoming deadlines for party status and expert witness statements.

Decisions and Recommendations

  • City Council directed the City Solicitor to attend the Toronto Local Appeal Body to oppose the appeal.
  • The City Solicitor is authorized to retain outside consultants as needed.
  • The City Solicitor is also authorized to negotiate a resolution and settle the matter on behalf of the City, after consulting with the Ward Councillor and the Director of Community Planning, North York District.
AI Generated
Date
2024-12-18 16:26 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
19-1
Status
Carried
Dec 18, 2024
2024.EC17.4

Shelter Safety Action Plan and Contract Amendments related to Lodging for Asylum Seekers and Refugees, and Community Safety Team Services

The City is committed to prioritizing and continuously improving shelter safety for staff and clients. On April 30, 2024, the Economic and Community Development Committee adopted the Centre for Addiction and Mental Health (CAMH) Shelter Safety Study and directed Toronto Shelter and Support Services (TSSS) to report back on the development of a Shelter Safety Action Plan in consultation with people with lived experience and the Housing Rights Advisory Committee (2024.EC12.13). This report outlines the Shelter Safety Action Plan, which advances the recommendations from the CAMH Shelter Safety Study, and builds on the expertise and guidance from people with lived experience, shelter providers, health and mental health partners, and the Housing Rights Advisory Committee, and sets out an implementation roadmap to support staff and client safety in the shelter system. To continue supporting people experiencing homelessness and living in encampments, including people with complex health and mental health needs, the City requires ongoing commitment, investment, and collaboration with all orders of government, community organizations and sector partners.

 

TSSS continues to implement the City’s 10-year Homelessness Services Capital Infrastructure Strategy, which aims to make physical shelter infrastructure accessible, safer, and better aligned to respond to the diverse needs of shelter clients, staff, and the surrounding community. In response to 2024.EC9.4, City staff have been working to review and improve community safety efforts in and around shelter sites in collaboration with existing community safety services. This includes continued collaboration with Toronto Police Service, Business Improvement Areas, City Divisions, community organizations and institutions, partnership tables, and local networks. In addition, this report seeks City Council authority to amend competitive blanket contracts 47025287 and 47025624 for Community Safety Team Services that enhance safety in shelter for staff and clients, and support two Toronto Community Housing Corporation social housing buildings with a concentration of tenants with complex needs.

 

A report back is provided based on an evidence-informed needs assessment supported by Toronto Public Health to continue overdose prevention at large temporary shelter hotels. The City aims to maintain and expand lifesaving supports available in large shelter hotel sites, which may be particularly important considering proposed provincial legislation which, if passed, may lead to a significant decrease in the availability of overdose prevention services across the city.

 

With the ongoing arrival of refugee claimants to Toronto since September 2021, the City requires the support of all orders of government, community organizations, and sector partners. In follow up to the Council request (2024.EC11.7), this report seeks City Council authority to provide reimbursement to churches and community organizations, many Black-led, for eligible expenses incurred while providing temporary emergency shelter and support to hundreds of refugee claimants who arrived in Toronto in 2023. It also seeks City Council authority to amend and extend non-competitive blanket contract 47024284 with Canadian Red Cross Society to continue providing temporary lodging services for refugees until December 31, 2025. Refugees continue to arrive in Toronto and require services beyond what the purpose-built shelter system can currently provide, as Toronto Shelter and Support Services gradually transitions from temporary shelter hotel sites as part of its Homelessness Services Capital Infrastructure Strategy.

 

These continued efforts are important measures to support people experiencing homelessness in need of immediate support. The City is committed to long-term solutions to homelessness including affordable housing and supportive housing, which, with adequate income support, remain the most important factors to end homelessness and to build safe and secure communities for the people we serve and all residents of Toronto.

Date
2024-12-18 16:17 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
21-1
Status
Carried
Date
2024-12-18 16:16 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
18-4
Status
Carried
Date
2024-12-18 16:15 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
23-0
Status
Carried
Dec 18, 2024
2024.MM24.32

Authority to Enter into Agreement with Scarborough Health Network for the Alteration of City's Watermain and Sewer

  • The Scarborough Health Network presented a Site Plan Application for renovations at Centenary Hospital.
  • The project includes expanding the Emergency Department and critical care clinics.
  • Existing City sewers and a watermain are located on the site, which need to be relocated for the project.
  • The goal is to improve construction coordination and minimize delays for emergency services.

Decisions and Recommendations

  • City Council authorized the General Manager, Toronto Water, to make agreements with Scarborough Health Network for relocating City water and sewer infrastructure.
  • Agreements must meet conditions set by the General Manager and be approved by the City Solicitor.
  • Scarborough Health Network will bear all costs and risks associated with the infrastructure work.
  • The Executive Director, Corporate Real Estate Management, is authorized to secure necessary land interests.
  • City officials are directed to implement the Council's decisions.
AI Generated
Date
2024-12-18 14:49 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
23-0
Status
Carried
Dec 18, 2024
2024.MM24.29

Guns, not Fentanyl and Aliens, is our threat

  • The City Council meeting addressed concerns over U.S. President-elect Donald Trump's proposed tariffs on Canadian goods.
  • Economists generally view tariffs negatively, but they attract attention to pressing issues.
  • Toronto and border communities are facing a rise in violent crime linked to firearms smuggled from the U.S.
  • Statistics show a significant disparity in illegal immigration and drug seizures between Canada and Mexico.
  • Urgency was emphasized due to the upcoming implementation of tariffs on January 20, 2024.

Decisions and Recommendations

  • Councillor Michael Thompson, supported by Councillor Mike Colle, recommended that the Canadian government impose retaliatory tariffs on U.S. goods.
  • Focus on tariffs for delivery trucks, automobiles, and auto parts that may hide smuggled firearms.
  • These tariffs should remain in effect until the flow of firearms into Canada is significantly reduced.
  • The motion was adopted by the City Council on December 17 and 18, 2024.
AI Generated
Date
2024-12-18 14:47 PM
Motion
Adopt Item
Vote
No
Decision body
City Council
Total
20-2
Status
Carried
Dec 18, 2024
2024.MM24.28

30 Charles Street East- Request for City Solicitor to Attend at the Toronto Local Appeal Body

  • On October 1, 2024, the Committee of Adjustment denied a variance application for 30 Charles Street East.
  • The application aimed to allow the construction of an additional rental unit.
  • The owner has a history of neglecting tenant services and not complying with city orders.
  • Tenants have requested support from the City to oppose the owner's appeal of the decision.

Decisions and Recommendations

  • City Council directed the City Solicitor to seek party status at the Toronto Local Appeal Body (TLAB) and attend the hearing in opposition to the appeal.
  • The City Solicitor is authorized to retain outside consultants as needed.
  • The City Solicitor is also authorized to negotiate a resolution of the appeal and settle it if an agreement is reached, in consultation with the Ward Councillor and City Planning leadership.
AI Generated
Date
2024-12-18 14:46 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
21-2
Status
Carried
Dec 18, 2024
2024.MM24.27

Stating in the Strongest Terms Possible, that Proposed Arbitrary Tariffs on Canadian Exports Entering the United States Will Severely Damage Our Respective Economies and Should Be Reconsidered

  • The meeting addressed the significant trade relationship between the United States and Canada, valued at $923 billion in 2023.
  • Concerns were raised about potential tariffs proposed by President-elect Donald Trump, which could harm Canadian exports and provoke retaliation from Canada.
  • Experts warned that tariffs could reduce labor productivity and increase unemployment.
  • The urgency of the discussion was heightened by the upcoming U.S. Presidential Inauguration on January 20, 2025.

Decisions and Recommendations

  • Councillor James Pasternak, supported by Councillor Chris Moise, recommended that City Council formally object to proposed tariffs on Canadian exports.
  • City Council adopted this recommendation during its meeting on December 17 and 18, 2024.
  • The objection will be forwarded to the U.S. Consul General in Toronto for awareness.
AI Generated
Date
2024-12-18 14:44 PM
Motion
Waive Notice
Vote
Yes
Decision body
City Council
Total
19-4
Status
Carried
Dec 18, 2024
2024.MM24.21

187 Oakridge Drive - Request for City Solicitor to Attend at the Toronto Local Appeal Body

  • The City Council held a meeting to discuss an appeal regarding a property at 187 Oakridge Drive.
  • The Committee of Adjustment approved a plan to demolish an existing home and build a new two-storey dwelling.
  • The proposed development exceeds the maximum floor space index allowed by city by-laws.
  • The City Solicitor has already appealed this decision to the Toronto Local Appeal Body to protect the City's interests.

Decisions and Recommendations

  • City Council directed the City Solicitor to continue the appeal against the Committee of Adjustment's decision.
  • The City Solicitor is authorized to attend the Toronto Local Appeal Body with relevant City staff.
  • The City Solicitor can hire outside consultants as needed.
  • The City Solicitor is also authorized to negotiate a resolution regarding the property, consulting with the Ward Councillor and Scarborough District Community Planning.
AI Generated
Date
2024-12-18 14:39 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
21-2
Status
Carried
Dec 18, 2024
2024.MM24.16

Supporting a Fire Fighters Burn Victim Care Centre

  • The meeting discussed the future use of the City-owned building at 641 Eglinton Avenue West, a former Fire Hall.
  • Toronto Fire Fighters Charities Inc. proposed to use the space for a program supporting burn victims.
  • The program, called the "Home Away Program," aims to assist those receiving treatment at Sunnybrook or The Hospital for Sick Children.
  • This initiative would be the first of its kind in Ontario and aims to provide a treatment and education center in Toronto.

Decisions and Recommendations

  • City Council adopted a motion to request the City Manager to report on leasing the building to Toronto Fire Fighters Charities Inc. for the program by the second quarter of 2025.
  • The lease would be at a nominal cost.
  • The City Manager is also tasked with seeking support from the Government of Ontario for the program.
AI Generated
Date
2024-12-18 14:36 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
23-0
Status
Carried
Dec 18, 2024
2024.MM24.15

Toward Municipal Autonomy and Effective Local Governance

  • The City Council meeting addressed concerns about provincial interference in municipal governance.
  • Doug Ford's actions highlight issues with the current constitutional framework, which does not support modern urban needs.
  • Toronto faces challenges in maintaining local democracy and civic engagement due to potential provincial overrides of Council decisions.
  • A proposal for a City Charter was discussed, which would grant Toronto greater autonomy similar to Charter Cities in other regions.

Decisions and Recommendations

  • Councillor Josh Matlow, supported by Councillor Jamaal Myers, recommended establishing a Program Advisory Body focused on Municipal Autonomy and Effective Local Governance.
  • City Council referred Motion MM24.15 to the Executive Committee for further consideration on December 17 and 18, 2024.
  • The aim is to explore how to improve Toronto’s independence and clarify roles between municipal and provincial governments.
AI Generated
Date
2024-12-18 14:35 PM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
13-10
Status
Lost
Dec 18, 2024
2024.MM24.9

Turn Off the Lights: Requesting a Review of the Nuisance Lighting By-law

  • The City of Toronto has bylaws to manage excessive exterior lighting.
  • Current enforcement only applies when light directly shines into a dwelling.
  • Residents have expressed concerns about bright lights from neighboring properties.
  • Investigations revealed that these lights did not violate existing bylaws.
  • A motion was proposed to review the Property Standards by-law to better address indirect light sources.

Decisions and Recommendations

  • Councillor Brad Bradford, supported by Councillor Dianne Saxe, recommended a review.
  • City Council directed the Executive Director of Municipal Licensing and Standards to include recommendations in a report due in the fourth quarter of 2025.
  • The focus will be on strengthening regulations regarding nuisance lighting, particularly for ambient and indirect sources like LED bulbs and soffit lighting.
AI Generated
Date
2024-12-18 14:31 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
17-5
Status
Carried
Date
2024-12-18 14:30 PM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
18-4
Status
Carried
Dec 18, 2024
2024.MM24.2

Investing In Youth, Empowering Our City's Potential: Creation of a Toronto Youth Employment Program

  • The City Council meeting addressed youth unemployment in Toronto, which has reached crisis levels.
  • The highest unemployment rates since 2014 have been noted, especially affecting equity-deserving groups.
  • Increased youth involvement in violence and crime is linked to unemployment.
  • Successful youth employment programs in other cities have shown positive outcomes.
  • The Toronto Youth Cabinet advocated for a dedicated youth employment program, engaging over 30,000 youth.
  • Current initiatives exist but lack coordination and sufficient funding.

Decisions and Recommendations

  • City Council will request additional federal and provincial funding for a Toronto Youth Employment Program.
  • A multi-sector strategy will be developed to create 10,000 summer jobs for youth by 2026.
  • A comprehensive capacity assessment will be conducted to identify potential for expanding youth employment.
  • An inter-divisional table will be established to support the program's implementation.
  • Opportunities for youth employment tied to major events will be explored.
  • Partnerships with successful youth employment agencies will be pursued.
  • The private sector will be engaged to support the program.
  • The motion was referred to the Economic and Community Development Committee for further consideration.
AI Generated
Date
2024-12-18 14:26 PM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
5-17
Status
Lost
Dec 18, 2024
2024.CC24.1

Ombudsman Toronto Report - An Investigation into the City's Decision to Stop Allowing Refugee Claimants into Base Shelter System Beds

  • The City Council meeting took place on December 17, 2024.
  • The meeting addressed an investigation into the City’s decision on refugee claimant shelter access.
  • This investigation was initiated by the Ombudsman Toronto's Housing Unit.
  • A report with 14 recommendations was submitted for City Council's consideration.

Decisions and Recommendations

  • City Council received the Ombudsman's report for information.
  • The Council was recommended to adopt the report and implement its 14 recommendations.
  • Key recommendations included:
    • Following proper amendment processes for shelter standards.
    • Ensuring compliance with human rights policies for shelter eligibility changes.
    • Providing training for staff on anti-Black racism analysis.
    • Developing a framework for analyzing shelter eligibility changes.
    • Engaging with refugee claimants and related organizations for future planning.
    • Providing regular updates on implementation progress.
AI Generated
Date
2024-12-18 14:23 PM
Motion
Reconsider Item
Vote
No
Decision body
City Council
Total
9-14
Status
Lost
Dec 18, 2024
2024.CC24.11

1245 and 1285 Dupont Street, 1260 Dufferin Street, and 213 Emerson Avenue - Ontario Land Tribunal Hearing - Request for Directions

  • The City Council meeting took place on December 17-18, 2024.
  • The meeting addressed an Official Plan Amendment and Zoning By-law Amendment application for specific properties on Dupont Street, Dufferin Street, and Emerson Avenue.
  • The application seeks to increase the height and residential area for a development project, which includes affordable rental units.
  • The City received a settlement offer related to this application, which is time-sensitive due to an upcoming tribunal meeting.

Decisions and Recommendations

  • City Council adopted the confidential instructions from the City Solicitor regarding the settlement offer.
  • The Council authorized the public release of certain confidential instructions if adopted.
  • The Council accepted the settlement offer and directed the City Solicitor to support it at the Ontario Land Tribunal.
  • Several conditions were set for the approval process, including infrastructure assessments and community benefit agreements.
  • An additional 32 affordable rental units were secured for the development.
AI Generated
Date
2024-12-18 12:25 PM
Motion
Adopt Item
Vote
Absent
Decision body
City Council
Total
17-1
Status
Carried
Dec 18, 2024
2024.PH17.7

Relaunch of the Home Ownership Assistance Program to Support New Non-Profit Affordable and Attainable Home Ownership Housing

Toronto is facing two housing crises – one where there is a lack of deeply affordable and supportive homes for low-income, marginalized, and vulnerable residents, as well as those experiencing homelessness; and a more recent one in which rising housing costs have made it increasingly unaffordable for middle income earners, key workers and professionals to live in the city. To respond to this dual crises, City Council has pledged to meet the Provincial housing target of 285,000 housing starts in Toronto by 2031,

 

As Toronto residents continue to struggle with rising inflation and cost of living, it is becoming increasingly difficult even for middle income earners to access the ownership market, including women-led households and those from equity-deserving communities. As of the 2021 Census, home ownership rates for Indigenous and Black-led households were 50 percent lower than the general population, and historical inequities in homeownership levels within low-income, racialized, and other equity-deserving groups means these groups have not experienced the benefits that typically accompany home ownership.

 

This report recommends key changes to the Home Ownership Assistance Program (HOAP), which was first introduced in 2010, enhancing the City’s approach to supporting new non-profit ownership housing development and administration, at a time when new housing solutions are needed across the housing continuum.  HOAP currently provides down payment assistance loans through the deferral of development charges for eligible homeowners.

 

This report recommends key changes to the HOAP program that respond to Toronto’s current housing context, will expand its reach and impact, and other actions to advance affordable home ownership in line with City Council’s target of approving 4,000 affordable ownership homes by 2030:

  • That HOAP eligibility be expanded to include a new “attainable” program tier, with eligible household incomes and home price limits above the “affordable” thresholds prescribed by the City’s Official Plan;
  • That the HOAP incentives package be expanded to increase the City’s contributions to non-profit ownership housing, and extended to include private/non-profit development partnerships, and;
  • That the City provide funding and land contributions where available and appropriate, particularly to support the New Deal modular attainable housing initiative currently underway with the Province of Ontario.

The proposed changes are coordinated with statutory exemptions and discounts to municipal growth funding tools introduced by the Province. Recent legislative changes through Bill 23, the More Homes Built Faster Act, and Bill 134, the Affordable Homes and Good Jobs Act, provide non-profit and affordable rental and ownership housing developers with a variety of statutory exemptions from key municipal fees (development charges, parks levies and community benefits charges). The Province has indicated it would make the City whole for the impacts of legislation changes impacting municipal growth funding tools, but this has not yet been confirmed or received. Through the recommendations of this report the updated HOAP incentives package will build on these statutory exemptions to further support non-profit attainable and affordable housing developments. It is also proposed that the incentive package be extended to non-profit partnerships with private developers, which are currently not eligible for the provincial non-profit exemptions.

 

In 2020, the City’s Auditor General reviewed the City’s affordable ownership housing programs and recommended the program be revised to strengthen administration and oversight, program design, and to better monitor program outcomes. Following the Auditor's recommendations, the Housing Secretariat engaged the consultants Beam Group and BGM Strategy Group to conduct an evaluation of the program and make recommendations for a program redesign and relaunch. The reports prepared by the consultants are provided as Attachments 4 and 5 and support the recommendations and content of this report. The consultants’ reports and the proposed updates to HOAP address the issues raised by the Auditor General.

 

In September 2023, Premier Doug Ford and Toronto Mayor Olivia Chow announced a Working Group of senior public servants from the Government of Ontario and the City of Toronto. The Working Group’s "Ontario-Toronto New Deal Working Group - Term Sheet" was approved by City Council in December 2023 and included a modular attainable housing initiative targeting the development of five sites with Provincial and City support. The recommendations outlined in this report will support future New Deal modular attainable housing developments through the proposed expansion of the HOAP incentives package, as well as funding and land contributions. This report also recommends including HOAP opportunities in appropriate CreateTO and Toronto Community Housing Corporation (TCHC) redevelopments, with suitable TCHC developments providing the opportunity for TCHC tenants to become homeowners.

 

The City of Toronto has provided financial support to low-to-moderate income families and individuals, in the form of down payment assistance loans, and/or for the construction of new affordable home ownership housing, through various Federal/ Provincial and City programs since 2007. Since the introduction of HOAP in 2010, the federal/provincial and City programs have provided some 1,370 down payment assistance loans to eligible households worth a combined $54.5 million.

 

The recommendations in this report will support the delivery of the City’s HousingTO 2020-2030 Plan and targets in partnership with the federal and provincial governments, and non-profit and private development sectors. Increasing the supply of new homes across the housing continuum will reduce pressure throughout the housing system, improve housing affordability for lower and middle-income households, and support the growth of complete communities.

Date
2024-12-18 12:21 PM
Motion
Adopt Item
Vote
Absent
Decision body
City Council
Total
19-0
Status
Carried
Date
2024-12-05
Motion
Adopt Item as Amended
Vote
Yes
Decision body
Planning and Housing Committee
Total
6-0
Status
Carried
Dec 18, 2024
2024.PH17.5

Establishing a Framework to Address Excessive Indoor Temperatures in Leased Residential Premises

Like many cities around the world, Toronto is experiencing the effects of climate change with more frequent and extended heat events taking place outside of seasonal norms. Excessive indoor temperatures are a particular concern for tenants living in leased residential premises without air conditioning, or other cooling equipment such as heat pumps, who are at higher risk of heat-related health impacts. These impacts are intensified in multi-unit residential buildings and broadly in built-up urban environments with limited greenspace.

 

The City regulates indoor temperatures in leased residential premises through Toronto Municipal Code Chapter 497, Heating and Chapter 629, Property Standards. In the short term, heat-related impacts on residents are being managed through existing City measures such as the Heat Relief Strategy and Heat Relief Network, and in the longer term through policy and program initiatives spanning several City Divisions to support building improvements and enhancing the climate resilience of Toronto's aging housing stock.

 

This report outlines the City’s preliminary actions to address excessive indoor temperatures and is the first in a phased reporting approach to address this complex policy challenge. Building on existing measures, this report responds to City Council direction (2023.MM7.8) and endorses establishing a maximum indoor temperature standard of 26°C to protect tenant health from excessive heat, with implementation considerations and next steps to be outlined in a Q4 2025 staff report. This phased approach will allow for comprehensive stakeholder engagement in 2025 and will be informed by technical findings from a C40 Cities project examining the issue in Toronto and other large North American cities.

 

This report also recommends amending Chapter 497, Heating and Chapter 629, Property Standards to adjust the dates when heating and cooling equipment must be turned on and off to proactively address indoor temperatures in the shoulder seasons (i.e. May/June, September/October). The changes are recommended to come into effect on April 30, 2025, prior to the 2025 heat season.

 

This report also includes an update on the status of relevant Council directives and outlines actions taken to enhance the City's data on indoor temperature. The recommendations are informed by an analysis of climate and service request data, a review of public health research, engagement with residents, property owners and subject matter experts and a review of municipal regulations and provincial legislation.

 

Staff are committed to addressing excessive indoor temperatures while balancing the City’s climate and housing objectives to transition to net-zero energy systems, ensure vital services are maintained, and limit potential impacts on rental housing availability and/or affordability.

 

This report was developed by Municipal Licensing and Standards, Toronto Public Health, and Environment and Climate with input from the Customer Experience Division, City Planning, Toronto Building, Toronto Emergency Management, Toronto Employment and Social Services, and the Housing Secretariat. 

Date
2024-12-18 12:01 PM
Motion
Adopt Item as Amended
Vote
Absent
Decision body
City Council
Total
22-0
Status
Carried
Date
2024-12-18 12:00 PM
Motion
Adopt Item as Amended
Vote
Absent
Decision body
City Council
Total
21-1
Status
Carried
Date
2024-12-18 11:58 AM
Motion
Amend Item (Additional)
Vote
Absent
Decision body
City Council
Total
18-4
Status
Carried
Dec 18, 2024
2024.EX19.3

Analysis of Driver Wages in the Vehicle-for-Hire Industry

On February 29th, 2024, Executive Committee adopted EX12.1 - Vehicle-for-Hire and Private Transportation Industries Update Request, requesting staff to analyze driver wages in the vehicle-for-hire industry, which includes taxicabs, limousines and private transportation companies.

 

A team of researchers specializing in research and analysis of the vehicle-for-hire industry in Toronto and internationally, consisting of Dr. Mischa Young from the Université de l’Ontario Français and Dr. Steven Farber and Dr. Mashrur Rahman from the University of Toronto, were retained to complete an assessment of the vehicle-for-hire industry to inform Council about the current state of driver wages. This academic study is supplemented by information about wages and incomes received during public consultations directly from drivers, companies and other stakeholders.

 

The researchers found that the median PTC driver gross earnings was $33.52 per hour in 2023 and $33.18 per hour in 2024 for every engaged hour of work, which includes the time between when a driver accepts a trip request and drops the passenger off. When accounting for all time spent logged onto a platform, including times where there is no passenger, the median driver gross earnings were $25.23 per hour in 2023 and $22.46 per hour in 2024.

 

The researchers also calculated driver expenses, including fuel, insurance, depreciation, maintenance, repairs, financing, fees and taxes and found that after expenses are accounted for, the median driver net earnings were $15.31 per hour in 2023 and $15.34 per hour in 2024 when accounting only for engaged time, and $7.94 per hour in 2023 and $5.97 per hour in 2024 when accounting for all time spent on the platform. Due to a lack of taxicab trip data provided to the City, the researchers were unable to conduct a similar data-driven study of taxicab and limousine driver wages.

 

Wages and employment standards are regulated by the Ontario government through legislation such as the Employment Standards Act and the Digital Platform Workers' Rights Act. This report summarizes this legislation and provides context about their applicability to drivers in the vehicle for hire industry.

Date
2024-12-18 11:35 AM
Motion
Adopt Item as Amended
Vote
Absent
Decision body
City Council
Total
21-2
Status
Carried
Date
2024-12-18 11:33 AM
Motion
Amend Item (Additional)
Vote
Absent
Decision body
City Council
Total
21-2
Status
Carried
Dec 17, 2024
2024.EC17.1

Ombudsman Toronto Housing Unit Status Report 2024

City Council on July 24 and 25, 2024, referred Item CC20.3 to the Economic and Community Development Committee for consideration. 

 

Summary from the report (July 17, 2024) from the Ombudsman on Ombudsman Toronto Housing Unit Status Report 2024.

 

Pursuant to section 170(2) of the City of Toronto Act, 2006 (COTA), the purpose of this report is to provide City Council with a status report describing the activities of Ombudsman Toronto’s Housing Unit since its creation in July 2023. In less than a year, the Housing Unit has been fully staffed, developed its infrastructure, launched two investigations, provided consultations to City staff, and met with more than 170 people through their engagement work. Notably, the Housing Unit has also developed a framework that uses the concept of housing as a human right to guide their investigations, the first of its kind for an Ombudsman organization in Canada.

Date
2024-12-17 17:12 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Dec 17, 2024
2024.AU7.1

Auditor General's Office 2025 Work Plan and Budget Highlights

The purpose of this report is to provide City Council with the Auditor General’s 2025 Work Plan, which contains projects that are in progress or will begin in 2025, and many new projects on the horizon to commence in either late 2025 or 2026. These audit projects are identified through a City-wide risk and opportunities assessment process that is conducted every five years and updated annually for changes in emerging issues, priorities, and trends in allegations made to the Fraud and Waste Hotline. The Auditor General also considers the views and experience of City Councillors and City management. The Auditor General may amend the Annual Work Plan if new priorities arise.

 

This report also provides the 2025 Budget Highlights for information only, as the Audit Committee considers the Auditor General’s 2025 Work Plan. The Auditor General is requesting $8.651 million and this 2025 budget request will be presented directly to the Budget Committee at its meeting on January 15-17, 2025 for consideration. The Auditor General's budget request reflects resources needed to address her 2025 Work Plan.

 

The Auditor General would like to thank the Audit Committee and City Council for their continued support of this Accountability Office, and of the important work we do. We look forward to continuing to add value to the City, make a positive difference in the lives of Torontonians through improved outcomes from our report recommendations, while taking an approach that helps to build relationships with auditees and stakeholders in a respectful manner.

Date
2024-12-17 17:10 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
19-5
Status
Carried
Dec 17, 2024
2024.EX19.21

Proposed Land Lease with the Community Music Schools of Toronto at 1785 Finch Avenue West

This report seeks authority for the City, as landlord, to enter into a nominal lease agreement (the "Land Lease") with Community Music Schools of Toronto (the "Tenant") in respect of a portion of the property at 1785 Finch Avenue West (the "Leased Premises"), to design, build, finance, and operate a new not-for-profit music school. The Leased Premises is a portion of the current parking surface, along with an unused loading dock area, of the site of Toronto Public Library's ("TPL") York Woods Branch ("York Woods Library").

 

With City Council endorsement and direction to explore the feasibility of building a music school next to York Woods Library, City staff now recommend advancing this site for the proposed new music school which will serve the Jane Finch community. The TPL Board supports the proposed Land Lease to the Tenant. Social Development, Finance, and Administration and Economic Development and Culture have advised on the community consultation process, by engaging with a third-party consultant and the Tenant. Additionally, the proposed development of the music school in the Jane Finch community aligns with Action 1.13 of the Jane Finch Community Development Plan (EC10.1); a short-term action aimed at ensuring artists and organizations have access to local spaces to practice, create, exhibit, and operate their organizations.

 

The Tenant is a charitable organization founded in 1999 with a mission to help Toronto youth access high-quality music education. The Tenant's music programs are geared towards students ages three to 18 and are heavily subsidized to provide families who would not usually have access to music education due to their financial situation. Students participating in the Tenant's music programs can access instruments, music education, mentorship, and performance opportunities in a safe, supportive, and creative environment.

Date
2024-12-17 16:44 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
24-0
Status
Carried
Dec 17, 2024
2024.EX19.1

Strengthening the City of Toronto's Housing Development Capacity to Deliver Housing Faster

Toronto continues to face an unprecedented housing affordability crisis across the housing continuum, with a lack of deeply affordable and supportive homes for those with low-incomes, and high rents affecting middle-income earners who aspire to live and work in the city.

 

In Fall 2023, City Council adopted two key reports related to housing delivery:

 

- Item EX9.3, which set the stage for the generational change to transform and strengthen Toronto’s housing system and expedite delivery of the HousingTO and Housing Action Plan targets.

 

- Item EX10.2, which aligned the mandates of CreateTO and Toronto Community Housing (TCHC) and directed these organizations to work with the City on the delivery of the City's housing plans and targets, including new and explicit language on expectations and scope for greater alignment.

 

This report outlines additional steps to advance the City’s role as a Public Developer and supporter of partner projects, by bringing a singular focus to City-led and supported housing development, and strengthening coordination between the City, CreateTO and TCHC to achieve the City's affordable rental housing goals. Specifically, the City will increase its capacity to lead housing development, by establishing a Housing Development Office, reporting to the Deputy City Manager, Development and Growth Services, that will focus exclusively on advancing and accelerating the delivery of housing on City-led and City-supported sites. The City targets having a leader in place to lead the Office by Q2 2025, following a formal, competitive recruitment process.

 

Through this new Office, the City will either lead projects directly or leverage TCHC and CreateTO on a project-by-project basis, based on each organization’s unique expertise and best practices. Staff are recommending updated direction to both organizations, followed by a negotiated Master Service Agreement with the City for each respectively. While work is underway to establish the new Housing Development Office, it is critical that housing projects continue to move forward under the current project leadership structure to ensure no delay in the delivery of housing.

Date
2024-12-17 16:24 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
22-3
Status
Carried
Date
2024-12-17 16:23 PM
Motion
Amend Item (Additional)
Vote
No
Decision body
City Council
Total
16-9
Status
Carried
Date
2024-12-17 16:22 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
24-1
Status
Carried
Dec 17, 2024
2024.CC24.16

Advancing Phase One of the Purpose-built Rental Housing Incentives Stream

  • The City Council meeting took place on November 13-14, 2024.
  • Council adopted the EX18.2 report focused on increasing rental housing supply.
  • A new stream was introduced under the Rental Housing Supply Program for purpose-built rental housing.
  • A Quick Start Call for Applications was initiated to support the creation of 7,000 rental homes, including 1,400 affordable units.
  • The Call for Applications opened on November 18 and closed on November 29, 2024.

Decisions and Recommendations

  • Council authorized the Executive Director, Housing Secretariat to defer development charges for 528 additional rental units.
  • Agreements will be made to defer charges for units with at least 20% affordable housing.
  • A tax exemption for municipal and school purposes was approved for affordable rental homes in these developments.
  • The Deputy Treasurer was authorized to cancel or refund taxes paid after the exemption date.
AI Generated
Date
2024-12-17 15:54 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
22-3
Status
Carried
Dec 17, 2024
2024.BL24.1

Introduction of General Bills and Confirming Bills

  • City Council held a meeting to discuss new legislation.
  • The focus was on General Bills and Confirming Bills.
  • This meeting was part of the regular legislative process.

Decisions and Recommendations

  • City Council passed By-laws 1331-2024 to 1438-2024.
  • The passing of these By-laws is in accordance with Section 226.9 of the City of Toronto Act, 2006.
  • The decision was finalized on December 17 and 18, 2024.
AI Generated
Date
2024-12-17 12:27 PM
Motion
Introduce and Pass Confirmatory Bill
Vote
Absent
Decision body
City Council
Total
22-0
Status
Carried
Dec 17, 2024
2024.IE18.5

Feasibility of Requiring Side Guards on All Commercial Trucks Operating in the City of Toronto, Including Retrofitting the City's Fleet

The purpose of this report is to advise City Council on the feasibility of mandating Lateral Protective Devices (‘side guards’) on all commercial trucks operating within the City of Toronto, including retrofitting the City's fleet. Side guards are protective railings or bars mounted on the sides of large trucks between the axles to prevent individuals from being pulled under a truck’s wheels in the event of a collision.

 

Research from various sources based in the United Kingdom, Australia, and Netherlands indicate that side guards could reduce cyclist fatalities by approximately 62 percent, pedestrian fatalities by 20 percent, and serious injuries for cyclists by 6 percent. However, there are currently no federal or provincial requirements for vehicles to be fitted with side guards. As the federal government sets national vehicle safety standards, the City of Toronto does not have the jurisdiction or authority to mandate all commercial vehicles operating within the City of Toronto be equipped with side guards.

 

However, City Council, through Vision Zero 2.0, authorized the implementation of side guards and a comprehensive fleet safety and accountability program for all Solid Waste Management Services vehicles, both in-house and contracted. Currently, thirty (30) units in the City’s fleet are equipped with side guards.

 

The addition of side guards to Solid Waste Management Services vehicles builds upon new and existing design and technological initiatives aimed at supporting safety. Engineering design changes to advance safety include the use of cabover chassis designs to improve visibility and reduced blind spots, the colouring of heavy-duty vehicles yellow and blue to increase visibility, the provision of convex mirrors for all trucks to widen the driver's field of view, and 360-degree cameras. Additionally, testing technological advancements, such as collision-avoidance sensors, and active driver assist systems provide real-time warnings and enhance driver awareness. The majority of City vehicles are also equipped with telematics devices that provide vehicle intelligence data on driver behaviors to support education and promote greater accountability.

 

As of 2024, commercial vehicles procured by the Fleet Services have included side guards. Vehicles are expected to be delivered within 18 to 24 months following the placement of an order.

 

In alignment with the principles of Vision Zero and previous Council direction regarding Solid Waste Management Services vehicles, Fleet Services is recommending retrofitting suitable commercial City of Toronto fleet vehicles with side guards. Vehicles suitable for retrofitting will be assessed using a risk-based approach to prioritize vehicles that are most likely to cause the greatest harm to cyclists and pedestrians in the event of a collision. It is estimated that 219 of 500 heavy-duty vehicles that are suitable for side guards will be retrofitted between December 2024 and December 2025, with all vehicles retrofitted by December 2026.

 

Fleet Services will also share with relevant City Agencies and Corporations, the best practices learned from retrofitting side guards on City-owned commercial vehicles.

 

In addition, while Fleet Services does not currently require side guards for contracted services, Fleet Services will consult with relevant City Divisions and explore the feasibility of requiring existing and new Suppliers, who use commercial vehicles to provide contracted City services, to have side guards installed on their vehicles, and will report back to City Council in the third quarter of 2025.

Date
2024-12-17 11:45 AM
Motion
Adopt Item as Amended
Vote
Absent
Decision body
City Council
Total
22-0
Status
Carried
Dec 17, 2024
2024.IE18.1

Updates on Vision Zero Road Safety Plan

Since Vision Zero was first adopted by the City in 2016, it has incrementally grown to provide extensive, proactive, systemic and directed initiatives, informed by data and targeted to ensure that serious injuries and fatalities are eliminated on Toronto’s streets. This report provides an update on the Vision Zero Road Safety Plan and outlines continued and new programs, initiatives, and countermeasures.

 

This report provides status updates and recommended improvements to various components of the Vision Zero Road Safety Plan in the following areas:

 

1. Trends in Serious Injuries and Fatalities: describing changes over time for each emphasis area of the Vision Zero Road Safety Plan as well as comparison to other leading jurisdictions;

 

2. Speed Management Initiatives: providing updates on various ongoing and upcoming programs and initiatives under the speed management strategy that help address the frequency and / or outcome of relevant collision scenarios, including recommendations for a number of Community Safety Zones;

 

3. Improving Crossings for Pedestrians: providing updates on measures to address pedestrian crossing protection and recommendations to improve visibility at Pedestrian Crossovers;

 

4. Improving Intersection Safety: providing updates on measures to address safety of all road users at intersections; and

 

5. Other Updates: describing other enforcement measures, progress on other complementary City initiatives and an update on the School Safety Zone program.

 

This report recommends enacting 20 new or extended Community Safety Zones to support installation of Automated Speed Enforcement cameras focused on improving safety for older adults as well as expanding one existing location in Ward 16 as requested by the local Councillor that staff have reviewed and support. This report also recommends revising stopping prohibitions around Pedestrian Crossovers to meet current Provincial guidance.

 

Since 2016, the Vision Zero annual budget and spend rate has increased incrementally reflecting the demand for improved road safety as well as the capacity to deliver. The 2025 proposed budget of $99.1 million - $31.7 million in capital and $67.4 million in operating - is the largest annual budget for the Plan since inception and further demonstrates the importance of this initiative and Transportation Services’ ability to deliver the varied aspects of the work.

Date
2024-12-17 11:43 AM
Motion
Adopt Item as Amended
Vote
Absent
Decision body
City Council
Total
21-0
Status
Carried
Dec 17, 2024
2024.SC18.3

123 Bellamy Road North - Zoning Amendment Application - Appeal Report

On March 15, 2024, a Zoning By-law Amendment application was submitted to permit  the construction of three residential buildings having  44, 35 and 9 storeys in height on the eastern portion of the subject site while retaining the existing 12 storey apartment building on the western portion of the site. Building A and B will be connected with a podium ranging in height from 2 to 6 storeys. Building C will be a standalone mid-rise building ranging in height from 4 to 9 storeys. The proposed buildings will have a gross floor area of 75,251 square metres which combines with the existing building for a total gross floor area of 97,115 square metres and an overall floor space index of 5.16.

 

On October 9, 2024, the applicant appealed the Zoning By-law Amendment application to the Ontario Land Tribunal (the "OLT") due to  City Council not making a decision within the 90-day time frame established in the Planning Act.

 

This Report recommends that the City Solicitor with the appropriate City staff attend the OLT hearing in opposition to the application in its current form, and to continue discussions with the applicant to resolve outstanding issues.

Date
2024-12-17 10:49 AM
Motion
Adopt Item
Vote
Absent
Decision body
City Council
Total
22-0
Status
Carried
Date
2024-12-06
Motion
Adopt Item
Vote
Yes
Decision body
Scarborough Community Council
Total
5-0
Status
Carried
Dec 17, 2024
2024.PH17.6

Exempting Dwelling Rooms in a Multi-tenant House from Parkland Dedication and Clarifications to Exemptions in Article III of Chapter 415 - Development of Land

As part of the 2023 Housing Action Plan, City Council adopted a New Regulatory Framework for Multi-Tenant Housing ("MTH") and recognized this form of rental housing stock as a critical component of affordable housing options. This program brought new incentives and other financial supports to assist property owners in obtaining a licence for this housing in all areas of the City.

 

In response to MM20.30 Multi-Tenant Housing Framework: Parks Levy Exemption and Framework Application, this report seeks Council authority to exempt dwelling rooms in a multi-tenant house from parkland dedication requirements in Article III of Toronto Municipal Code Chapter 415, being the Parkland By-law ("Article III"). This amendment aligns with Council's priority for the development of this housing type and other financial considerations provided by the City.

 

Following Council's recent adoption of MM22.10 Supporting Transitional Housing in Toronto - 3 Cadillac Avenue (Neshama Hospice) and site-specific parkland dedication exemption for the development of a non-profit hospice, this report also seeks approval to apply the exemption to non-profit hospices city-wide to reflect Council's support of this type of development.

 

Finally, this report introduces amendments to Article III to clarify the intent and improve the readability and the interpretation of (a) exemptions relating to additional residential dwelling units on a parcel of land as well as additional residential dwelling units in apartment buildings, and (b) the definition of Environmental Lands specifically relating to the protected features within protected areas as defined and identified by Chapter 658 of the Municipal Code, being the Ravine and Natural Feature Protection By-Law.  The proposed amendments will ensure consistent interpretation and application of Article III.

Date
2024-12-17 10:40 AM
Motion
Adopt Item as Amended
Vote
Absent
Decision body
City Council
Total
21-2
Status
Carried
Dec 17, 2024
2024.EX19.10

2025 Interim Solid Waste Management Services Rates and Fees

This report recommends the adoption by City Council of interim 2025 Solid Waste Management Services (SWMS) Rates and Fees as set out in this report. The adoption of these interim rates and fees is requested in advance of the 2025 Tax and Rate Supported Operating and Capital Budgets to establish these interim rates and fees and provide City staff with the necessary authority to implement them effective January 1, 2025.

 

City Council may amend the interim rates when the 2025 Tax and Rate Supported Operating and Capital Budget is approved, which is expected in February 2025.

 

This report recommends an interim 3.75 percent increase in SWMS rates and fees effective January 1, 2025. The recommended increase, shown in Table 1 below by customer grouping, will allow Solid Waste Management Services to maintain all current service levels and address future capital needs.

 

Table 1: Interim Solid Waste Management Services Rates and Fees effective January 1, 2025 

 

Customer Group

Interim Rate Increase

 

Comments

Multi-Residential

3.75%

Maintain service levels and fund Capital Program

Single Family and Residential Units    Above Commercial (RUAC)

3.75%

Maintain service levels and fund Capital Program

Bag Tags, Bin Purchase

3.75%

Maintain service levels and fund Capital Program

Commercial, Divisions, Agencies        and Corp., Schools

3.75%

Maintain service levels and fund Capital Program

Date
2024-12-17 10:33 AM
Motion
Adopt Item
Vote
Absent
Decision body
City Council
Total
19-4
Status
Carried
Dec 6, 2024
2024.SC18.15

Megan Avenue - Traffic Calming (Speed Humps)

  • The meeting involved the Scarborough Community Council.
  • The council has the authority to make final decisions delegated by the City Council.
  • Transportation Services presented a report on traffic calming measures for Megan Avenue.
  • Staff confirmed that the criteria for speed humps were met according to the updated Traffic Calming Policy.

Decisions and Recommendations

  • The council authorized the installation of speed humps on Megan Avenue, between Lawrence Avenue East and Beechgrove Drive.
  • The City Solicitor was directed to prepare a by-law for the installation of eight speed humps on the specified section of Megan Avenue.
  • The speed limit will be reduced from 40 km/h to 30 km/h on Megan Avenue, between Lawrence Avenue East and Flerimac Road, pending approval.
  • The speed limit will also be reduced from 50 km/h to 30 km/h on Megan Avenue, between Flerimac Road and Beechgrove Drive, pending approval.
AI Generated
Date
2024-12-06
Motion
Adopt Item
Vote
Yes
Decision body
Scarborough Community Council
Total
6-0
Status
Carried
Dec 6, 2024
2024.SC18.12

Metrolinx Scarborough Subway Extension - Long-term Temporary Road Closures and Public Highway Dedication - Kennedy Station Connection, Emergency Exit Building-1, and Lawrence East Station

As the Toronto Transit Commission (TTC) operates transit service on McCowan Road, Lawrence Avenue East, and Eglinton Avenue East, City Council approval of this report is required.

 

Construction of the Scarborough Subway Extension (SSE) Kennedy Station Connection, Emergency Exit Building-1 (EEB-1) and Lawrence East Station will require long-term temporary road closures and associated traffic by-law amendments. Additionally, certain road segments on Eglinton Avenue East, Midland Avenue, McCowan Road and Lawrence Avenue East will require temporary realignment to create sufficient space for construction activities while maintaining traffic flow and access for vehicles and pedestrians. These temporary diverted sections of the roadways, located on Metrolinx-owned or privately-owned lands, will need to be designated as public highways to ensure compliance with municipal standards and facilitate enforcement of traffic by-laws. The public highway dedication will become effective upon the transfer of the required land interest to the City and the registration of the highway designation bylaw on those lands.

 

This staff report seeks City Council approval for the long-term temporary road closures and traffic by-law amendments along the east Service Road, Eglinton Avenue East, Winter Avenue, McCowan Road and Lawrence Avenue East for the construction of the Kennedy Station Connection and EEB-1 and Lawrence East Station. Additionally, the report seeks approval for public highway dedication by-laws to temporarily designate portions of diverted roadways as public highways upon the transfer of the required land interest to the City.

 

Furthermore, the report seeks City Council approval for an extension of the temporary east sidewalk closure on McCowan Road, between Sheppard Avenue East and Nugget Avenue till June 30, 2026. This extension is required to accommodate the ongoing tunnel boring operations, which have experienced schedule adjustments due to challenges associated with the tunnel boring machine operation and maintenance.

 

The report also seeks City Council approval for an extension of the existing temporary closure of Eglinton Avenue East, between Midland Avenue and Huntington Avenue, and the temporary closure of Commonwealth Avenue at Eglinton Avenue East to facilitate construction at the tunnel extraction shaft site on Eglinton Avenue East and Midland Avenue. This time extension is requested until December 31, 2030, inclusive.

Date
2024-12-06
Motion
Without Recommendations
Vote
Yes
Decision body
Scarborough Community Council
Total
6-0
Status
Carried
Dec 6, 2024
2024.SC18.17

Lawrence Avenue East and Valia Road/Private Driveway - Traffic Control Signals

As the Toronto Transit Commission (TTC) operates a transit service on Lawrence Avenue East, City Council approval of this report is required.

 

Transportation Services is requesting approval to install traffic control signals at the intersection of Lawrence Avenue East and Valia Road/private driveway.  The traffic control signals will provide enhanced safety for all road users and is justified based on the assessment undertaken.

Date
2024-12-06
Motion
Adopt Item
Vote
Yes
Decision body
Scarborough Community Council
Total
6-0
Status
Carried
Dec 6, 2024
2024.SC18.16

Rouge Hills Drive - Traffic Calming (Speed Humps)

  • The meeting involved Scarborough Community Council.
  • The Council had authority to make final decisions delegated by City Council.
  • Transportation Services presented a report on traffic calming measures.
  • The focus was on installing speed humps on Rouge Hills Drive.

Decisions and Recommendations

  • The Council authorized the installation of speed humps on Rouge Hills Drive between Island Road and Lawrence Avenue East.
  • The City Solicitor was directed to prepare a by-law for the installation of 13 speed humps in the specified area.
  • The speed limit on Rouge Hills Drive was reduced from 40 km/h to 30 km/h, to be implemented alongside the speed humps.
AI Generated
Date
2024-12-06
Motion
Adopt Item
Vote
Yes
Decision body
Scarborough Community Council
Total
6-0
Status
Carried
Dec 6, 2024
2024.SC18.14

Euclid Avenue - Traffic Calming (Speed Humps)

  • The meeting involved the Scarborough Community Council.
  • The council had the authority to make final decisions delegated by the City Council.
  • The focus was on traffic safety on Euclid Avenue.
  • Transportation Services assessed the need for speed humps based on the Traffic Calming Policy.

Decisions and Recommendations

  • The council authorized the installation of speed humps on Euclid Avenue, between Morrish Road and Meadowvale Road.
  • The City Solicitor was directed to prepare a by-law for the installation of 13 speed humps in the specified area.
  • The speed limit on Euclid Avenue will be reduced from 40 km/h to 30 km/h, to coincide with the speed hump installation.
AI Generated
Date
2024-12-06
Motion
Adopt Item
Vote
Yes
Decision body
Scarborough Community Council
Total
6-0
Status
Carried
Dec 6, 2024
2024.SC18.20

Renaming Rosebank Park in Memory of Councillor Cynthia Lai

  • The City Council meeting focused on a proposal to rename Rosebank Park.
  • The proposed new name is “Cynthia Lai Park” in honor of the late Councillor Cynthia Lai.
  • Councillor Lai was a dedicated public servant and the first immigrant woman of Asian descent elected in Scarborough.
  • The proposal received strong community support through petitions and outreach efforts.
  • There was no opposition from park users or community stakeholders.

Decisions and Recommendations

  • The Scarborough Community Council directed the City Manager to review the name “Cynthia Lai Park.”
  • The review aims to rename Rosebank Park to honor Councillor Lai, who represented Ward 23 - Scarborough North.
  • The General Manager of Parks Forestry and Recreation is to report back in the second quarter of 2025.
  • A biographical plaque will be included in the proposal, following the City of Toronto’s Commemorative Framework and Property Naming Policy.
AI Generated
Date
2024-12-06
Motion
Adopt Item as Amended
Vote
Yes
Decision body
Scarborough Community Council
Total
6-0
Status
Carried
Dec 6, 2024
2024.SC18.9

20 Shirley Crescent - Application to Remove a Private Tree

  • The meeting involved the Scarborough Community Council discussing a permit request.
  • The request was for the removal of a privately owned tree at 20 Shirley Crescent.
  • The tree in question is a healthy silver maple measuring 153 cm in diameter.
  • The applicant expressed concerns about the tree's health and potential risks.
  • City Tree By-laws protect the tree, stating it is maintainable.

Decisions and Recommendations

  • The Acting Director of Urban Forestry recommended denying the permit for tree removal.
  • The Scarborough Community Council ultimately took no action on the permit request.
  • The applicant plans to appeal the decision regarding the denial of the permit.
AI Generated
Date
2024-12-06
Motion
Adopt Item
Vote
No
Decision body
Scarborough Community Council
Total
3-3
Status
Lost (tie)
Dec 5, 2024
2024.PH17.11

Housing Accelerator Fund: Expanding Permissions in Neighbourhoods for Six Units and Four Storeys - Preliminary Report

  • The City Council met to discuss the Housing Accelerator Fund application.
  • The focus was on enabling zoning for residential buildings with up to six units and four storeys across the city.
  • This builds on previous permissions for multiplexes and an ongoing study in Ward 23.
  • The meeting aimed to review current policies, trends, barriers, and a proposed workplan for expanding zoning permissions.

Decisions and Recommendations

  • City Council directed staff to report back by Q2 2024 on zoning opportunities for six-unit buildings.
  • The Planning and Housing Committee requested that lessons from the Ward 23 study be considered for city-wide implementation.
  • Staff will conduct consultations in 2025 and provide a proposals report in Q4 2025 for public consultation and potential implementation.
AI Generated
Date
2024-12-05
Motion
Amend Item
Vote
No
Decision body
Planning and Housing Committee
Total
5-1
Status
Carried
Nov 14, 2024
2024.MM23.6

Proclaiming December as Christian Heritage Month

  • The City Council meeting focused on the recognition of the Christian faith in Canada.
  • Christianity is the most practiced religion in the country, with over half of the population identifying as Christian.
  • December is a significant month for Christians, marked by celebrations of Jesus Christ's birth and various cultural expressions.
  • Other municipalities in Canada have already proclaimed December as Christian Heritage Month.

Decisions and Recommendations

  • Councillor Nick Mantas, supported by Councillor Frances Nunziata, proposed a proclamation.
  • City Council decided to officially proclaim December as Christian Heritage Month on November 13 and 14, 2024.
  • The proclamation aims to celebrate the contributions of the Christian faith alongside other religious and cultural groups in the community.
AI Generated
Date
2024-11-14 21:57 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
11-4
Status
Carried
Nov 14, 2024
2024.MM23.1

Declaring Toronto a Paid-Plasma-Free Zone

  • The City of Toronto recognizes the importance of voluntary blood and plasma donation.
  • The city is influenced by Canada’s past tainted blood crisis, which resulted in many deaths.
  • The Royal Krever Commission advocated for a non-payment blood donation system.
  • The Ontario government has laws against paying donors for blood or plasma.
  • Concerns have arisen regarding for-profit plasma clinics, particularly one planned by Grifols Pharmaceuticals in Toronto.
  • The public health community is worried about potential exploitation of vulnerable residents.

Decisions and Recommendations

  • City Council opposed the operation of private for-profit blood collection companies in Toronto.
  • The Council decided to inform Canadian Blood Services, health ministers, Grifols Pharmaceuticals, and Ontario municipalities about their stance.
  • They called for support of only voluntary blood and plasma collection, where donors do not receive payment.
AI Generated
Date
2024-11-14 21:37 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
14-5
Status
Carried
Date
2024-11-14 14:47 PM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
22-4
Status
Carried
Nov 14, 2024
2024.CC23.14

710 The West Mall - Ontario Land Tribunal Hearing - Request for Directions

  • On July 27, 2023, a Zoning By-law Amendment application was submitted for a 22-storey residential building at 710 The West Mall.
  • The City Council refused the application, leading the applicant to appeal to the Ontario Land Tribunal on March 6, 2024.
  • A Case Management Conference is scheduled for February 10, 2025, requiring further direction from the City Solicitor.

Decisions and Recommendations

  • City Council adopted confidential instructions from the City Solicitor on November 13 and 14, 2024.
  • The Council authorized the public release of some confidential recommendations.
  • The City Solicitor will support a settlement at the Ontario Land Tribunal.
  • The Council will ensure various reports and studies are submitted and approved before the Zoning By-law Amendment is finalized.
  • A parking permit restriction was approved for residents at 710 The West Mall.
  • The City Solicitor was authorized to implement the decisions made.
AI Generated
Date
2024-11-14 21:20 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
18-3
Status
Carried
Date
2024-11-14 21:19 PM
Motion
Amend Item (Additional)
Vote
No
Decision body
City Council
Total
19-2
Status
Carried
Nov 14, 2024
2024.PH16.1

Housing Action Plan: As-of-Right Zoning for Mid-rise Buildings on Avenues and Updated Rear Transition Performance Standards - Final Report

The recommended As-of-right Zoning for Mid-rise Buildings on Avenues is one of 54 Housing Action Plan initiatives to make changes to the City’s Official Plan, Zoning By-law and Urban Design Guidelines to enable more housing in neighbourhoods, along major streets and avenues. Other related action items include: the Expanding Housing Options in Neighbourhoods (EHON) Major Streets Study, As-of-Right Zoning for Avenue Studies with no Implementing Zoning, the Avenues Policy Review, Expanding Mixed Use Areas, and Implementing Zoning for new Mixed Use Areas. City Planning has either reported out on the actions such as the Major Streets Study or is working to advance these action items in a comprehensive and integrated manner.

 

This report recommends a zoning by-law amendment to permit as-of-right heights and densities for mid-rise buildings on lands identified as Avenues and designated Mixed Use Areas in the Official Plan. The recommended zoning by-law amendment implements urban design performance standards, including updated standards for rear transition alongside the increases to height and density permissions. These changes will enable and expand mid-rise development on the Avenues without the need for a site-specific zoning approval. Property owners would continue to be able to seek additional height or density through a minor variance where appropriate.  The recommended changes have the potential to unlock an increase of almost 61,000 dwelling units above the approximately 21,500 dwelling units achievable under existing zoning standards.

 

The recommended zoning by-law amendment would remove barriers, ease administration, and support the creation of more housing as part of the Housing Action Plan to achieve or exceed the provincial housing target of 285,000 new homes over the next 10 years.

 

City Planning has also been conducting a comprehensive review of the Mid-Rise Building Performance Standards Urban Design Guidelines and has completed initial updates to the performance standards for Rear Transitions between mid-rise buildings and other buildings or open space uses. The final updated Rear Transition Performance Standards 5A and 5B will be formally incorporated in the consolidated Mid-rise Building Urban Design Guidelines document and presented to Planning and Housing Committee in Q4 2024.

Date
2024-11-14 21:12 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
18-3
Status
Carried
Date
2024-11-14 21:11 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
20-1
Status
Carried
Date
2024-11-14 21:10 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
14-7
Status
Carried
Nov 14, 2024
2024.IE17.3

Temporary Street Closure for Eastbound F.G. Gardiner Expressway and Northbound Don Valley Parkway - 2025 Toronto Triathlon Festival

The purpose of this report is to seek City Council's authority to close portions of the eastbound lanes on the F.G. Gardiner Expressway and northbound lanes on the Don Valley Parkway for the Toronto Triathlon Festival event for 2025. The proposed route of the 2025 Toronto Triathlon Festival event will remain the same as 2024.

Date
2024-11-14 20:30 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
19-2
Status
Carried
Nov 14, 2024
2024.CC23.16

49-59 Lawrence Avenue East - Ontario Land Tribunal Hearing - Request for Directions

  • The City Council meeting took place on November 20, 2023.
  • The agenda included an Official Plan and Zoning By-law Amendment application for a residential building at 49-59 Lawrence Avenue East.
  • The proposal includes a 9-storey building with 40 units and underground parking for 41 vehicles.
  • The applicant appealed to the Ontario Land Tribunal due to the City Council's inaction on the application.
  • The City Solicitor needs updated instructions for upcoming tribunal hearings on January 20, 2025.

Decisions and Recommendations

  • City Council adopted recommendations from the City Solicitor's report.
  • Confidential instructions to staff were approved and made public.
  • The Council accepted a settlement offer and directed the City Solicitor to support this at the Ontario Land Tribunal.
  • Specific requirements for the proposal were outlined, including various studies and reports to be submitted by the owner.
  • The City Solicitor was authorized to take necessary actions to implement the Council's decisions.
AI Generated
Date
2024-11-14 20:24 PM
Motion
Adopt Item
Vote
No
Decision body
City Council
Total
15-7
Status
Carried
Nov 14, 2024
2024.EC16.2

Sidewalks to Skylines: An Action Plan for Toronto's Economy (2025-2035)

It has been over a decade since the launch of Collaborating for Competitiveness, the City of Toronto’s last plan to advance economic development, with a focus on job creation and economic growth. Since then, new trends, challenges, and opportunities have emerged both at the global and the local level, reshaping the city's and regional industry competitiveness, supply chains, workforce dynamics and land use pressures. Given its fundamental strengths, Toronto is well positioned to face these challenges and leverage opportunities toward an economy that is competitive, inclusive, and advancing towards net zero emissions. Achieving this vision, however, will require a long-term plan with impactful actions, dedicated resources, and intentional and collaborative coordination with partners. Before aspirational targets for inclusive and sustainable economic growth can be met, the integrity of basic City services and the foundation they create for economic growth must first be addressed. This Action Plan sets out a vision to both get the basics right and set an aspirational agenda to drive Toronto's economy forward, confronting its challenges and leveraging its many strengths.

 

Guided by this bold vision, Sidewalks to Skylines - an Action Plan for Toronto's Economy (2025-2035) provides a roadmap for the City to strategically maximize its levers and collaborate with its partners to enhance Toronto's economy with a focus on livability, inclusivity, and prosperity in the next ten years. The Action Plan is the result of robust research and analysis of best practices in other jurisdictions, as well as extensive engagement and consultation with over 1,000 stakeholders, including business leaders, academics, small businesses, business associations, major employers, institutions, community coalitions, labour unions, and residents. It identifies three priorities: Strong Main Streets, Quality Jobs, and Global Competitiveness. These priorities are anchored by a foundational priority, Getting the Basics Right, which focuses on key City levers to improve quality of life and enable a business environment that optimizes conditions to achieve broader economic ambitions and facilitate economic prosperity.

 

The success of the Action Plan will be dependent on effective partnerships; it will also depend on the access to resources and revenues commensurate with the City's responsibilities as a municipal government to support Toronto's role as Canada's leading global centre for commerce, creativity, and capital. To guide these efforts, in addition to a five-year work plan, the Action Plan highlights 29 leading actions, including 10 to strengthen the foundation and 19 to advance the priorities to drive meaningful change. To monitor the progress of the Action Plan, each of the 29 leading actions is accompanied by one or more success indicators. Progress will be reported to City Council on an annual basis.

 

In 2030, informed by the success of and lessons learned from the first five years, a new five-year work plan responsive to the economic context of the time will be presented for consideration by City Council. Through the implementation of the Action Plan, the City will help advance liveability, inclusion, and shared prosperity beyond the traditional measure of economic growth in partnership with other organizations and for all communities across Toronto.

Date
2024-11-14 20:19 PM
Motion
End Debate
Vote
No
Decision body
City Council
Total
15-5
Status
Carried
Nov 14, 2024
2024.EC16.1

Culture Connects: An Action Plan for Culture in Toronto (2025-2035)

Culture Connects: An Action Plan for Culture in Toronto (2025-2035) sets an ambitious 10-year vision for Toronto as a city for culture and creativity, where everyone, everywhere, can discover, experience, and create culture. This vision positions Toronto as an undeniable global cultural capital, celebrated for its exciting and expansive cultural and creative industry offerings as well as its accomplished talent. Culture is engrained in this city, making Toronto a better place to live, work, and visit. It drives economic growth, strengthens community bonds, and promotes social well-being, helping to create thriving, healthy communities.

 

It has been over a decade since the City’s last culture plan, Creative Capital Gains, was introduced in 2011. Since then, there have been significant economic, cultural, and societal shifts – and a devastating global pandemic. Emerging from the COVID-19 pandemic, Toronto’s culture sector is at an inflection point and faces great instability. Challenges include access to space, affordability, equity, changing audience habits, and sponsor supports. As emphasized in public consultations, the Action Plan also has a significant focus on ensuring culture becomes more available to people across the city, wherever they live, close to their homes, and embedded in their communities. A new Action Plan is needed to address the current obstacles and seize the opportunities of the next 10 years. Inaction would threaten Toronto’s vibrancy, liveability, and prosperity. Now is the moment to invest in culture, chart a forward path, and reinforce and reimagine culture in Toronto.

 

Culture Connects: An Action Plan for Culture in Toronto (2025-2035), included as Attachment 1, has been shaped and guided by community input. The Action Plan includes 28 actions grouped into four priority areas: 1) Culture Everywhere; 2) Culture for All; 3) Culture for the Future; and 4) Culture Beyond our Borders. These priorities are based on input shared by more than 4,000 residents throughout the Action Plan’s community engagement process, comprehensive research conducted by the University of Toronto, and best practices from leading cities from around the world.

 

This report outlines the need for an action plan, detailing the engagement process and key results as well as the Action Plan’s vision, priorities, and core components. This includes the Year One focus, the framework for ongoing engagement, and accountability measures, such as regular progress reporting.

 

The Action Plan includes both urgent actions to immediately address critical challenges, and long-term actions to drive systemic change. The urgent need to invest and connect will be the focus of Year One of the Action Plan, including increased support for the Toronto Arts Council; funds to support stabilization and transformation for cultural organizations; and hosting the inaugural Mayor’s Culture Summit. Throughout its implementation, the Action Plan will focus on impacts and outcomes, continued engagement, transparency, and accountability. With Culture Connects, the City presents a bold strategy to transform current realities and seize opportunities to create a vibrant and prosperous future for culture in Toronto.

Date
2024-11-14 19:42 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
18-2
Status
Carried
Date
2024-11-14 19:18 PM
Motion
End Debate
Vote
No
Decision body
City Council
Total
10-12
Status
Lost
Nov 14, 2024
2024.MM23.10

Analyzing the Compensatory Aspects of a Councillor's Office

  • The meeting followed the introduction of the "Better Local Government Act" in July 2018.
  • Bill 5 reduced Toronto City Council from 44 to 25 seats.
  • The law faced legal challenges, culminating in a Supreme Court decision in October 2021.
  • The 2018 election resulted in the election of 25 Councillors and a Mayor.
  • Council increased staff budgets to manage the larger volume of work.
  • A motion was passed to review Councillor compensation, but no report has been presented since.

Decisions and Recommendations

  • City Council requested a report from the City Manager and Chief People Officer for the March 2025 meeting.
    • This report will include a comparative review of Councillor compensation and recommendations for adjustments.
    • An approach for regular reviews of Councillor compensation will also be included.
  • The City Clerk will report by the fourth quarter of 2025 on modernizing job descriptions, salary bands, and compensation for staff in Members’ offices.
AI Generated
Date
2024-11-14 18:50 PM
Motion
Adopt Item as Amended
Vote
No
Decision body
City Council
Total
15-2
Status
Carried
Date
2024-11-14 14:52 PM
Motion
Waive Referral
Vote
No
Decision body
City Council
Total
20-5
Status
Carried
Nov 14, 2024
2024.MM23.34

Appointment of Fire Chief and General Manager, Toronto Fire Services

  • The City Council meeting took place on October 9, 10, and 11, 2024.
  • Matthew Pegg, the previous Fire Chief, left the position on October 4, 2024.
  • Larry Cocco was appointed as Interim Fire Chief until a new Chief is selected.
  • A Fire Chief is crucial for the stability of fire and emergency services in the city.

Decisions and Recommendations

  • City Council directed the City Manager to conduct reference checks and negotiate a contract with a candidate for Fire Chief and General Manager of Toronto Fire Services.
  • The appointment will be effective from January 2, 2025, or when the candidate signs the contract.
  • Necessary actions will be taken to introduce a bill for the appointment under the Fire Protection and Prevention Act, 1997.
  • Confidential information about the candidate will remain private until conditions are met.
  • The City Manager is authorized to announce the candidate's name once conditions are satisfied.
AI Generated
Date
2024-11-14 17:57 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
22-0
Status
Carried
Nov 14, 2024
2024.MM23.26

Toronto Transit Commission Environmental Report for the Conversion of the Scarborough Rapid Transit Right-of-Way, Busway Project - Tara Avenue and Mooregate Avenue Bus Stop

  • The meeting addressed the Toronto Transit Commission's Environmental Project report for the Scarborough Rapid Transit Right-of-Way, Busway project.
  • A public commenting period is open until November 4, 2024.
  • Concerns were raised by the community regarding a proposed bus stop at Tara Avenue and Mooregate Avenue.
  • Feedback included a petition signed by 176 residents opposing the bus stop due to issues like increased foot traffic, accessibility, and safety.

Decisions and Recommendations

  • Councillor Michael Thompson, supported by Councillor Nick Mantas, recommended removing the bus stop at Tara Avenue and Mooregate Avenue.
  • The recommendation aimed to redirect cost-savings to other Toronto Transit Commission priority projects.
  • City Council did not adopt Motion MM23.26 during the meeting on November 13 and 14, 2024.
AI Generated
Date
2024-11-14 17:56 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
5-17
Status
Lost
Nov 14, 2024
2024.CC23.1

Respecting Local Democracy and Cities

  • The City Council meeting addressed concerns about provincial Bill 212.
  • The Bill aims to overturn local decisions made by the Toronto City Council.
  • The Mayor emphasized the importance of City Council's authority and expertise.
  • A review of the City’s options regarding the Bill is underway, with recommendations to be presented before the next meeting on November 13, 2024.

Decisions and Recommendations

  • City Council opposed the proposed amendments in Bill 212 that contradict the City of Toronto Act, 2006.
  • Requested the Province to collaborate with cities on congestion and road safety, and withdraw the Bill.
  • Directed the City Solicitor to review Bill 212 and report on potential litigation.
  • Authorized City representatives to testify at public hearings on the Bill.
  • Opposed any costs from the Bill's amendments being incurred by the City.
  • Forwarded the Council's position to various provincial leaders and organizations.
  • Requested publication of the Transportation Tomorrow Survey 2022 results.
  • Directed the City Manager to explore signage regarding traffic delays due to the Bill.
  • Maintained confidentiality of certain report attachments until authorized for publication.
AI Generated
Date
2024-11-14 17:49 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
14-11
Status
Carried
Date
2024-11-14 17:48 PM
Motion
Amend Item
Vote
No
Decision body
City Council
Total
6-18
Status
Lost
Date
2024-11-14 17:46 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
23-2
Status
Carried
Nov 14, 2024
2024.MM23.32

80 Guestville Avenue - Revoking a Building Permit

  • The City Council meeting addressed concerns regarding 26 N13 notices issued to tenants at 80 Guestville Avenue.
  • The landlord claims renovations are needed, but no work has started despite building permits being issued.
  • This situation suggests a potential renoviction, a tactic used by landlords to evict tenants and increase rents.
  • The Building Department can revoke permits if work does not begin within six months, which could protect tenants from eviction.

Decisions and Recommendations

  • Councillor Frances Nunziata, supported by Councillor Paula Fletcher, proposed a motion.
  • City Council requested the Chief Building Official and Executive Director, Toronto Building, to investigate the construction status of the permits at 80 Guestville Avenue.
  • The Council urged consideration of permit revocation if construction has not seriously started within the six-month period, in line with the Building Code Act, 1992.
AI Generated
Date
2024-11-14 15:26 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
24-0
Status
Carried
Nov 14, 2024
2024.MM23.20

Renewal of Below Market Rent Lease Agreement with Toronto Azzurri Soccer Club

  • The City Council meeting discussed the Toronto Azzurri Soccer Club, a not-for-profit tenant at 4995 Keele Street.
  • The club has a Below Market Rent lease established in 2006 for 20 years.
  • It operates various soccer programs and has expanded its facilities to include a parking lot and additional sports.
  • The property is also linked to future Toronto Water projects, specifically the expansion of a drinking water reservoir.
  • A timely lease renewal is necessary for the club to secure funding for community programs.

Decisions and Recommendations

  • City Council approved a 10-year nominal lease renewal for the Toronto Azzurri Soccer Club, effective July 1, 2025, to June 30, 2035.
  • The Executive Director of Corporate Real Estate Management will negotiate and finalize the lease terms with relevant departments.
  • Authorization was given to prepare and execute any necessary documents for the lease renewal.
AI Generated
Date
2024-11-14 15:17 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
25-0
Status
Carried
Nov 14, 2024
2024.MM23.18

Protecting Tenants from Price-Fixing on Rental Apartments

  • The City Council meeting addressed rising rents in Toronto.
  • Rent increases are linked to vacancy decontrol and the removal of rent control by the Ford government for newer buildings.
  • There are concerns about price collusion among landlords using algorithmic software, similar to ongoing investigations in the U.S.
  • The software in question, Yieldstar, has been used in Canada since 2017, raising questions about its impact on the rental market.

Decisions and Recommendations

  • City Council requested a report from the City Manager by mid-2025 on:
    • The use and mechanisms of software enabling rent price-fixing by landlords.
    • Possible municipal actions to restrict such software.
  • City Council urged the Government of Ontario to amend the Residential Tenancies Act, 2006, to prohibit the use of software that facilitates rent price-fixing.
AI Generated
Date
2024-11-14 15:13 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
24-1
Status
Carried
Nov 14, 2024
2024.MM23.16

171 Pendrith Street - Request for City Solicitor to Attend at the Toronto Local Appeal Body

  • The City Council meeting addressed the appeal of a decision made by the Committee of Adjustment.
  • The appeal concerns a minor variance application for a new three-storey detached dwelling at 171 Pendrith Street.
  • The application was approved despite concerns about inadequate front yard landscaping and potential harm to a mature City-owned tree.
  • The City Solicitor has already appealed the decision to the Toronto Local Appeal Body, making the matter urgent.

Decisions and Recommendations

  • City Council directed the City Solicitor to appeal the Committee of Adjustment’s decision regarding the property.
  • The City Solicitor was authorized to attend the Toronto Local Appeal Body to oppose the development.
  • The City Solicitor can retain outside consultants as needed for the case.
  • The City Solicitor was also authorized to negotiate a settlement of the appeal, with discretion after consulting relevant officials.
AI Generated
Date
2024-11-14 15:10 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Nov 14, 2024
2024.MM23.14

Provincial Overreach and Toronto's Infrastructure

  • The City Council meeting addressed issues affecting Toronto, a major North American city with a diverse population.
  • Toronto plays a crucial role in Ontario's economy, contributing significantly to provincial revenues.
  • City Councillors represent local interests and manage public infrastructure amidst competing demands.
  • Recent legislation, including Bill 23 and Bill 212, has negatively impacted the city's infrastructure budget and governance.

Decisions and Recommendations

  • Councillor Dianne Saxe, supported by Councillor Amber Morley, proposed a recommendation.
  • The City Manager should write to the Premier of Ontario and all municipalities.
  • The letter will protest the overreach of Bill 212 and request respect for municipal jurisdiction over infrastructure management.
  • The recommendation specifically asks for the withdrawal of section 195.2 of the Highway Traffic Act.
  • Item MM23.14 was deemed redundant by the Speaker during the meeting.
AI Generated
Date
2024-11-14 15:09 PM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
21-4
Status
Carried
Nov 14, 2024
2024.MM23.13

Providing Safety and Convenience for Midtown Residents: Moving Forward with a Pedestrian Scramble at Yonge and Eglinton

  • The meeting focused on pedestrian safety at Yonge and Eglinton intersection, a densely populated area in Toronto.
  • A recent count showed over 40,000 pedestrians crossed the intersection in one day, the highest in the city from 2020-2024.
  • Residents often face long waits to cross the street during peak times.
  • Construction at the intersection is complete, and the community awaits the opening of the Eglinton Crosstown LRT.

Decisions and Recommendations

  • Councillor Josh Matlow, supported by Councillor Mike Cole, proposed a motion.
  • City Council requested a feasibility report from the General Manager of Transportation Services.
  • The report is to assess the implementation of a pedestrian scramble at Yonge and Eglinton after the Eglinton Crosstown LRT is operational.
  • The deadline for the report is set for the second quarter of 2025.
AI Generated
Date
2024-11-14 14:57 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
24-1
Status
Carried
Nov 14, 2024
2024.MM23.12

16 Martindale Road - Request for City Solicitor to Attend at the Toronto Local Appeal Body

  • The City Council meeting took place on November 13 and 14, 2024.
  • The Committee of Adjustment had previously refused an application for variances at 16 Martindale Road.
  • The refusal was based on concerns about the proposed new dwelling's compliance with the Official Plan and Zoning By-Law.
  • The owner appealed this decision to the Toronto Local Appeal Body, with a hearing scheduled for January 28, 2025.
  • An urgent motion was needed for the City to respond before the deadline of November 25, 2024.

Decisions and Recommendations

  • City Council authorized the City Solicitor to attend the Toronto Local Appeal Body to support the refusal of the application.
  • The City Solicitor was given the authority to hire outside consultants if needed.
  • The City Solicitor was also authorized to negotiate a resolution regarding the application, in consultation with the Ward Councillor and the Director of Scarborough District Community Planning.
AI Generated
Date
2024-11-14 14:56 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
24-1
Status
Carried
Nov 14, 2024
2024.IE17.4

Parkside Drive Study Final Report

Parkside Drive is a major arterial road that serves as the eastern boundary of High Park and provides multi-modal connections to key destinations in the city with residential frontage on the east side. As directed by Council in November 2021, the Parkside Drive Study was initiated to explore possible design changes that could improve safety and mobility along the corridor with a focus on people walking, cycling and other vulnerable road users, as a companion to the High Park Movement Strategy. Over the last three years several improvements have been made to the roadway to manage vehicle speeds and improve road user safety.

 

The Parkside Drive Study builds on community advocacy for improved road safety. In the last ten years there were seven collisions that resulted in five serious injuries and three fatalities. All seven collisions involved vulnerable road users. Narrow and missing sidewalks, lack of bikeways, excessive vehicular speeds and aggressive driving, and a history of collisions resulting in fatality or serious injury are frequently heard concerns. The Parkside Drive Study recommendations support the City's Vision Zero Road Safety Plan efforts to implement changes that would prevent serious injuries and fatalities on our streets.

 

This report summarizes the findings from the Parkside Drive Study and seeks City Council endorsement in principle of the study recommendations to implement a road safety focused redesign project. Preliminary design and consultation for the road safety project on Parkside Drive have been completed, and installation is targeted for the near-term (2025 - 2027). The Parkside Drive road safety changes would add 3.8 lane kilometres (1.9 centreline kilometres) of new bikeways, reconstruct the Lake Shore Boulevard West intersection and improve vulnerable road user connections to the Martin Goodman Trail and include design changes to decrease motor vehicle speeds.

Date
2024-11-14 14:45 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
19-7
Status
Carried
Nov 14, 2024
2024.PH16.3

Expanding Housing Options in Neighbourhoods - Beaches-East York Pilot Project - Official Plan and Zoning By-law Amendments - Decision Report - Approval

The Beaches-East York Pilot Project (“the Pilot Project”) is part of the Expanding Housing Options in Neighbourhoods ("EHON") initiative. The Pilot Project was initiated with the purpose of building a missing middle demonstration project in consultation with the community and the development industry on City-owned land within the Beaches-East York neighbourhood (Ward 19).

 

This report recommends amending the Official Plan and Zoning By-law to permit a development on a City-owned site located at 72 Amroth Avenue. The proposal includes a six-storey apartment building fronting Amroth Avenue with a height of 19.5 metres (23.5 metres with the mechanical penthouse), and a three-storey fourplex with a height of 9.95 metres and a three-storey duplex with a height of 9.65 metres at the rear of the lot. The development has a total of 34 residential units, 39 bicycle parking spaces and 2,353 square metres of gross floor area.

 

The proposal is an appropriate example of intensification within designated Neighbourhoods. It is in a form that is respectful of the adjacent low-rise detached houses, while making use of an underutilized site near a major transit station and adjacent Danforth Avenue. The Danforth Study from Coxwell Avenue to Victoria Park Avenue further recommends a mid-rise built form of up to eleven-storeys on this segment of Danforth Avenue. It advances a design which includes the provision of six accessible units, exceeding the Toronto Accessibility Design Guidelines requirement for 15 percent of the total number of units be accessible and adaptable, and a unit mix which meets the City of Toronto Growing Up Guidelines regarding the provision of two and three-bedroom units. As a City-initiated project, it will meet at least Version 4, Tier 2 of the Toronto Green Standard. The proposal preserves the five existing mature trees on site.

 

The processes and approaches developed through this initiative are intended to inform how missing middle projects may be built on other sites, both publicly and privately owned. In support of this goal, City staff have also developed a set of Key Findings to inform the creation of future policy and process changes for expanding housing options in neighbourhoods, including work on transition zones through the Housing Action Plan and work on enabling permissions for low-rise multi-unit residential buildings through the Housing Accelerator Fund. The Key Findings are included as Attachment 16 of this report.

 

City staff recommend approval of the City-initiated Official Plan and Zoning By-law amendments and associated recommendations.

Date
2024-11-14 14:41 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
24-1
Status
Carried
Nov 14, 2024
2024.PH16.13

Building More Missing Middle - Addressing Gaps in Multiplex Permissions

On May 10, 2023, City Council adopted Official Plan and Zoning By-law Amendments to permit multiplexes city-wide. In recent years, Toronto City Council has made significant strides toward eliminating exclusionary zoning and promoting gentle density in Neighbourhoods across the city, including by legalizing multiplexes, garden suites, laneway suites, and permitting small-scale apartments on Major Streets.

 

A primary objective of the award-winning Expanding Housing Options in Neighbourhoods (EHON) program is to legalize diverse housing types as-of-right. The minor variance process often leads to delays and increased costs, hindering the construction of new housing units. It is essential to address gaps in the zoning by-law to ensure consistent interpretations, rather than relying on the discretion of individual planners or the Committee of Adjustment.

 

Stakeholders have raised concerns that the current interpretation of the Zoning By-law 569-2013 amendment to permit multiplexes is creating obstacles to building multiplex housing. Recently, applications for semi-detached fourplexes have been classified as one single apartment building instead of two multiplexes. This classification impacts building code requirements, financing options, and incentives – creating a barrier to building more missing middle housing.

 

One of the most powerful policy tools we have to enable more missing middle housing is development charge (DC) exemptions. Multiplexes with four or fewer units on a single property have development charges waived on the second, third, and fourth units. This waiver is vital: on a smaller missing middle project, the tens of thousands of dollars in development charges can make the difference between a project being financially feasible or cost prohibitive.

 

However, if an applicant intends to build a five-unit multiplex – the threshold at which they can access low-cost Canada Mortgage and Housing Corporation financing – they have to pay development charges on all five units, making such projects less financially feasible.

 

A gap in the policy also exists where a builder or developer is building a four-plex in addition to a garden suite and/or a laneway suite. While Council has approved the development charge exemption for up to four units and a separate deferral program for development charges on laneway and garden suites, attempting to build both at once can trigger development charges on all units in the multiplex. This runs counter to the policy objective of maximizing the number of housing units in missing middle projects and must be addressed.

 

The Multiplex Study Final Report recommended establishing a monitoring program to track the uptake of new builds and to identify challenges in achieving multiplex housing. In line with that planned report, this motion requests that City Planning staff provide clarity on the correct interpretation of the zoning by-law. This motion is also requesting that the City Solicitor and Finance and Treasury Services consider revising the development charge bylaw to help enable more missing middle projects to move forward.

Date
2024-11-14 14:38 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
24-2
Status
Carried
Date
2024-11-14 14:36 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
24-2
Status
Carried
Nov 14, 2024
2024.PH16.4

Implementing a Rental Renovation Licence By-law to Address Renovictions

This report responds to the June 26, 2024, City Council directive to staff to develop a “Hamilton-style” renovictions bylaw (Renovictions Bylaw) and implementation framework to protect tenants and prevent "renovictions". A renoviction is when a landlord illegitimately evicts a tenant by alleging that vacant possession of a rental unit is needed to undertake renovations or repairs. Renovictions can include refusing to allow a tenant who has exercised their right of first refusal to return post-renovation, illegally raising the rent on a returning tenant, or not undertaking major renovations after evicting renters. This results in the displacement of tenants, the permanent loss of affordable market rental housing, and contributes to rising homelessness in Toronto.

 

As rent policies and landlord-tenant matters fall under provincial jurisdiction, the City of Toronto has urged the Province to take action against renovictions, including enforcing the Helping Homebuyers, Protecting Tenants Act, 2023 (Bill 97), improving Landlord and Tenant Board processes, introducing vacancy rent control, requiring temporary relocation assistance during renovations, and creating a centralized data system for rental properties and evictions. In the absence of these provincial changes, Toronto has developed local solutions. In 2022, City Council adopted a Renovictions Policy to guide the development of a bylaw to curb evictions done under the pretext of a renovation, protect tenants, and preserve affordable rental housing.

 

The City of Hamilton was the first Ontario municipality to pass a bylaw requiring landlords to obtain a licence before undertaking renovations that necessitate tenant eviction. In June 2024, the Planning and Housing Committee reviewed a staff report analyzing Hamilton’s bylaw and directed staff to undertake consultations with affected stakeholders and recommended a similar approach for Toronto. Over August and September, the City undertook a multi-channel consultation program consisting of focus groups with housing advocates, tenants rights experts, landlord and tenants associations, six city-wide in-person consultations and one virtual consultation, and a public survey. The results of this feedback, and analysis by City staff, have informed the Renovictions Bylaw proposed in this report that will require landlords to:

 

  • Apply for a Rental Renovation Licence within seven days of issuing an N13 notice to end tenancy

 

  • Obtain a building permit before applying for the Rental Renovation Licence

 

  • Obtain and submit a report from a qualified person identifying that the renovation or maintenance work is so extensive that the tenant must leave the unit, and pay a Rental Renovation Licence fee of $700.00 per unit

 

  • Post a Tenant Information Notice at the subject unit to inform the tenant of the licence application and to enable the tenant to seek information about their rights

 

  • Complete a plan to provide tenant(s) who choose to return to their units with temporary, comparable housing at similar rents, or provide monthly rent-gap payments (based on post-2015 average market rents) to cover the rent difference, with tenants finding their own temporary housing

 

  • Provide moving allowances to all tenants

 

  • Provide tenants with severance compensation where the tenant is choosing not to return to the unit after the renovation or repair work is complete

 

  • Post the issued Rental Renovation Licence on the door of the unit

 

This report recommends the Renovictions Bylaw take effect on July 31, 2025, allowing staff sufficient time to undertake appropriate education and communication efforts. The Toronto Building Division will implement and enforce the bylaw. Toronto Building staff are well positioned to inform landlords of their obligations under the bylaw early in the building permit process and will develop clear, understandable and multi-lingual public-facing guidelines to support compliance.  Staff heard clearly during public engagement of the importance of proactively updating tenants on the status of renovation licence and building permit-related work. Toronto Building will be actively monitoring building permits on units where renovation licences have been issued to support the timely completion of work and facilitate the ability of tenants to return to their rental unit as quickly as possible.

 

The proposed framework is intended to balance the need to address the misuse of renovations as an excuse to evict tenants, with the need for renovations and repair work that are necessary in Toronto with its often aging, existing rental housing stock. Adopting Toronto’s Renovictions Bylaw will significantly improve health, social, and economic outcomes for tenants and support the HousingTO Plan.

 

This staff report has been written in consultation with the Housing Secretariat, Municipal Licensing and Standards, Legal Services and Strategic Public and Employee Communications.

Date
2024-11-14 11:48 AM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
25-1
Status
Carried
Date
2024-11-14 11:47 AM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
25-1
Status
Carried
Date
2024-11-14 11:46 AM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
24-2
Status
Carried
Date
2024-10-30
Motion
Adopt Item as Amended
Vote
Yes
Decision body
Planning and Housing Committee
Total
7-0
Status
Carried
Nov 14, 2024
2024.CC23.19

3374 Keele Street - Zoning Amendment Application - Request for Direction

  • A City Council meeting was held regarding a Zoning By-law amendment application.
  • The application aimed to permit a 29-storey residential building with 296 units, following a previous proposal for a 12-storey building.
  • The applicant appealed to the Ontario Land Tribunal due to a lack of decision from the City Council within the required timeframe.
  • The City Solicitor sought direction for the upcoming tribunal hearing.

Decisions and Recommendations

  • City Council adopted confidential instructions from the City Solicitor.
  • The public release of certain confidential recommendations was authorized.
  • City Council accepted a settlement offer and directed the City Solicitor to support it at the tribunal, pending various conditions related to infrastructure, transportation, and environmental concerns.
  • The owner must fulfill parkland dedication requirements through cash-in-lieu before any building permits are issued.
  • The City Solicitor was authorized to take necessary actions to implement these decisions.
AI Generated
Date
2024-11-14 09:56 AM
Motion
Adopt Item
Vote
Absent
Decision body
City Council
Total
21-1
Status
Carried
Nov 13, 2024
2024.EX18.7

CaféTO Business Improvement Area (BIA) Pilot Programs Update and Toronto Municipal Code Amendments for 2025

The CaféTO program supports Toronto's neighbourhoods and local economy by providing expanded outdoor dining opportunities for bars and restaurants. Since 2020, the program has continued to improve and evolve with each outdoor dining season (May 1 to October 15) based on a commitment to the city's economic recovery and balancing the diverse needs of Toronto's communities. While the City has expanded outdoor dining programs to include permitting programs for sidewalk and curb lane cafes, hardscaped surfaced parks, and through zoning provisions on private property, the focus of this report will be curb lane cafés located on the right-of-way, which is led by Transportation Services with support from Economic Development and Culture.

 

Since the CaféTO program became permanent in 2023, staff have implemented the Council-approved BIA Curb Lane Pilot Program. This initiative also enhances the efficiency of program rollout by allowing Business Improvement Areas (BIAs) to design streetscape and curb lane closures that meet the unique needs of their neighbourhoods. Throughout the 2024 CaféTO season and during the implementation of the Pilot Program, staff frequently engaged BIAs, restaurant operators and industry associations for feedback. This input will be used to inform improvements for the program in 2025.

 

Following an evaluation of the BIA Curb Lane Pilot Program, this report recommends that the pilot program become permanent and include recommended improvements identified over the 2023 and 2024 implementation seasons. In addition, staff have developed a second pilot program to provide the opportunity for retail businesses to temporarily use public parklets within the BIAs that are part of the Curb Lane Pilot program. It is recommended that this second pilot program be extended for another year to collect additional data. The report also outlines the 2024 CaféTO Property Improvement Program and introduces the new Dining District Grant.

 

Furthermore, this report recommends technical updates to the City of Toronto Municipal Code Chapter 742, Sidewalk Cafés, Parklets and Marketing Displays. The recommended changes include:

 

-Adjusting the timeline to cancel a café permit application if permit fees have not been paid;

-Amending the community notification process for flankage café applications;

-Allowing permit holders on King Street East and West, between Jarvis Street and Bathurst Street, the option to apply for and operate curb lane cafes seasonally, from both October 16 to April 30, and from May 1 to October 15.

 

Additional technical and wording amendments to Chapter 742 and 937, Temporary Closing of Highways, Chapter 27, Council procedures and Chapter 441, Fees and Charges are also proposed.

Date
2024-11-13 18:19 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
20-1
Status
Carried
Date
2024-11-13 18:18 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
21-0
Status
Carried
Nov 13, 2024
2024.AU6.2

Reinforcing the Importance of Openness, Fairness and Transparency in City Procurement: An Audit of the Procurement and Implementation of the PayIt Unsolicited Proposal

In March 2021, City Council considered a staff report, DM30.1 – Swiss Challenge Negotiated Request for Proposals for a Digital Government Platform, that detailed the Swiss Challenge Negotiated Request for Proposals process and outlined next steps for negotiation with the successful supplier, PayIt. At that time, City Council adopted a motion requesting the Auditor General to consider a review of the Strategic Partnerships Office (also known as the Toronto Office of Partnerships) as part of the next Auditor General’s Annual Work Plan, with a focus on its relationship to public procurement[1]. An audit was subsequently added to the Auditor General’s Office Work Plan[2].

 

The objective of this audit was to review the procurement of the PayIt Platform and outcomes achieved to date, to identify lessons learned and opportunities to clarify and / or improve the City’s Unsolicited Quotations for Proposals Policy and Process for Receiving and Reviewing Unsolicited Quotations and Proposals. The audit aimed to answer the following questions:

 

- Did the procurement with PayIt properly follow the City’s policy and process for unsolicited proposals?

 

- Did the implementation of the PayIt Platform achieve the intended financial and non-financial outcomes and benefits (as reported to City Council)?

 

Our audit report does not comment on the quality and advantages of the PayIt platform, as the audit solely focused on whether the City followed its unsolicited proposals policy and process and whether the City’s reported intended outcomes were achieved. In general, we found that PayIt followed the lead of City project staff.

 

This report presents the result of the audit. The report highlights that:

 

a. The policy and process for unsolicited proposals were not followed, even after concerns were raised internally amongst City management.

 

b. Expected benefits and outcomes of the PayIt implementation were not fully realized within the original timeframes indicated in the business case included in staff reports to City Council.

 

c. Records supporting key decisions were not properly retained.

 

The nine recommendations in this report are aimed at strengthening the oversight, and policy and process for receiving, reviewing, and responding to unsolicited proposals. This audit report also reinforces the importance of management’s leadership and commitment to ensuring openness, fairness, and transparency in City procurement.


[1] Agenda Item History - 2021.DM30.1 (toronto.ca)
[2] Refer to the Project Horizon for 2022-2023 included in Auditor General's Office 2022 Work Plan (toronto.ca) and the Project Horizon for 2024 included in Auditor General's Office 2023 Work Plan (toronto.ca)

Date
2024-11-13 18:15 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
11-11
Status
Lost (tie)
Date
2024-11-13 18:13 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
21-0
Status
Carried
Nov 13, 2024
2024.AU6.1

Audit of Parks Branch Operations - Phase 1: Improving Oversight of Day-to-Day Maintenance Helps to Ensure City Parks are Beautiful, Clean and Safe

The Auditor General’s 2023 Work Plan included an operational review of how the Parks, Forestry and Recreation Division manages and maintains over 1,500 parks in the City of Toronto. This report presents the first phase of the operational review, which focuses on the efficiency of daily park maintenance activities, compliance with the established service level standards, and identifying opportunities for improving how the Parks Branch performs day-to-day maintenance to help keep parks beautiful, clean, and safe.

 

The Parks, Forestry and Recreation Division’s mission is to improve the quality of life of Toronto’s diverse communities by providing safe, beautiful parks, a healthy, expanding urban forest, and high quality, community-focused recreational experiences. The Parks Branch is responsible for on-going care and maintenance of City-operated parks, including various amenities found in each park.

 

Our audit identifies opportunities for the Parks, Forestry and Recreation Division to improve parks crew productivity, supervision of maintenance activities and measuring the achievement of service level standards by:

 

a. Leveraging technology and improving scheduling, tracking, and monitoring processes.

 

b. Strengthening monitoring and on-site supervision of daily maintenance activities.

 

c. Setting performance expectations and measuring outcomes.

Date
2024-11-13 16:37 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
10-14
Status
Lost
Nov 13, 2024
2024.EX18.17

FIFA World Cup 2026 Toronto: Revenue Opportunities to Support Hosting Obligations, Procurement Plan Revisions, and Social Procurement and Community Workforce Development Updates

At its meeting on November 4, 2024, the FIFA World Cup 2026 Subcommittee considered
Item FWC2.1 and made recommendations to City Council.

 

This report provides an update on planning for the FIFA World Cup 2026 (FWC26) in Toronto, including a revenue strategy identifying ways to offset expenditures, a progress update on community workforce development and business opportunities for local and diverse suppliers through FWC26 procurements, and current state of play of the procurements, including awarded contracts to date and requests to award and negotiate on items captured in a confidential attachment. 

 

With planning ongoing and budget estimates converting from forecast to actuals, the cost of some goods and services quoted back are higher than projected. This report puts forward a revision to the procurement plan for goods and services for both capital and operational services previously approved by City Council on July 24, 2024 (EX16.32).

 

As has been previously reported to City Council, the estimated costs to host the FWC26 in Toronto total $380.0 million, which includes all operations, safety and security, and capital upgrades to ensure the City meets all FIFA requirements. Of the $380.0 million required to deliver the games $201.4 million is being offset by provincial and federal funding, resulting in the City required to identify a total of $178.6 million (or 47% of total costs). Of this, $83.6 million in revenue has been previously identified through existing municipal sources, commercial rights sales, rental fees, and in-kind contributions. As requested through EX11.12 – Update on Hosting FIFA World Cup 2026, this report outlines additional financial opportunities to the City of Toronto to offset the $95.1 million in remaining funding requirements without impacting the property tax base, including a review of existing revenue tools and new opportunities made available by hosting the games, such as donations, merchandise sales, music royalties, new commercial sales opportunities and revenues specific to FIFA Fan Festival. The FWC26 Toronto Secretariat, in consultation with Finance & Treasury, will continue to explore these targeted revenue opportunities. As they are further developed and refined, staff will report back to the FWC26 Subcommittee, as applicable, with additional information.

 

As the world’s most-watched sporting event, FWC26 represents a major economic opportunity for Toronto, the Province of Ontario, and Canada, as it welcomes hundreds of thousands of visitors. As noted above, the City is responsible for 47% of total costs, however has limited tools to capture revenue associated with the economic activity and benefits associated with hosting the games. Staff have undertaken a review of available funding sources to support the delivery of the FWC26 with the objective of restricting any potential impact on the existing property tax base and planned projects.

 

Of the revenue tools enabled by the City of Toronto Act, 2006 (COTA), the Municipal Accommodation Tax (MAT) provides the most effective opportunity to generate revenue directly from increased economic activity resulting from FWC26, while ensuring no impact to the City’s property tax base. Implementing a temporary incremental increase to the MAT, applied to hotels and short-term rentals, of 2.5% over a 14-month period (June 1, 2025 – July 31, 2026) is projected to generate an additional $56.6 million in revenue, offsetting the majority of the remaining funding requirement. It is anticipated that any potential impacts on hospitality operators will be largely offset by increased room demand and related visitor spending in the lead up, during, and following the FWC26, as well as substantial future benefits due to Toronto’s global visibility gained from hosting the FWC26.

 

In addition to recommending a temporary increase, staff will continue to monitor base performance of the MAT prior to the FWC26, along with other corporate revenues, which could help to further alleviate any remaining budget pressures. Further, to address any remaining funding requirements, staff also remain committed to ensuring cost mitigation strategies are in place for the delivery of the games to minimize financial impacts on the City of Toronto, residents, and businesses.

Date
2024-11-13 15:30 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
21-4
Status
Carried
Nov 13, 2024
2024.DM23.1

Extending Voting Opportunities in City Polls to 16- and 17-Year-Olds

  • The meeting discussed the possibility of lowering the voting age from 18 to 16 in Toronto.
  • This change aligns with movements in other Canadian municipalities to extend voting rights to younger individuals.
  • Evidence from cognitive and political science supports the idea that 16- and 17-year-olds are capable voters.
  • International examples show that lowering the voting age can increase civic engagement among youth.

Decisions and Recommendations

  • Councillor Dianne Saxe, supported by Councillor Lily Cheng, proposed that the City Clerk report on how to reduce the voting age in neighbourhood polls from 18 to 16.
  • City Council adopted this recommendation, with a report expected by the end of the first quarter of 2025.
  • The change aims to enhance youth participation in local governance and community issues.
AI Generated
Date
2024-11-13 14:47 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
18-6
Status
Carried
Date
2024-11-13 14:46 PM
Motion
End Debate
Vote
Yes
Decision body
City Council
Total
18-6
Status
Carried
Nov 13, 2024
2024.EX18.2

Build More Homes: Expanding Incentives for Purpose Built Rental Housing

Toronto is facing two housing crises – one where there is a lack of deeply affordable and supportive homes for low-income, marginalized, and vulnerable residents, as well as those experiencing homelessness; and a more recent one in which rising rents have made it increasingly unaffordable for middle income earners, key workers and professionals to live in the city. To respond to this dual crisis, City Council has pledged to meet the Provincial housing target of 285,000 housing starts in Toronto by 2031, and has expanded its HousingTO 2020-2030 Action Plan (HousingTO Plan) targets to approve 65,000 rent-controlled homes, including rent-geared-to-income (RGI) and affordable rental homes, by 2030.

 

An adequate supply of purpose-built rental homes is central to a well-functioning housing system that can meet the housing needs of current and future residents. However, Toronto is facing a shortage of purpose-built rental homes as a direct result of insufficient investments from all orders of government since the early 1990s. As governments stepped back from investment in new purpose-built rental homes, new private investment in condominiums increased leading to a situation where 85% of all new rental homes created in Toronto in the past 10 years are from the secondary market (wherein condominium investors rent out their units). These homes provide less security for renters than purpose-built rentals, and on average have rental rates that are over 40% higher than existing purpose-built rental homes.

 

The current lack of purpose-built rental housing in Toronto is likely to worsen due to high interest rates and financing costs, inflation, and increasing construction costs which have resulted in a significant slowdown in new residential development. Housing starts in the City of Toronto for August and September, 2024, are down 75% and 81% respectively over the same months last year, indicating a significant slowdown in new housing development. Further, industry data indicate that between 18,000 to 26,000 purpose-built rental homes are currently stalled due to challenging market conditions.

 

All orders of government have historically played a larger role in shaping the housing system to create new purpose-built rental homes than they do today. While there have been recent federal and provincial actions aimed at supporting new rental housing development (including GST/HST waivers on purpose-built rental homes, and development charge discounts for rental units), these have not proven sufficient to significantly increase purpose-built rental housing supply. While the City has made significant investments in housing in recent years, particularly affordable rental housing, the constraints on the City’s finances are considerable and it cannot trade-off investments in infrastructure with un-capped incentives for purpose-built rental housing. Much more action is required from the federal and provincial governments to achieve the level of rental housing growth needed in Toronto, Ontario, and Canada.

 

The City is prepared to take a number of actions and lead the way in building a housing system that delivers the new rental homes Toronto’s current and future residents and economy needs to thrive. This report recommends City Council unlock 20,000 new rental homes comprised of 16,000 new purpose-built rental homes, and 4,000 affordable rental homes, primarily on private land. This report also recommends City Council invite other orders of government to collaborate with the City in making a generational shift in the housing system, where governments influence the housing system and work with private land-owners and investors to make the delivery of purpose-built rental housing a priority. As directed by Council in June, 2024, staff have undertaken consultation with industry stakeholders, and conducted extensive analysis with an independent third-party consultant, in order to inform the development of the recommendations in this report.

 

These 20,000 new homes will be delivered under a new Purpose-Built Rental Homes Incentives stream (as part of the recently approved Rental Housing Supply Program). A minimum of 20% of these homes will be provided as affordable rental homes, meeting the City’s new income-based definition of affordable rental housing, and be secured for a target of 99 years and a minimum of 40 years.  

 

To move immediately to action, this report also recommends City Council:

-  Support 7,000 new rental homes comprised of 5,600 purpose-built rental homes, and at least 1,400 affordable rental homes, to be identified through a rapid call for applications which will be released immediately upon Council approval;

-  Approve a New Multi-Residential Property (Municipal Reduction) Tax Subclass consistent with EX16.8, and direct staff to implement a 15% property tax reduction for all new purpose-built rental developments for a 35-year period as part of the 2025 budget process; and

-  Immediately support the 5,600 purpose-built rental homes by deferring development charges otherwise payable in respect of an eligible development, for as long as the development maintains the rental tenure.

 

The estimated value of the deferral of developments changes for 5,600 purpose-built rental homes is $210.8 million. Like all new purpose-built rental homes, they will also benefit from the 15% reduction in property taxes for 35 years (estimated value of $114.2 million).

 

The City’s contributions towards these purpose-built rental homes will complement financial incentives for the at least 1,400 affordable rental homes to be delivered through this call (estimated at $136.2 million, including foregone property taxes for 40 years and waived planning and building fees).

 

Subject to adoption of this report, staff will report back to Council on an implementation tool to provide incentives for purpose-built rental homes. To this end, staff will consider the use of a Community Improvement Plan, among other options.

 

The City’s jurisdictional and financial capacity to shift the housing system is limited, and it cannot act alone. As such, this report recommends City Council:

-  Request the Province immediately establish a Build More Homes Rebate estimated at $1.0 billion, for the value of development charges and 85% of property taxes for 10,400 purpose built rental homes. - ----  Upon approval by the Province, the City will release a call for applications to offer incentives for the next 13,000 rental homes, including 20% affordable rental homes (2,600 units);

-  Request the federal government to immediately allocate a $7.3 billion portfolio of low-cost financing to support the delivery of the new affordable and purpose-built rental homes described in this report (20,000 homes total); and

-  Request the federal and provincial governments work with the City in implementing a Canada-Ontario-Toronto Builds program that will align efforts and resources across three orders of government including land, funding & financing, partnerships, and approvals processes, to build more affordable and purpose-built rental homes for low- and moderate-income residents.

 

The proposed two-phase strategy to reach 20,000 new rental homes, including 4,000 affordable rental homes, is summarized in Table 1 below.

 

Table 1 – Summary of Rental Housing Outcomes Proposed through this Staff Report

Phase 1 - City–supported Quick Start

1,400

5,600

7,000

Phase 2 -Subject to Intergovernmental Support

2,600

10,400

13,000

Sub-total

4,000

(20%)

16,000
(80%)

20,000
(100%)

 

New federal and provincial housing programs including the Housing Accelerator Fund (HAF) and Building Faster Fund (BFF) have made capital funding contributions contingent on municipalities achieving targets for new housing starts. In addition to meeting the demand for rental homes, increasing new rental housing supply can support the City in accessing much needed capital funding which can be directed to funding new rent-geared-to-income and affordable rental homes, and housing enabling infrastructure.

 

Without immediate action by all orders of government to shape the housing system by ensuring sufficient supply of purpose-built rental homes, more residents, specifically renters, will experience housing instability and potentially homelessness; Toronto’s health and social service sector will face a deepening key worker staffing crisis; and Toronto’s businesses will be unable to attract the workforce and labour supply they need to grow, thereby limiting our economic growth.

Date
2024-11-13 12:30 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Nov 13, 2024
2024.RM23.7

Review of the Order Paper

  • The City Council held a meeting to review the Order Paper.
  • The meeting focused on adopting the agenda and items for upcoming dates.

Decisions and Recommendations

  • On November 13, 2024, City Council adopted the Order Paper with amendments.
  • All other items not held on consent were also adopted.
  • On November 14, 2024, City Council adopted the Order Paper with amendments.
AI Generated
Date
2024-11-13 10:53 AM
Motion
Adopt Order Paper as Amended
Vote
Yes
Decision body
City Council
Total
23-0
Status
Carried
Nov 13, 2024
2024.PH16.2

Low-Rise Residential Lands in the Toronto and East York District of the City of Toronto, to Zoning By-law 569-2013

This report outlines the analysis, consultation process, and recommended zoning amendments to advance the first phase of work to incorporate low-rise residential lands in Toronto and East York District into Zoning By-law 569-2013 (the "City-wide Zoning By-law). Staff recommend bringing low-rise residential lands into the City-wide Zoning By-law with zoning standards that are consistent with the applicable former municipal zoning by-law, consistent with recent city-wide zoning amendments, and in conformity with the Official Plan. These properties had active zoning by-law amendment or site plan control applications in 2012 and were excluded from the City-wide Zoning By-law through the transition protocol.

 

This study is part of the on-going work to simplify and modernize the City-wide Zoning By-law, and to support consistent application of the City-wide Zoning By-law. Bringing these lands into the City-wide Zoning By-law will remove barriers, ease administration, and enable the creation of more housing as part of the Housing Action Plan. In addition, the recommended zoning by-law amendment will enable properties to take advantage of the removal of parking minimums and permissions for a broad range of "missing middle" housing permissions in support of the Housing Action Plan and its target of 285,000 homes over the next ten years.

 

City staff have completed the first phase of the study's work plan for the Toronto and East York district, by reviewing approximately 327 properties subject to former municipal zoning by-laws and assessing the appropriateness of each property for inclusion in the City-wide Zoning By-law. This report recommends approval of the attached zoning amendments to incorporate approximately 190 low-rise residential properties into the City-wide Zoning By-law.

Date
2024-11-13 10:50 AM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Nov 13, 2024
2024.EX18.3

Ookwemin Minising and Biidaasige Park: Naming the New Island and Park in the Port Lands

This report responds to MM5.3 – Place Names in the Port Lands and EX13.5 - New Island, New Beginnings: Furthering Reconciliation and an Indigenous Cultural Framework for the Port Lands.

 

Over the last year, City staff, in collaboration with MinoKamik Collective and LURA Consulting, facilitated an Indigenous community engagement process to discover, reflect on, and determine Indigenous names for the new island in the Port Lands. The proposed names were lifted up by an Indigenous Advisory Circle (the Circle), comprised of Elders, Knowledge Keepers, language speakers, youth and community members. The process was rooted in Indigenous traditions, teachings and cultural protocols, involving ceremonies, site walks, and deep discussions. The Indigenous Advisory Circle met seven times between April and October 2024. In addition, broader Indigenous communities were engaged at community events, in a survey and in other ways.

 

Circle discussions centered on the area’s history as former marshland, the cultural significance of the land and water, and long-term environmental restoration and stewardship, with a focus on water and native plants. The historical erasure of Indigenous languages and significance of language revitalization initiatives was also emphasized. The collaborative engagement process is detailed in Attachment 3.

 

As acknowledged at the April 9, 2024 Executive Committee meeting, the decision to hand over the power to name this place to Indigenous communities was both a symbolic and concrete step in turning words into actions that contribute to truth, justice, and reconciliation. The process itself is as meaningful as the names chosen. This process demonstrates ways of shifting power and priorities with respect for Indigenous worldviews, ways of knowing, cultural protocols, ceremonies, self-determination and leadership.

 

This report recommends naming the new island in the Port Lands Ookwemin Minising, (pronounced Oh-kway-min Min-nih-sing), meaning “place of the black cherry trees” in Anishinaabemowin/Ojibwemowin. As outlined in Attachment 3, this name honours the natural history of the land, recognizes a vision of environmental restoration, and highlights the future care of Indigenous plant communities. Local Elders recalled the waterfront’s original marshlands near the mouth of the Don River and the trees that grew throughout the waterfront area. The connections between past, present and future resonated with the Circle, with efforts to restore and revitalize both Indigenous names and plants. The name also aligns with other historical Ojibwe place names on Lake Ontario, including Adoobigok (Etobicoke) meaning “place of the alders.”

 

The area the Circle named Ookwemin Minising was previously referred to by several names through many years of planning, design and construction, including the Lower Don Lands, River Precinct, Cousins Quay, and Villiers Island. In November 2024, the “north plug removal”, a key milestone for the Port Lands Flood Protection project, will connect the Don River with the river valley and complete the transition of the landmass into an Island surrounded by water, from planning concept to physical reality. Ookwemin Minising will therefore be the formal name for this newly formed island, coinciding with its emergence as a significant ecological and cultural landmark on the Toronto waterfront.

 

Additionally, this report recommends naming the new park surrounding the Island Biidaasige Park, (pronounced Bee-daw-sih-geh), meaning “sunlight shining toward us” in Anishinaabemowin. As outlined in Attachment 3, this name relates to the hopeful light of a new day, shining on waterway restoration and reconciliation and acknowledges the relationship between the earth, water, sun, and moon as relatives and teachers. The name recognizes water awareness as central to the Port Lands Flood Protection project and creation of the renaturalized Don River, valley and park. The name honours the Indigenous water walker movement, Water Walkers including Josephine Mandamin, and the Indigenous communities who have helped highlight the significance of water as essential to life. The name connects with, and ties together, design elements throughout the island, including the bridges and the flow of the river from east to west, in line with the direction of the sunlight’s daily path.

 

In addition to the two names brought forward in this report, a new name for a portion of Cherry Street that was not realigned, between Commissioners Street and the Keating Channel, was determined by the Circle and will be discussed with landowners and then recommended to the Toronto East York Community Council in December 2024 as part of a staff report on road openings related to the Port Lands Flood Protection project.

 

Other names for the area will be recommended as needed through future related engagement processes. Other than the portion of Cherry Street referenced above, City staff are not recommending that any other existing civic assets be renamed at this time. Villiers Sankey, a former City surveyor, will continue to be commemorated through Villiers Street, an existing street that will be prominent on the new Island.

 

Through EX13.5 - New Island, New Beginnings: Furthering Reconciliation and an Indigenous Cultural Framework for the Port Lands, City staff were also directed to report back on an Indigenous cultural framework for waterfront revitalization in the Port Lands. In 2025, staff will present a report on the many ongoing initiatives related to the Reconciliation Action Plan and Indigenous cultural revitalization on the waterfront.

 

While Indigenous place naming is a significant part of ongoing efforts to advance Indigenous cultural revitalization on the waterfront, it is but a small step in a long journey. There are many ongoing initiatives and future opportunities for advancing Reconciliation Action Plan commitments in a forward-looking framework that involves First Nations, Inuit and Métis communities throughout the process.

 

Ongoing initiatives that the City and partnering agencies, including Waterfront Toronto and CreateTO, are collaborating on with Indigenous communities span from ecology, native plantings, and land/water stewardship to Indigenous art, design, and interpretive signage to language revitalization through place naming. First Nations rights holders, Elders and Knowledge Keepers, Indigenous artists and designers, urban Indigenous youth and community organizations and others are involved. The many communities involved are collaborating to ensure Ookwemin Minising and surrounding precincts are places with meaning and connection to Indigenous histories, cultures, values, and ways of knowing that center connection to the land, water, plants and animals.

 

Future opportunities will take shape alongside the evolution of the future mixed-use communities in Ookwemin Minising and the broader Port Lands. These opportunities can include affordable housing, economic development, land and water stewardship, cultural programming and placekeeping through public realm design. These will be discussed with Indigenous communities and begin to be outlined in a framework, with the vision for this new island, Ookwemin Minising, to be a place where Indigenous histories, worldviews, cultures, and ways of life hold a respected, celebrated, prominent and distinctive place on the waterfront. 

Date
2024-11-13 10:47 AM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
19-0
Status
Carried
Nov 13, 2024
2024.TE17.53

Kingston Road and Columbine Avenue - Traffic Control Signals

  • Residents of the Beach Triangle neighborhood raised concerns about unsafe pedestrian crossings on Kingston Road.
  • Kingston Road is a major route with heavy traffic.
  • A community petition showed strong support for improving safety in the area.

Decisions and Recommendations

  • City Council recommended the installation of traffic control signals at Kingston Road and Columbine Avenue.
  • On November 13 and 14, 2024, City Council authorized this installation to enhance pedestrian safety and accessibility.
AI Generated
Date
2024-11-13 10:38 AM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Nov 1, 2024
2024.SC17.6

Establishing a Permanent Memorial in Scarborough Honouring Grant Faulkner

  • The meeting took place on June 30, 2022.
  • The Scarborough Community Council discussed establishing a permanent memorial for Grant Faulkner.
  • The memorial could be a parkette named in his honor.
  • The proposed location for the memorial is at 320 Markham Road.
  • Consultation involved the Faulkner Family and relevant city departments.

Decisions and Recommendations

  • The General Manager of Parks, Forestry and Recreation recommended naming the park at 320 Markham Road as Grant Faulkner Park.
  • The Scarborough Community Council adopted the recommendation to name the park Grant Faulkner Park.
AI Generated
Date
2024-11-01
Motion
Adopt Item
Vote
Yes
Decision body
Scarborough Community Council
Total
6-0
Status
Carried
Oct 10, 2024
2024.MM22.21

Request for Federal and Provincial Support in Bail Reform

  • The City of Toronto is facing an increase in violent crimes.
  • Many offenders released on bail may not have adequate conditions to prevent further crimes.
  • Ensuring public safety is a priority for City Council.
  • Concerns have been raised about repeat offenders and violent crimes.
  • The bail system is under scrutiny, particularly for those accused of violent offences.
  • Collaboration among federal, provincial, and local governments is essential for justice reform.

Decisions and Recommendations

  • City Council requests the Federal and Provincial governments to ensure effective implementation of bail reforms under Bill C-48.
  • Collaboration is requested to optimize the bail system using data-driven recommendations.
  • Additional funding is sought for the Toronto Police Service to improve bail monitoring and address recidivism root causes.
  • The City Manager will work with local organizations to assess the current bail policies' impact on public safety.
  • Bail decisions should consider public safety risks and enforceable conditions.
  • The item will be forwarded to key government officials for action.
  • A report on supporting positive bail outcomes will be prepared for early 2025.
AI Generated
Date
2024-10-10 20:33 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
17-3
Status
Carried
Date
2024-10-10 20:31 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
19-1
Status
Carried
Date
2024-10-10 20:30 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
19-1
Status
Carried
Date
2024-10-10 14:40 PM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
21-2
Status
Carried
Oct 10, 2024
2024.MM22.8

Trains Not Tunnels - Alternatives to the 401 Tunnel

  • The City Council meeting addressed the Premier of Ontario's proposal to tunnel under Highway 401.
  • Highway 401 is a vital route used by over 500,000 vehicles daily.
  • The proposed tunnel is expected to cost over $50 billion and may disrupt many residents and businesses.
  • The Council believes a high-speed rail system is a better solution for congestion and environmental goals.

Decisions and Recommendations

  • City Council requested the Province of Ontario to explore the feasibility of a high-speed rail system instead of the tunnel.
  • A cost-benefit analysis for the high-speed rail connection between Hamilton, Toronto, Kingston, and Montreal was requested.
  • The City Manager was directed to provide a briefing on the costs and timelines of similar tunneling projects.
  • The Council also requested the Government of Ontario to consider buying back the 407 Express Toll Route as an alternative to the tunnel.
AI Generated
Date
2024-10-10 20:26 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
18-2
Status
Carried
Date
2024-10-10 20:25 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
18-1
Status
Carried
Date
2024-10-10 14:26 PM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
19-5
Status
Carried
Oct 10, 2024
2024.MM22.5

Re-Opening and Amending Item 2024.EY15.16 Bloor Street West - St. Clement Catholic School - Speed Limit Amendment

  • The City Council meeting took place on October 9 and 10, 2024.
  • The meeting focused on reopening discussions regarding the speed limit on Bloor Street West, specifically near St. Clement Catholic School.
  • A previous decision made on July 24 and 25, 2024, included a designated school speed zone and a 40 km/h speed limit.

Decisions and Recommendations

  • City Council agreed to amend the earlier decision by deleting the original speed limit section.
  • The new speed limit will now be set at 40 km/h on Bloor Street West between a point approximately 150 metres west of Mill Road and a point approximately 50 metres east of Markland Drive.
  • This change aims to meet technical requirements for potential automated speed enforcement in the future.
AI Generated
Date
2024-10-10 20:22 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
18-1
Status
Carried
Date
2024-10-10 14:22 PM
Motion
Re-open Item
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Oct 10, 2024
2024.TE16.75

Council Direction on PH14.13 - Allowing Time for a Thorough Review

The direction from City Council at its July 2024 meeting on PH14.13 has generated much interest and attention. City Planning were initially directed to report to the October 24th meeting of Toronto and East York Community Council.  However after the community consultation meeting on September 19th a number of important issues were raised that require additional consideration in the report. 

 

Reporting to the October 24th meeting of TEYCC will simply not allow for an in-depth analysis of all the information that has been raised in the short time since that meeting.  This would also allow for City Staff to meet with residents of Craven Road and Parkmount Road.

Date
2024-10-10 20:20 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
17-3
Status
Carried
Date
2024-10-10 20:19 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
3-16
Status
Lost
Date
2024-10-10 20:18 PM
Motion
End Debate
Vote
No
Decision body
City Council
Total
13-6
Status
Carried
Oct 10, 2024
2024.PH15.5

2023-2024 Annual Progress Update Report - HousingTO 2020-2030 Action Plan and Housing Action Plan (2022-2026)

Toronto is facing housing and homelessness crises - one where rising rents are creating unaffordable conditions for middle-income earners to live and work in the city; while a second crisis is due to a lack of deeply affordable and supportive homes for those with low-incomes, or who are experiencing homelessness, and often physical, mental health and/or addiction challenges. These crises are being driven by factors that range from inadequate housing supply, low wages and social assistance rates that have not kept pace with the rising cost of living, and structural inequities that disproportionately impact Indigenous, Black, and other racialized groups.

 

As noted in the Perspective on the Rental Housing Roundtable report, these intersecting but separate crises require different policy solutions. The City of Toronto and its partners are taking a range of actions across the housing continuum that are guided by the HousingTO 2020-2030 Action Plan ("HousingTO Plan") and the Housing Action Plan (2022-2026). Together, these plans provide a blueprint for comprehensive action that is rooted in the Toronto Housing Charter - Opportunity for All  which recognizes that all orders of government, including municipalities have a role to play in furthering the progressive realization of the right to adequate housing that is affirmed in international law.

 

City Council, through EX9.3 - Generational Transformation of Toronto’s Housing System to Urgently Build More Affordable Homes, directed staff to combine the annual update reports for the HousingTO Plan and Housing Action Plan. This report, along with Attachment 1, provide an overview of the progress made in 2023 in implementing these housing plans through five key areas: 

  • Creating new supply;
  • Protecting, and preserving existing supply;
  • Supporting renters, and improving housing stability;
  • Prioritizing diverse housing needs; and
  • Transforming housing policies.

Building upon the progress made in 2023, the City is advancing transformative initiatives that will further support these objectives including establishing the new Rental Housing Supply Program (RHSP), the Community Housing Sector Modernization and Growth Strategy and developing the City’s first Renovictions By-law. This report also emphasizes the priority actions being taken by the City throughout 2024 to continue making progress towards these objectives.

 

This report also seeks authority to advance a number of critical partnerships that will further enable the City to deliver more affordable housing and support services for residents:

  • Establishing a Memorandum of Understanding with Parc Downsview Park Incorporated to deliver an estimated 2,560 affordable rental homes in Downsview. Parc Downsview Park Incorporated is responsible for the planning and development of lands in Downsview on behalf of its parent company, Canada Lands Company Limited.
  • Receiving a donation of $120,000 from United Way of Greater Toronto towards the supportive housing project at 90 Dunn Avenue.
  • Investing City of Toronto's 2024 allocation under the provincial Building Faster Fund in affordable housing and housing enabling infrastructure projects.

As outlined in this report, the City and its community partners continue to invest the greatest effort and resources towards addressing the housing crises. While municipal and community action are important to meet the objectives the City's HousingTO Plan and Housing Action Plan, action and increased investment by federal and provincial governments are required to make transformative improvements to housing outcomes for Toronto residents.

 

The 2023 Housing Update Report is prepared by the Housing Secretariat with input from various City divisions and agencies including: City Planning, CreateTO, Environment and Energy, Financial Planning, the Indigenous Affairs Office, the Office of Strategic Partnerships, Municipal Licensing and Standards, Seniors Services and Long-Term Care, Toronto Shelter and Support Services, Social Development, Finance and Administration, Strategic Public and Employee Communications, Toronto Building, and Toronto Community Housing Corporation.

Date
2024-10-10 19:38 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
22-0
Status
Carried
Oct 10, 2024
2024.MM22.14

Solve the Crisis: Support of the Ontario Big City Mayors Call for Action to Address the Growing Mental Health, Addictions and Homelessness Crisis

  • A humanitarian crisis regarding homelessness, mental health, and addictions is affecting communities across Ontario.
  • In 2023, Ontario experienced 3,432 drug-related deaths and has an estimated 234,000 individuals experiencing homelessness.
  • Municipalities are working to address these issues but lack sufficient resources and support from the provincial government.

Decisions and Recommendations

  • City Council supported Ontario’s Big City Mayors 'Solve the Crisis' Campaign.
  • Council requested the Ontario Government to:
    • Take immediate action on the humanitarian crisis.
    • Prioritize homelessness as a health issue.
    • Appoint a dedicated Minister and Ministry for housing and health needs.
    • Form a task force with diverse sector representatives to develop effective solutions.
    • Provide sustainable funding for municipalities to support vulnerable populations.
    • Invest in 24/7 community hubs and crisis centers.
  • Residents were encouraged to advocate for provincial support through the campaign website.
  • Information was forwarded to relevant provincial officials and organizations.
AI Generated
Date
2024-10-10 19:27 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
22-0
Status
Carried
Oct 10, 2024
2024.MM22.9

Protecting Community Health by Advocating for Supervised Consumption Services and Consumption and Treatment Services Sites

  • The meeting discussed changes announced by the Ontario government on August 20, 2024.
  • Proposed changes include the closure of five supervised consumption and treatment sites in Toronto by March 31, 2025.
  • The Works site, operated by Toronto Public Health, is among those affected.
  • The government plans to invest $378 million in new treatment hubs but will not allow supervised consumption or needle exchange services at these hubs.
  • Concerns were raised about the negative impacts on public health, safety, and emergency services.

Decisions and Recommendations

  • City Council urged the Ontario government to continue funding all current supervised consumption and treatment services beyond March 31, 2025.
  • City Council requested the co-location of treatment hubs with supervised consumption services to enhance access to medical care and treatment pathways.
  • Recommendations included ensuring that new treatment programs include safety plans and demonstrate effective outcomes.
AI Generated
Date
2024-10-10 19:22 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
18-3
Status
Carried
Date
2024-10-10 19:21 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
18-2
Status
Carried
Oct 10, 2024
2024.PH15.1

Official Plan Policy Amendments for Infrastructure Projects in Parks and Open Space Areas - Decision Report

This report recommends that Council adopt Official Plan Amendment 528 (OPA 528), which amends the City's Official Plan policies to specify limited exemptions when the sale or disposal of City-owned lands in Parks and Open Space Areas, within or outside of the Green Space System, may be permitted without the requirement of an Official Plan Amendment (OPA). The purpose and intent of Official Plan Amendment 528 is to facilitate conservation projects and essential public works and utilities that support Toronto's development and growth, provided certain criteria are met.

 

An associated amendment to Toronto Municipal Code Chapter 213 is also recommended. As recommended, Official Plan Amendment 528 will not revoke Council's current disposal framework contained in the City's Municipal Code, but rather will prescribe narrow circumstances under which a site-specific Official Plan Amendment is not needed.

 

Lands in the Parks and Open Space Areas of the Official Plan, within or outside of the Green Space System, accommodate natural habitat areas, important ecological services and many of the City's recreational opportunities. They are essential to health, prosperity, and quality of life in our City and receive a high level of protection in the Official Plan.

 

In the Official Plan, the City's Green Space System is made up of lands in Parks and Open Space Areas, much of the natural heritage system, and a variety of privately managed but publicly accessible spaces. Parks and Open Space Areas policies, which govern the Parks, Other Open Space Areas, and Natural Areas land-use designations, prohibit development within Parks and Open Space Areas, except for a limited list of uses, including conservation projects and essential public works and utilities. However, the Official Plan does not allow City-owned lands in Parks and Open Space Areas to be sold or disposed of by the City, except where the City-owned land is exchanged for nearby land of equal or greater size and comparable or superior green space utility.

 

This means that although certain land uses are permitted in Parks and Open Space Areas, such as conservation projects and essential public works and utilities, the enabling transaction to allow the sale or disposal of the land is prohibited and requires a site-specific Official Plan Amendment to proceed.

 

In Toronto's Municipal Code, the sale or disposal of land includes granting either a fee simple interest or a leasehold or easement interest for a term longer than 21 years. Chapter 213 of the Municipal Code requires that land be declared surplus prior to its sale or disposal. Official Plan Amendment 528 is intended to work together with the City's current disposal framework in Chapter 213 of the Municipal Code and provide a mechanism to allow transactions for specific types of projects to proceed without the requirement for a site-specific Official Plan Amendment.

 

This report recommends a balanced approach that would allow the sale or disposal to proceed without site-specific Official Plan Amendments in certain circumstances, provided:

 

1. the sale or disposal is to a public agency to undertake conservation projects; or

2. the sale or disposal is an easement to facilitate essential underground public works and utilities, including alternative energy systems; and

  • the project restores and enhances the land (including the natural ecosystem); and
  • the project meets all other applicable policies in the Official Plan.

The recommended amendment is technical in nature and seeks to reduce redundancy in the current process without changing policy direction or intent. Site-specific Official Plan Amendments would still be required for the sale or disposal of City-owned land in Parks and Open Space Areas related to all other project types, including public transit projects. This report does not propose changes to the City's current disposal framework set out in the Municipal Code beyond specifying limited exceptions where a site-specific Official Plan Amendment is not required, and this report will not result in the declaration of any City-owned lands as surplus.

 

This report proposes an amendment to Chapter 213 of the Municipal Code, Real Property, to add a new General Condition in Appendix B (Attachment 3). This new General Condition will make authority to approve a sale or disposal of land in the Parks and Open Space Areas of the Official Plan conditional upon either a site-specific Official Plan Amendment being in force that exempts the lands from the prohibition on sale or disposal, or confirmation from the Chief Planner and Executive Director of City Planning and the General Manager of Parks, Forestry and Recreation that the proposed sale or disposal satisfies Policy 4.3.9 of the Official Plan.

 

For more information about consultation activities, see Attachments 5a and 5b.

Date
2024-10-10 18:26 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
17-1
Status
Carried
Date
2024-10-10 18:24 PM
Motion
Refer Item
Vote
No
Decision body
City Council
Total
2-18
Status
Lost
Oct 10, 2024
2024.IE16.8

Fossil Fuel Advocacy Advertising on City Assets

The Canadian Code of Advertising Standards provides:

 

8. Advertisements must not distort the true meaning of statements made by professionals or scientific authorities. Advertising claims must not imply that they have a scientific basis that they do not truly possess. Any scientific, professional or authoritative claims or statements must be applicable to the Canadian context, unless otherwise clearly stated.

 

Climate change is an unprecedented threat to people in Toronto and worldwide, with overwhelming consequences, especially for the most vulnerable. In Toronto, climate change is already causing serious impacts, including increases in average heat, and in the frequency and severity of extreme weather events. In turn, these adversely affect the Toronto Transit Commission and those we serve.

 

The Government of Canada has made international climate commitments to drastically reduce fossil fuel consumption and to reach carbon neutrality by 2050. The City of Toronto, through TransformTO, and an annual carbon budget, has committed to achieve Net Zero climate pollution by 2040.

 

Fossil fuel companies have a well-documented history of using their immense wealth for advocacy advertising to undermine public support for policies that reduce fossil fuel pollution. Such policies are necessary and urgent to preserve a liveable future for today’s young people. The Pathways Alliance, a coalition of six billionaire fossil fuel companies who produce 95 percent of tar sands bitumen, has actively advertised for this purpose in Toronto, eliciting a number of public complaints. Another fossil fuel lobby group, Canada Action, has also actively advertised across Canada.

 

Recent changes to 74.01 of the Competition Act expressly prohibit misleading environmental benefits claims made to the public, including:

 

- Any statement, warranty or guarantee of a product’s benefits for protecting or restoring the environment or mitigating the environmental, social and ecological causes or effects of climate change that are not based on an adequate and proper testing; and

 

- Any representations with respect to the benefits of a business or business activity for protecting or restoring the environment or mitigating the environmental and ecological causes or effects of climate change that are not based on adequate and proper substantiation in accordance with internationally recognized methodology.

 

The onus is on the advertiser making such claims to prove, if challenged, that the claims are based on adequate and proper testing or substantiation.

 

In July 2024, the Pathways Alliance removed the advocacy messaging from its website and social media feeds, citing uncertainty over whether they comply with these amendments to the Competition Act.

 

A June 2024 study in Energy Research and Social Policy established strong grounds for this “uncertainty”. It examined whether Pathways Alliance advertisements are based on adequate and proper substantiation. Instead, they found: “instances of selective disclosure and omission, misalignment of claim and action, displacement of responsibility, non-credible claims, specious comparisons, nonstandard accounting, and inadequate reporting… Their messaging omits important information, uses misleading framing and comparisons, and fails to meet standards expected of a credible net-zero plan”.

 

Several European court cases have also ruled that fossil fuel advertising is misleading.

In May 2024, Canada’s advertising regulator determined that Canada Action ads claiming liquified natural gas will lower emissions are inaccurate, misleading, and distort scientific data.

 

In June, United Nations Secretary General Antonio Guterres asked all governments to ban advertising from fossil fuel companies, in light of the enormous harm they are causing, including record planetary heat levels. Support for this initiative is growing among physicians and other health professionals in Canada and around the world.

 

Several governments are taking such action. Fossil fuel advocacy advertising limits have been adopted in cities such as Edinburgh, Amsterdam, Yarra and Sheffield. The Montreal bikeshare system has removed fossil fuel advertising. The Société de transport de Montréal is considering doing the same. In March 2024, Council of the City of Ottawa directed its staff to report back in the third quarter on revising its city-wide advertising policy on fossil fuel advocacy advertising.

 

Given the urgency of the climate crisis, the documented greenwashing by fossil fuel companies, and the harmful effect of such greenwashing in discouraging essential climate action, it is contrary to the best interests of the people of Toronto for the City or its agencies and corporations to display fossil fuel advocacy advertising inconsistent with TransformTO on city assets, especially if the claims in such advertising have not been substantiated as required by the Competition Act.

Date
2024-10-10 18:11 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
15-6
Status
Carried
Date
2024-10-10 18:09 PM
Motion
End Debate
Vote
Yes
Decision body
City Council
Total
16-4
Status
Carried
Oct 10, 2024
2024.IE16.5

Approach to Public Electric Vehicle (EV) Charging to 2030

Decarbonizing the transportation sector to meet the ambitious goals outlined in Toronto’s TransformTO Net Zero Strategy (TTO NZS) will require a robust, convenient, and reliable public electric vehicle (EV) charging network that supports other established city-wide sustainable transportation initiatives.

 

The Approach to Public Electric Vehicle Charging presented in this report responds to the TransformTO Net Zero Strategy Short-term Implementation Plan (2022-2025) action: "The City will develop a strategy and plans to meet the 2025 targets in the Electric Vehicle Strategy for public charging infrastructure, and to ensure that sufficient public charging infrastructure will be in place to accommodate growth in Electric Vehicle ownership to 30 per cent of registered personal vehicles by 2030."

 

Toronto has started laying a foundation for its network by establishing zoning rules, parking regulations, and by-laws that help define the appropriate use of public space in relation to Electric Vehicle charging. Additionally, Toronto has installed Electric Vehicle charging stations at on-street parking spaces, in Green P parking lots, and at City facilities. The City also provides financing support to encourage charging in existing residential buildings through its BetterHomesTO program while requiring new residential and commercial buildings to install Electric Vehicle charging through the Toronto Green Standard.

 

In 2021, Environment and Climate began work to understand how to increase Electric Vehicle uptake by directing its focus on identifying where publicly owned and operated Electric Vehicle charging would be needed to complement the existing privately operated and publicly accessible Electric Vehicle charging network and private at-home Electric Vehicle charging spots.

 

As of June 2024, Toronto had 30,505 registered Electric Vehicles, roughly 2.8 per cent of the estimated 1.1 million registered passenger vehicles. With a goal of 5 percent of all registered vehicles being Electric Vehicles by 2025, the City will need to take a more proactive role in encouraging Electric Vehicle ownership.

 

This report presents an approach to growing Toronto's existing public charging network by the City through its Divisions, Agencies and Corporations, drawing from extensive research, data analysis, and stakeholder engagement completed in collaboration with several Divisions, Agencies and Corporations to prepare for Toronto's public charging needs.

 

The Approach proposes a model of cross-corporate coordination to advance Electric Vehicle infrastructure asset planning until the year 2030 and clarifies the City’s role with respect to Electric Vehicle infrastructure provision based on initial technical analysis.

 

The Approach to Public Electric Vehicle Charging to 2030 includes:

 

-  A City governance structure that optimizes City-owned assets (in the form of properties including lands and buildings) through a centralized approach led by the Environment and Climate Division, including financial planning of Electric Vehicle infrastructure assets.


-  A technical projection of future needs from a “demand- and utilization-driven perspective” using currently established public charging network information at a ward level to determine the placement of Electric Vehicle chargers.


-  A specific focus on equity through education and public charging station location prioritization of vehicle-for-hire (VFH) vehicles to ensure adequate and convenient access to public chargers for this industry.

 

While the City alone cannot be solely responsible for the robustness of the public Electric Vehicle charging network, nor can the City financially incentivize residents to purchase Electric Vehicles, it can ensure that Toronto residents have reasonable access to charging with a consistent user experience. Relatedly, clear processes and communication on how residents can 'connect' to the Electric Vehicle charger whether a resident is a homeowner, renter, or condo dweller will also be critical for seamless operability. This includes minimizing barriers to access chargers by providing clear signage and wayfinding, advancing charger availability and reliability, and cost parity.

 

Government-led public Electric Vehicle charging programs around the world demonstrate that success in building robust and effective Electric Vehicle charging networks is achieved when collaboration with diverse stakeholders is at the core of this type of infrastructure development, saving time, money, and avoiding unnecessary duplication and stranded assets. Key international examples showcase partnerships with private businesses who supply charging infrastructure and the technology to support it, commercial businesses who allocate spots for their customers and employees to charge their vehicles either at or near their businesses, local utility companies who are a first contact and can provide reliable advice and orientation to what would work best for residents' needs, and intergovernmental alignment on goals and incentives. The City can also, through its processes, policies, and incentives, encourage private sector investment in growing the Electric Vehicle charging network. A robust public Electric Vehicle charging network must include investments from both the private and public sectors.

 

The City has a wide range of other transportation, city building, land use policies, programs, and infrastructure initiatives. These initiatives are either underway or planned to encourage and support the transition away from the use of fossil fuels and increase the use of more sustainable transportation modes such as public transit, walking and cycling, and zero emission vehicles, where required. This proposed approach supports the multiple options available to residents to travel carbon-free around the city now and into the future.

Date
2024-10-10 18:01 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
21-1
Status
Carried
Date
2024-10-10 17:59 PM
Motion
Amend Item (Additional)
Vote
No
Decision body
City Council
Total
6-16
Status
Lost
Oct 10, 2024
2024.EX17.4

Redesigning the Vacant Home Tax Program and Supporting Housing Supply

In 2021, City Council approved the Vacant Home Tax (VHT) as a policy tool to help address the housing crisis that exists in Toronto. The primary objective of the VHT is to improve housing availability by reducing the number of residential properties that would otherwise be left vacant. The VHT program creates a disincentive for property owners to leave residential properties vacant and encourages them to bring these homes into the active rental or ownership housing market. Where property owners choose to keep a property vacant, revenues collected from the program are invested in initiatives that increase or preserve housing supply, such as the City’s Multi-Unit Residential Acquisition (MURA) Program.

 

While the VHT program is still relatively new in Toronto, evidence from other jurisdictions has shown that it is an effective policy tool to increase housing supply. As seen in Vancouver, their equivalent policy tool to the VHT has directly resulted in an increase in housing stock in the rental market.

 

While the VHT program is an important policy tool to support housing supply in the City, the 2023 declaration process that culminated last April was incredibly challenging for residents who received a Vacant Home Tax charge for a property they continued to reside in, as well as Members of Council, their teams and City staff that fielded countless calls from distressed residents. During a report to Council in April 2024, staff acknowledged the challenging 2023 VHT declaration process and immediately identified actions to address those challenges. Staff committed to undertaking a full review of the program and reporting back with a completely redesigned VHT process effective for the 2024 taxation year.

 

Since then, Revenue Services, in collaboration with Strategic Public & Employee Communications, Technology Services, Customer Experience (311), Legal Services, Office of the Chief Information Security Officer (CISO) and Office of the Chief Financial Officer & Treasurer have completed a full review and redesign of the program, focusing on improvements to the following four key areas, all with a customer centred approach:

 

1.    Process and timelines,

2.    Ease of declaration,

3.    Communications strategy, and

4.    Technology and customer interface.

 

Together, these improvements aim to make the declaration process as simple and accessible as possible based on feedback from discussions and consultations with various target audiences.

 

The recommended changes outlined in this report will ensure that homeowners are able to declare their occupancy status in a format that works best for them, whether online, in-person or over the phone, over an extended period of time with access to a dedicated customer care team should additional support be needed. The revised program will ensure a smoother and more efficient experience for Torontonians who, through annual declarations, are a key part of helping the City address its current housing crisis. These changes will also ensure that no homeowner will receive any billing related to VHT, unless they are specifically determined as vacant in accordance with the VHT program by-law.

Date
2024-10-10 17:22 PM
Motion
Amend Item (Additional)
Vote
No
Decision body
City Council
Total
5-18
Status
Lost
Date
2024-10-10 17:20 PM
Motion
Amend Item
Vote
No
Decision body
City Council
Total
4-19
Status
Lost
Oct 10, 2024
2024.IE16.4

Congestion Management Plan 2023 - 2026 - Fall Update

The Congestion Management Plan 2023 - 2026 was presented at the October 2023 Infrastructure and Environment Committee and then subsequently to Council in November 2023. This report addresses a number of additional items that City Council has requested Transportation Services report back on since the adoption of the original report.  

 

Toronto continues to be the busiest city in all North America in terms of construction due to increased private development activity, major infrastructure renewal and the implementation of higher order transit. While the economic benefits of growth will deliver long term value to the residents and businesses in the city, the impacts of construction are having a direct impact on network capacity and neighborhood mobility. Since the end of the pandemic, construction activity has been exacerbated by changes in travel patterns due to hybrid work and a resurgence of people attending events on the weekends. In short, construction has increased, travel patterns and habits have changed, the city population continues to grow and, as a result, overall congestion is having a significant impact on people's daily lives and travel.  

 

Managing congestion in a city the size and scale of Toronto requires comprehensive and nimble approaches to planning and coordination, including bringing data and analytics to articulate the causes of congestion and implement strategic approaches-both tested and innovative-to manage impacted areas. This report identifies additional strategic measures and coordinating efforts to effectively address traffic flow, streamline construction activities and accommodate the demands of a growing urban population.

 

There are several systemic changes being introduced at the September 27 Infrastructure & Environment Committee meeting to help manage citywide congestion and construction coordination, including this report as well as the Enhancing Capital Infrastructure Program Coordination report. These two reports are further supported by actions that Engineering and Construction Services is taking to enhance capital delivery and contract management for large municipal infrastructure projects. A report on these initiatives will be advanced in the first quarter of 2025.

 

As part of this shared and collaborative effort, this report provides updates on five key impactful actions being led by Transportation Services that will more effectively manage congestion in the near term and set a strong foundation for the future:

 

- Plans for better coordination and control over construction activities on the right-of-way and strategy for cost-recovery of traffic congestion mitigation efforts

 

- Upcoming measures for automated enforcement to mitigate bylaw infractions, such as the blockage of signalized intersections and illegal blockage of bike lanes and illegal use of dedicated transit lanes.

 

- Next steps for the Traffic Agent Program and Continued support from the Toronto Police Traffic Direction Pilot

 

- New evaluation framework and methodology for reviewing and approving permits for Special Events

 

- Increasing fines in support of congestion and safety

 

Attachment 4 outlines the timelines and expected outcomes of each action towards better managing congestion.

 

In addition to the key measures listed above, this report also proposes a plan for a new Artificial Intelligence-based traffic simulation modelling strategy that will assist in assessing the impacts of proposed construction or special event related road closures, recommend traffic mitigation plans and provide the ability to measure the impacts of the road closures. It is anticipated that the predicted impacts could be used in the future to better inform charges for road occupation in the new cost-recovery framework.

 

While the recommendations in this report will not eliminate congestion, they provide a more robust toolkit of coordination practices, technology enhancements and "boots on the ground" solutions to actively manage the ongoing pressures of growth and development that continues to shape our city.

Date
2024-10-10 15:43 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
8-16
Status
Lost
Date
2024-10-10 15:42 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
17-7
Status
Carried
Date
2024-10-10 15:41 PM
Motion
Amend Motion
Vote
Yes
Decision body
City Council
Total
21-3
Status
Carried
Oct 10, 2024
2024.IE16.2

Enhancing Capital Infrastructure Program Coordination

Toronto continues to experience unprecedented growth and development at the same time that the City focuses on building affordable housing and expanding our transit networks across the City. To support this activity, there is a need to deliver the necessary infrastructure upgrades and invest in aging infrastructure. The construction coordination process that is currently in place has been challenged to keep pace with this rapid growth and complexity of infrastructure work.

 

The present five-year capital coordination process does not typically consider longer-term capital projects (5 to 10 years) that are forecasted to support areas of intense growth. Similarly, current capital construction coordination processes have difficulty adjusting to and accommodating emergency requests to conduct last-minute works. It is important that all capital construction projects are properly coordinated, sequenced and bundled, taking into consideration criteria that include safety and traffic congestion in order to minimize impacts to communities. These challenges have created an opportunity to enhance and strengthen the coordination of the City's capital infrastructure program while, at the same time, support the City's efforts to better manage congestion.

 

To advance and support the necessary work to improve coordination and integrate longer-term, near-term and last-minute capital projects across the City, a new Strategic Capital Coordination Office was established in April of this year within the office of the Deputy City Manager, Infrastructure Services. The creation of this new office was supported and informed by the findings of a management consultant's review and a staff led Capital Delivery Improvements Review; both completed in 2023.

 

The overall goal of this new Strategic Capital Coordination Office is to:   

 

- Provide strategic senior-level oversight of the City's capital coordination process to enable more timely resolution of emerging issues such as schedule conflicts and management of community impact

 

- Drive accountability among those involved in the planning, coordination and delivery of construction projects across the city

 

- Strengthen collaboration between internal divisions, City agencies and external partners such as utilities and developers with work that impacts the City's right of way

 

- Expand the capital program process to integrate coordination of longer-term plans (5 to 10 years) to maximize bundling and sequencing opportunities of construction projects

 

- Enhance communication and engagement with Councillors and the public to keep everyone informed on upcoming construction activities, community impacts, mitigating measures, and any changes during construction

 

The staff team within Engineering and Construction Services that are responsible for coordination of the Toronto Water and Transportation Services' annual five-year capital plan, were transitioned into the new Strategic Capital Coordination Office in April 2024. As work continues to expand and strengthen the role of this office, additional staff are required to provide strategic coordination of capital projects across the City. Eight new temporary positions to support the implementation of the Strategic Capital Coordination Office, fully funded by the capital budget, are being requested for 2024. An additional seven positions will be requested through the 2025 Budget Process to complete the Strategic Capital Coordination Office.

 

The report also responds to the City Council direction with report IE7.2 of the November 8, 2023 City Council meeting, directing the Deputy City Manager, Infrastructure Services to report back with an approach on the enhancement and expansion of the existing capital coordination programs.

Date
2024-10-10 15:35 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
23-0
Status
Carried
Oct 10, 2024
2024.MM22.34

Actions on MyToronto Pay Platform (PayIt) Pending Consideration of Auditor General Report

  • The City Council meeting took place on October 15, 2024.
  • The Audit Committee received a report from the Auditor General of Toronto.
  • The report focused on the procurement of the MyToronto Pay platform by PayIt LLC.
  • The audit aimed to review the process and outcomes, identify lessons learned, and suggest improvements.
  • It emphasized the need for openness, fairness, and transparency in city procurement.

Decisions and Recommendations

  • Mayor Olivia Chow, supported by Councillor Gord Perks, recommended that no new City services or payment types be added to the MyToronto Pay platform.
  • This recommendation is to remain in effect until City Council reviews the audit report AU6.2.
  • City Council had previously adopted this direction on October 9 and 10, 2024.
AI Generated
Date
2024-10-10 14:52 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
24-0
Status
Carried
Oct 10, 2024
2024.MM22.31

Representation at a Toronto Local Appeal Body hearing for 228 Guildwood Parkway

  • The City Council met to discuss an application to demolish a building and construct a new dwelling at 228 Guildwood Parkway.
  • The application requested a variance for maximum floor space area.
  • The Committee of Adjustment refused the application on September 18, 2024.
  • The applicant has appealed this decision to the Toronto Local Appeal Body (TLAB).
  • The City Solicitor needs instructions to participate in the appeal process.

Decisions and Recommendations

  • City Council authorized the City Solicitor to attend the TLAB hearing to oppose the application.
  • The City Solicitor is permitted to hire outside consultants if necessary.
  • The City Solicitor is also authorized to negotiate a settlement of the appeal, with decisions made in consultation with the Ward Councillor and Chief Planner.
AI Generated
Date
2024-10-10 14:50 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Oct 10, 2024
2024.MM22.30

Municipal Code Amendment - Exemptions for Dwelling Rooms

  • City Council held a meeting to discuss housing regulations.
  • The focus was on the 2023 Housing Action Plan and Multi-Tenant Houses.
  • Council aimed to create a new framework for these housing types.
  • An exemption for parkland dedication was under consideration but not fully granted.
  • The property at 268 Seaton Street is seeking a building permit for a Multi-Tenant House.

Decisions and Recommendations

  • City Council adopted the 2023 Housing Action Plan.
  • Council directed staff to provide fee exemptions for Multi-Tenant Houses.
  • An amendment for parkland dedication exemption for Dwelling Rooms will be proposed by the end of 2024.
  • Council approved an exemption for 268 Seaton Street from parkland dedication requirements related to its building permit application.
  • This decision aims to expedite the development of affordable housing.
AI Generated
Date
2024-10-10 14:48 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Oct 10, 2024
2024.MM22.26

186 Thirtieth Street - Request for City Solicitor to Attend at the Toronto Local Appeal Body

  • The meeting took place on October 9 and 10, 2024.
  • It addressed an appeal regarding a refusal for variances to construct a warehouse at 186 Thirtieth Street.
  • The Committee of Adjustment had previously denied the application due to concerns about massing and setbacks.
  • The owner appealed the decision to the Toronto Local Appeal Body, prompting urgent action.

Decisions and Recommendations

  • City Council authorized the City Solicitor to attend the Toronto Local Appeal Body to support the refusal of the application.
  • The City Solicitor was also authorized to hire outside consultants if needed.
  • The City Solicitor was given permission to negotiate a resolution for the appeal and to resolve the matter on behalf of the City after consulting with relevant officials.
AI Generated
Date
2024-10-10 14:45 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Oct 10, 2024
2024.MM22.20

Requesting Metrolinx to Provide Transparency and Accountability on the Eglinton Crosstown

  • The City Council meeting addressed the delays of the Eglinton Crosstown Light Rail Transit.
  • The project is significantly over budget and has faced years of delays.
  • Residents and businesses along Eglinton Avenue have experienced hardships due to ongoing construction.
  • There are concerns regarding traffic, safety, and business viability.
  • Metrolinx has not provided clear explanations for the issues, despite calls for transparency.

Decisions and Recommendations

  • City Council requested the Province of Ontario to conduct a public inquiry into the delays and cost overruns of the Eglinton Crosstown project.
  • The Mayor and City Manager will invite the Provincial Minister of Transportation and the CEO of Metrolinx to a future Executive Committee meeting.
  • They will be asked to provide updates on:
    • Reasons for the delays
    • Expected completion date
    • Additional project costs
    • Support for affected residents and businesses
AI Generated
Date
2024-10-10 14:38 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
20-3
Status
Carried
Date
2024-10-10 14:36 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
21-2
Status
Carried
Date
2024-10-10 14:34 PM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
20-3
Status
Carried
Oct 10, 2024
2024.MM22.6

Extending Voting Opportunities in City Polls to 16- and 17-Year-Olds

  • The City Council meeting discussed the possibility of lowering the voting age for neighbourhood polls from 18 to 16.
  • This discussion aligns with a growing trend across Canada, where several municipal councils have already supported extending voting rights to younger citizens.
  • Research indicates that 16- and 17-year-olds are capable of making informed voting decisions, similar to adults.
  • The City of Toronto has opened numerous neighbourhood polls, and changing the age requirement could enhance youth engagement in local governance.

Decisions and Recommendations

  • Councillor Dianne Saxe, supported by Councillor Lily Cheng, recommended that the City Clerk report on steps to lower the voting age for neighbourhood polls to 16.
  • The report should outline necessary changes for implementation by the end of the first quarter of 2025.
  • City Council deferred the item to the meeting scheduled for November 13, 14, and 15, 2024.
AI Generated
Date
2024-10-10 14:24 PM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
17-7
Status
Carried
Oct 10, 2024
2024.MM22.3

Ensuring a Complete Community in Don Mills by Having Places to Play, Visit, Work and Study

  • The City Council meeting addressed the future of the Ontario Science Centre at 770 Don Mills Road.
  • The Province plans to close the Science Centre and relocate it to Ontario Place.
  • A New Deal between the City and the Province includes discussions on maintaining community-oriented science programming.
  • The Flemingdon Park area is experiencing significant population growth, necessitating the development of complete communities with recreational and educational facilities.

Decisions and Recommendations

  • Councillor Jon Burnside, supported by Councillor Parthi Kandavel, recommended that:
    1. City Council support keeping the remaining City-owned lands at the Ontario Science Centre for recreational and educational uses.
  • On October 9 and 10, 2024, City Council adopted this recommendation.
AI Generated
Date
2024-10-10 14:18 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Oct 10, 2024
2024.PH15.3

35 Bellevue Avenue - Zoning By-law Amendment - Decision Report - Approval

This report reviews and recommends approval of a City-initiated Zoning By-law amendment to permit a 4-storey residential apartment building with 78 new affordable rental dwelling units with supports at 35 Bellevue Avenue in the Kensington Market neighbourhood. The proposal is to replace an existing surface parking lot and add a mass timber building designed to have net zero greenhouse gas emissions, and will meet or exceed the Toronto Green Standard Version 4.

 

This project is one of five being delivered under a new Public Developer model, whereby the City retains ownership of its lands and is taking a more direct and intentional approach to the delivery of non-market homes that are affordable to low-and-moderate-income residents. Additionally, this project will support the City in delivering a full range of housing opportunities in line with the HousingTO 2020-2030 Action Plan ("HousingTO Plan") target of approving 65,000 rent-controlled homes, including 18,000 supportive homes, within complete communities.

 

Approval of the recommendations in this report will enable the City to move quickly to start construction on this project by the end of 2024 and ensure residents can move into new homes by the end of 2025. Once completed, the building will offer 78 rent-geared-to-income and supportive homes to be operated by the Kensington Market Community Land Trust (KMCLT) in partnership with St Clare's Multifaith Housing Society (St Clare's), who has been selected as the not-for-profit housing provider for the site.

Date
2024-10-10 12:26 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
17-1
Status
Carried
Oct 10, 2024
2024.EX17.1

Building a Universal Student Food Program in Toronto

In my time as a City Councillor and Toronto’s Child and Youth Advocate, I spoke with youth across the city - asking them what they would do if they were mayor for a day. One entry from Sylvia stood out above all the others. She submitted a drawing of a stick figure child holding up a shopping bag, her note read that she would ask God for money to buy groceries. This image and this need has haunted me ever since.

 

That’s why today I am taking the next step as Mayor to build a Universal Student Food Program in our city. I am committed to making this happen. It exists in cities around the world and Torontonians deserve it too.

 

I am very proud to have helped establish Toronto’s student food program when I was a school trustee and later a councillor. Today it helps to serve over 227,000 meals per day to kids across our city. But still there are over 100,000 kids across more than 220 public schools who do not have access to good food, including thousands in some of our lowest income neighbourhoods.

 

In fact, we have 21 schools that have the infrastructure in place, that are eligible, that have applied in the last two years, and have been denied because of a lack of funding. That means 8,000 kids at these schools don’t have the same opportunities, they’re stuck trying to focus and learn on empty stomachs. My first recommendation below puts us on a path to feeding these students in January 2025.

 

The rising cost of groceries is putting pressure on families in our City. In Toronto, nearly one in three food bank clients are children and youth. The reality is, in our city with so much wealth, we have thousands of kids going to school every single day hungry. When you’re hungry, you can’t learn. We need our kids to be able to focus on their teacher, not their hunger. We know that student meal programs increase attendance, improve math, science and reading scores, reduce dropouts, and create healthier communities.

 

City Council and the Toronto Board of Health have a long history of offering nutritious meals at school through the Student Nutrition Program. This program is funded through municipal and provincial funding streams. The City of Toronto currently invests $19.16 million annually and the Province of Ontario nearly $9 million. School community contributions and fundraising alongside corporate donations also help to fund the program. And in its April 2024 Budget, the Federal Government announced the National School Food Program, where they committed hundreds of millions that we expect to soon flow here in Ontario.

 

With this alignment across orders of government and, frankly, across political parties - we have a big opportunity to make a universal school food program a reality in our city.

 

That’s why I am recommending Executive Committee adopt the recommendations below.

Date
2024-10-10 11:17 AM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Date
2024-10-10 11:16 AM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Date
2024-10-10 11:14 AM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Oct 9, 2024
2024.EX17.3

Electric Ferries Shoreside Infrastructure Work Plan

At its meeting on July 24, 2024, City Council approved the award of a contract to construct and deliver two new fully electric ferry vessels for operations to and from Toronto Island. This report in response to Council's request outlines the work plan to install shoreside infrastructure at Jack Layton Ferry Terminal ("Shoreside Infrastructure Project") to enable operation of new electric ferries, beginning with the vessels scheduled to arrive in Q4 2026 and Q2 2027 and including other electric replacement vessels to be added to the City's ferry fleet. No capital work is required at the Toronto Islands to enable operation of electric ferries. The work plan presents the tasks and associated timelines required to complete the shoreside infrastructure including the design, permits and approvals, procurement and construction phases.

 

The report also presents the roles and responsibilities within City divisions, CreateTO and Toronto Hydro to effectively advance the project and ensure oversight regarding project budget, timelines, quality control and integration with parallel projects and with ferry operations.

 

The shoreside infrastructure is scheduled to be installed by Q3 2026 in advance of the delivery of the first new ferry, the passenger and vehicle vessel, in Q4 (November) 2026 and the new passenger vessel in Q2 (April) 2027. The upgrades to Jack Layton Ferry Terminal will include charging and electrical infrastructure and modifications to the ferry berths to support the new ferries.

Date
2024-10-09 17:57 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
22-2
Status
Carried
Oct 9, 2024
2024.GG16.12

Award of Doc4553928310 to GFL Environmental Inc., for Curbside Collection Services in District 2 for Solid Waste Management Services

The purpose of this report is to advise on the results of the Request for Quotation Doc4553928310 for the collection, transportation and off-loading of Garbage, Bulky Items, Organic Materials and Yard Waste from curbside collected Single Family homes, multi-residential locations, Commercial locations, Charities, Institutions and Religious Organizations and Divisions, Agencies and Corporations. The collection, transportation and off-loading of Recyclable Materials from Non-eligible Customer Types, in the Collection Area bounded by Yonge Street to the east, the Humber River to the west, Steeles Avenue to the north and Lake Ontario to the south (District 2) in the amount of $284,250,333 net of all applicable taxes and charges ($289,253,139 net of Harmonized Sales Tax recoveries). This collection contract service award is for a five (5) year period with the option to extend the agreement on the same terms and conditions for an additional two (2) separate one (1) year periods. This report requests the authority to enter into a legal agreement with GFL Environmental Inc., being the lowest supplier meeting specifications.

Date
2024-10-09 17:27 PM
Motion
Refer Item
Vote
Yes
Decision body
City Council
Total
23-2
Status
Carried
Oct 9, 2024
2024.EX17.5

Billy Bishop Toronto City Airport - Runway End Safety Areas

PortsToronto must meet a federal regulatory requirement to have Runway Safety End Areas (RESA) at Billy Bishop Toronto City Airport (BBTCA) by July 12, 2027. RESAs are level ground past the ends of a runway created to mitigate the impact when an airplane over or under shoots either end of a runway. Airports in Canada are now required to have a minimum of 150 meters of safety length beyond runway ends.

 

The City is hosting a public meeting on this issue on September 24, 2024. A supplementary report will be provided to the Executive Committee after the public meeting. This supplementary report will provide an overview of the federal requirement and the RESA options at BBTCA. It will also provide City staff comments on PortsToronto's RESA options and requests, and the decisions and approvals that may be required as a result of these requests. Further, City staff will summarize public consultation on this matter.

Date
2024-10-09 17:05 PM
Motion
Adopt Item as Amended
Vote
No
Decision body
City Council
Total
17-8
Status
Carried
Date
2024-10-09 17:00 PM
Motion
Amend Item
Vote
No
Decision body
City Council
Total
14-11
Status
Carried
Date
2024-10-09 16:59 PM
Motion
Amend Motion
Vote
No
Decision body
City Council
Total
16-9
Status
Carried
Sep 5, 2024
2024.CC21.4

4195 Dundas Street West and 556, 558, 560, 562 and 564 Prince Edward Drive North - Official Plan Amendment and Zoning By-law Amendment Applications - Ontario Land Tribunal Hearing - Request for Directions

  • The City Council meeting addressed a Zoning By-law Amendment for properties at 4195 and 4221 Dundas Street West, and 556 - 564 Prince Edward Drive North.
  • The amendment application was initially submitted in March 2016 and has faced appeals due to delays in decision-making.
  • A hearing is scheduled for October 28, 2024, regarding these appeals.
  • A new development proposal was submitted in April 2023, involving multiple mixed-use buildings and townhouses.

Decisions and Recommendations

  • City Council directed the City Solicitor to attend the Ontario Land Tribunal to support a settlement offer regarding the development.
  • The Council approved the release of certain confidential recommendations and accepted an on-site parkland dedication as part of the settlement.
  • Additional conditions were established for infrastructure upgrades and community benefit discussions.
  • The City Solicitor was authorized to take necessary actions to implement these decisions.
AI Generated
Date
2024-09-05 10:27 AM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
22-1
Status
Carried
Sep 5, 2024
2024.CC21.3

70-86 Lynn Williams Street - Zoning By-law Amendment Application- Ontario Land Tribunal Hearing - Request for Directions

  • The City Council meeting took place on October 18, 2023.
  • A Zoning By-law Amendment application was submitted for a 43-storey building with 588 rental units at 70-86 Lynn Williams Street.
  • The north half of a heritage building is to be demolished, while the south half will be retained.
  • The City Council initially refused the application, leading to an appeal to the Ontario Land Tribunal.
  • Urgent directions were needed from the City Solicitor regarding the matter.

Decisions and Recommendations

  • City Council adopted recommendations from the City Solicitor regarding the appeal.
  • The confidential instructions to staff were authorized for public release.
  • The Council accepted a settlement offer and supported the development's progress at the Ontario Land Tribunal.
  • Parkland dedication and construction of a non-profit child care facility were approved.
  • Financial incentives for affordable housing were established, along with requirements for community engagement and compliance with local plans.
  • The City Solicitor was authorized to implement these decisions.
AI Generated
Date
2024-09-05 10:24 AM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
21-2
Status
Carried
Date
2024-09-05 10:22 AM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
23-0
Status
Carried
Jul 25, 2024
2024.PH14.13

Expanding Permitted Uses in Laneway and Garden Suites

On September 28, 2023, House of Compassion, a non-profit housing provider, submitted a minor variance application (A0862/23TEY) proposing to build a laneway suite as an expansion of a residential care home use for their property at 169, 171, and 171½ Shaw Street. On November 29, 2023, the Committee of Adjustment approved the application.


On May 10, 2024, my office shared an inquiry from House of Compassion with City Planning, providing some suggestions following their above-noted Committee of Adjustment application. The inquiry requested that staff investigate the possibility of amending the Zoning By-law to provide as-of-right permissions for other residential uses in laneway suites and/or garden suites including multi-tenant houses, group homes/residential care homes, multiplexes and co-living.

Date
2024-07-25 20:12 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
20-1
Status
Carried
Jul 25, 2024
2024.DM20.1

5051-5061 Yonge Street - Official Plan and Zoning Amendment Applications - Ontario Land Tribunal Hearing - Request for Directions

  • The City Council meeting took place on December 14, 2020.
  • It addressed Zoning By-law and Official Plan Amendment applications for a mixed-use building at 5051-5061 Yonge Street.
  • The proposed building is now 39 storeys with residential and non-residential uses.
  • An appeal was made to the Ontario Land Tribunal due to the City Council's failure to decide on the application.
  • A hearing was scheduled for May 2024 but was postponed for further City Council direction.

Decisions and Recommendations

  • City Council adopted confidential instructions from the City Solicitor regarding the application.
  • The public release of certain confidential documents was authorized.
  • The City Solicitor will support a settlement at the Ontario Land Tribunal, with specific conditions.
  • The owner must provide community space and ensure infrastructure improvements at no cost to the City.
  • The City Council will oversee the in-kind contribution agreement related to the community space.
  • Further confidential advice remains protected under solicitor-client privilege.
AI Generated
Date
2024-07-25 20:10 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
17-4
Status
Carried
Jul 25, 2024
2024.PH14.6

Advancing the Construction of Affordable Rental Homes at 777 Victoria Park Avenue

The Housing Now Initiative is a signature affordable housing program in Toronto and across Canada. It is also a key housing supply program to support the City's HousingTO 2020-2030 Action Plan, Housing Action Plan 2022-2026, and City of Toronto’s Generational Transformation of Toronto’s Housing System to Urgently Build More Affordable Homes report. Through the Housing Now Initiative, City-owned lands are leveraged for the purpose of creating new mixed-use, mixed-income communities with maximized affordable housing outcomes. 

 

To-date, the City has identified 22 sites and committed substantial land value, capital funding and financial incentives to the program, making it one of the most significant municipal financial investments in housing underway today. There are also 4 additional pipeline sites that have been identified for pr-development due-diligence. The site at 777 Victoria Park Avenue was among the original sites included in the program.

 

Like many of the Housing Now Sites, 777 Victoria Park Avenue experienced project slow downs resulting from the COVID-19 pandemic, unprecedented escalation in construction costs, changes to federal and provincial housing policy, and steep increases in interest rates. As an example, construction costs have increased by over 63% (more than 20% year-over-year) since 2019, making Toronto the most expensive city in Canada to build high-rise residential.

 

Recently, however, shifts in Toronto’s residential market, stable interest rates, and the introduction of new inter-governmental program and policy changes have resulted in a window of opportunity for the delivery of purpose built and affordable rental homes. 

 

The 777 Victoria Park site will include a range of rental homes, retail and community space at grade and a new purpose-built childcare facility. Importantly the land will remain in public ownership in perpetuity. Subject to Committee of Adjustment approval, the site will deliver 705 rental homes including:

 

  • 256 new affordable rental homes (rents at average of 80% City of Toronto’s average market rent)
  • 449 new rent-controlled market homes (with annual rent increases limited at Provincial guideline+2%).

 

Similar to the Housing Now Initiative - 2023 Progress Update (April 13, 2023), this report makes a number of recommendations to City Council to help 'unstick' the Housing Now project at 777 Victoria Park Avenue to quickly realize a significant amount of new affordable rental homes.

Date
2024-07-25 19:58 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
19-1
Status
Carried
Jul 25, 2024
2024.IE15.9

Building a Permanent Safety Barrier Along the Leaside Bridge to Prevent Suicide Attempts

On June 16, 2024, a man fell from the Leaside Bridge and landed on an oncoming vehicle on the Don Valley Parkway resulting in a tragic accident, a passenger and the person who fell both succumbed to their injuries. The incident is currently under investigation by Toronto Police Service. Two lives were lost during this event that could have been mitigated by a protective barrier or railing along the bridge. Sadly, there are records of several similar suicide cases that have taken place at this bridge.

 

In 2003, the City of Toronto originally erected barriers along the Bloor Viaduct, an unfortunately common site for suicide attempts. This action proved to be highly effective at discouraging and preventing people from jumping off the Bloor Viaduct. A study published in 2017 by Toronto Sunnybrook Hospital stated that between 2004 – 2014, only 1 person died after managing to circumvent the Bloor Viaduct barrier.

 

In 2016, Toronto City Council adopted item MM18.4, which requested “the City Manager, in collaboration with the Medical Officer of Health, the General Manager, Transportation Services, the Toronto Police Services Board and mental health experts, to explore the effectiveness and feasibility of options to prevent suicide deaths from bridges in Toronto and to report back to the Executive Committee in 2017.”

 

In 2018, Toronto Executive Committee received a report from the Medical Officer of Health which stated that “Transportation Services is planning to review the feasibility of implementing barriers and/or other interventions on priority bridge locations.”

 

Further study on the Leaside Bridge and its surrounding infrastructure is necessary as a measure to improve public safety and mitigate further tragedies.

Date
2024-07-25 19:42 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
20-1
Status
Carried
Date
2024-07-25 19:41 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
19-2
Status
Carried
Jul 25, 2024
2024.IE15.2

Toronto Island Park Master Plan

Toronto Island Park (the Island) is a 242 hectare (598 acre) public park formally established in 1956 and recognized as a sacred and significant place known by Indigenous communities as Mnissing ("on the islands") since long before colonial record. Toronto Island Park is comprised of 15 discrete islands and internal waterways, providing a habitat for a diversity of flora and fauna, a natural recreational amenity for millions of annual visitors, and a home to over 600 Island residents.  

 

This staff report summarizes, and seeks Council's endorsement of, the Toronto Island Master Plan, see Attachment 1 and 2, which was developed as a long-needed response to the complex needs and significant challenges facing the Island. These challenges include the increasing effects of climate change, population and tourism growth placing pressure on Toronto Island Park's amenities and natural environment, associated maintenance and state of good repair needs of aging infrastructure, and a desire to enhance access and the overall visitor experience of the Island. The Toronto Island Master Plan is a generational opportunity to establish a vision for what this treasured place can become with strategic investments, and chart a sustainable, celebratory, and equitable future for Toronto Island, its visitors, and its residents.  

 

The Toronto Island Master Plan is the result of a three-year long collaboration and engagement with and between Indigenous rights holders, urban Indigenous communities, Island residents, Toronto’s 2SLGBTQ+ communities, intergovernmental partners, advocacy organizations, vendors, businesses, and city residents and visitors. City staff heard stories and came to appreciate how special and personal this space is for so many and how invested the public is in sustaining its charm, meaning and environments for the future. Improvements to Toronto Island Park should be carefully considered to balance multiple overlapping objectives. These include a "light touch" approach that prioritizes the ecological integrity of the Island, a "play and explore" visitor experience that continues from the mainland to the islands and back, and a focus on equity that "honours and celebrates" the deep Indigenous significance of the Islands, their rich 2SLGBTQ+ history, and the contemporary diversity of the Islands' communities' stories.  

 

This staff report describes how the Toronto Island Master Plan's strategic enhancements, program ideas, and overall vision will advance. The recommendations will provide City staff and partners the authority and direction needed to implement the Toronto Island Master Plan over the next twenty-five years. The improvements proposed for Toronto Island Park include better access, information sharing and getting around, protecting the environment, visitor experience, interpretation, storytelling and programming, capital, and operational opportunities that will collectively transform the overall Island experience. Action is already underway on these improvements including enhancing the visitor experience at the Jack Layton Ferry Terminal, flood and erosion works, restoring Hanlan's Point beach and celebrating its 2SLGBTQ+ significance, procuring two new higher-capacity electric ferries in the near-term, and undertaking a review of the business opportunities for current and potential vendors and concession operators.  

 

Funding has been included in Parks, Forestry and Recreation’s 2024 - 2033 Capital Budget and Plan to ensure progressive implementation of the Toronto Island Master Plan. In the near term (see Attachment 3), there are several critical projects that should be achieved to further enhance the visitor experience and protect the Island’s ecosystem and infrastructure from flood risks. Over the long term, implementation will proceed incrementally as funding and opportunities arise, and as detailed design processes advance. Further engagement with Indigenous partners, Island stakeholders, and the public will be included in all projects as they proceed. Implementation will also require coordination with other projects and initiatives across the Central Waterfront, including the ongoing Marine Use Strategy and the Port Lands revitalization. Finally, opportunities to secure intergovernmental investment via grants and collaborations will be explored to accelerate implementation where feasible.  

 

Staff recommend advising Council on implementation progress with reports every five years over the course of the twenty-five-year horizon of the Toronto Island Master Plan. 

Date
2024-07-25 19:24 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
22-0
Status
Carried
Jul 25, 2024
2024.EC14.12

Canada-wide Early Learning and Child Care Implementation Roundtable: Update

Maintaining and growing our child care system in Toronto is a key priority, as outlined in our Licensed Child Care Growth Strategy. Since the introduction of the Canada-Wide Early Learning and Child Care Agreement, Toronto Children’s Services has been working with operators to implement the program despite the challenges created by the program’s guidelines. 

 

During the implementation of the Canada-Wide Early Learning and Child Care Agreement, the childcare sector has faced a number of challenges. Operators have faced uncertainty on both operating and capital funding, while disparities in workers’ wages have caused recruitment and retention challenges. Sector expansion is stalled due to inadequate investment, and a lack of clarity on the provincial funding formula has made it hard to plan for the future. It is clear that much more work is needed in order for our child care system to be accessible and inclusive for everyone. 

 

The City of Toronto’s Economy and Community Development Committee called for a roundtable of Toronto’s child care sector to be convened to discuss these challenges, identify opportunities, and talk about how we can move forward together to build the best possible future for child care in Toronto. In this report, you’ll see the key themes identified through the roundtable’s discussions and the collective wisdom of those who are on the frontlines. 

 

Affordable and accessible child care helps us build a more fair city and grows our economy. The Canada-wide Early Learning and Child Care agreement also needs to be implemented in a way that is fair, sustainable, and promotes growth. This isn’t feasible without additional support from the provincial and federal governments. 

 

I extend my sincere thanks to all those who joined us for the roundtable, and to everyone else who has reached out in the past few months to speak up for child care in Toronto.

Date
2024-07-25 19:02 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
21-0
Status
Carried
Jul 25, 2024
2024.EX16.20

Delegation of Development Review Related Authorities

Development review shapes how the City grows and delivers services necessary to successfully promote and manage growth. The development review and approval system is critical in developing affordable housing, securing parklands, driving economic growth and job creation, supporting landmark projects, and delivering complete communities that meet approved service standards and regulatory requirements across Toronto.

 

In September 2019, City Council adopted the End-to-End Review of the Development Review Process final report, which outlined several recommendations to improve the City's development review process. This included implementing a new operating model focused on organizational structure, process improvements and technology.

 

Implementation of the new operating model began in March 2020 by establishing an interim team-based structure, comprised of a core team of staff across several City divisions, to streamline the review of all development applications received by the City. To expedite implementation of the new operating model in response to the housing crisis, as well as the Government of Ontario’s legislated application review timelines through Bill 109, the More Homes for Everyone Act, 2022, in June 2023, the City established a new centralized service area, Development and Growth Services, and appointed a new Deputy City Manager for the service area. All development and growth-related services and functions in the City, including the review of development applications, are now reporting to the Deputy City Manager, Development and Growth Services. The City divisions under Development and Growth Services include: City Planning, Toronto Building, the Housing Secretariat and a newly created Development Review Division (Development Review).

 

Development Review's mandate is to expedite the review of all development applications received by the City, with a focus on getting more homes, notably affordable homes, built faster within complete communities. To help achieve this mandate, core staff who review development applications across a number of City divisions and disciplines, some working under previously delegated Council authorities currently in effect, will now be consolidated under Development Review. This is vital to streamline decision-making; improve consistency, transparency and accountability; improve service delivery for applicants and City staff; and ultimately, accelerate the City's development application review process.

 

As a result of this consolidation, the delegation of certain development review related authorities to the Executive Director, Development Review, and the appropriate City staff, is required, accompanied by changes to authorities currently delegated to the Chief Planner position. The purpose of this report is to seek the necessary delegated authority from City Council. This is required to move and consolidate City development review-related authorities within the new division.

 

Council approval of the recommendations in this report will help accelerate the establishment of Development Review and advance many of the City’s strategic priorities aimed at improving the quality of life for Torontonians. This includes promoting a well-run city, creating housing that is affordable and helping Torontonians along the housing continuum, keeping Toronto moving, investing in our people and neighbourhoods, and addressing climate change.

Date
2024-07-25 18:53 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
20-1
Status
Carried
Jul 25, 2024
2024.PH14.14

Medical - Office Facilities/Affordable-Seniors Residential Project in Continuum of Care Setting - Request for Minister's Zoning Order at 4646 Dufferin Street

4646 Dufferin Street is at the heart of the City’s Russian Jewish community in a location well placed to contribute to serving the acknowledged need of this community for a wide range of convenient healthcare facilities and seniors and affordable housing, both rental and ownership; all to be provided within the context of aging in place and continuum of care.
This medical, office and residential proposal supports the City’s housing initiatives to accelerate housing supply and improve affordability and Provincial policies promoting medical facilities closer to local communities to make access more convenient and cost effective.


The proposal aims to utilize the 6.17-acre site as follows:


• Six buildings conceived in the context of a continuum of care;


• 432,000 square feet of non-residential employment, commercial and medical uses (1,200 permanent jobs); and


• A minimum of 770 residential units, inclusive of 350 seniors units (independent serviced, assisted living and memory care) supported by a grouping of medical support personnel; and 225 market rental units (of which 20%-30% are proposed to be affordable rental units for a period of 99 years).


This is a request for a Minister’s Zoning Order (MZO) to permit this mixed-use development. As such, site plan approval would continue to be required to review the proposal against functional servicing, transportation, and other technical compliance requirements. Requiring site plan approval would enable City staff and the proponent to work collaboratively to resolve site specific details to ensure a successful implementation of the MZO.

Date
2024-07-25 18:30 PM
Motion
Amend Item
Vote
No
Decision body
City Council
Total
7-15
Status
Lost
Date
2024-07-25 18:29 PM
Motion
End Debate
Vote
Yes
Decision body
City Council
Total
16-6
Status
Carried
Date
2024-07-11
Motion
Defer Item Indefinitely
Vote
Absent
Decision body
Planning and Housing Committee
Total
1-3
Status
Lost
Jul 25, 2024
2024.MM20.30

Multi-Tenant Housing Framework: Parks Levy Exemption and Framework Application

  • The City Council meeting addressed the 2023 Housing Action Plan.
  • A new regulatory framework for Multi-Tenant Houses was discussed.
  • Council aimed to provide exemptions from certain city fees for these housing types.
  • The parkland dedication requirement was not exempted.
  • Clarity was needed for refugee housing providers under the new framework.

Decisions and Recommendations

  • Council directed the General Manager of Parks, Forestry and Recreation to amend the Municipal Code for parkland dedication exemptions for Dwelling Rooms.
  • Authority was granted to make changes for better clarity in existing exemptions.
  • The Executive Director of Municipal Licensing and Standards will collaborate with other departments to clarify the Multi-Tenant Housing Framework for refugee houses.
  • A public document will be developed to outline these applications promptly.
AI Generated
Date
2024-07-25 17:36 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
22-1
Status
Carried
Jul 25, 2024
2024.MM20.24

Reducing Runoff and Mitigating Flooding

As a result of climate change, Toronto is experiencing more frequent and severe storms, resulting in flooding events that impact our road and transit network, our homes and businesses, and our infrastructure. While the City must invest in meeting our emissions reduction goals, we must also invest in mitigating the impacts of climate change and making our city more resilient.

 

In April 2024, City Council directed staff to better integrate climate resilience across all City of Toronto operations, and to identify a list of climate resilience priorities for investment. While this work is underway, we know that flood mitigation and adaptation will be a critical component to our City’s resilience strategy. 

 

The City currently offers a Basement Flooding Protection Subsidy Program to help people install backwater valves and sump pumps, as well as free front-yard trees and subsidized backyard trees. In the past, the City offered low-cost rain barrels at Community Environment Days as part of the Voluntary Downspout Disconnection Program. This was discontinued over a decade ago. Investments in programs that help reduce paved areas, create more permeable surfaces, and increase groundwater absorption will help avoid floods. This helps people save money on clean up, save people’s homes and basements from costly floods, and reduce pressure on the public infrastructure we all rely on. 

 

While the City consults on broader stormwater mitigation policies that aim to reduce large-scale industrial, commercial and institutional paved surfaces that lead to flooding, it is essential that the City also hear from people across Toronto about how we can support homeowners, multi-residential property owners, and businesses in investing in green infrastructure and flood mitigation. 

 

This motion asks staff to take stock of what stormwater mitigation programs we offer people, evaluate the success of past and present programs, and identify how we can offer more to help homeowners and businesses avoid costly floods.

Date
2024-07-25 17:22 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
25-0
Status
Carried
Date
2024-07-25 17:19 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
22-3
Status
Carried
Jul 25, 2024
2024.GG14.8

Process for Award of Negotiable Request for Proposal Document Number 4053424337 for the Construction of Two New Fully Electric Ferry Vessels

The City of Toronto provides year-round ferry services for residents, passengers and vehicles traveling to and from Toronto Island. Due to the aging ferry fleet, City Council directed Parks, Forestry and Recreation to advance the Ferry Fleet Replacement Strategy, beginning with the construction of two new, fully electric ferry vessels: a new passenger and vehicle vessel and new passenger vessel.

 

The delivery of the two new vessels will increase the City's ferry capacity by over 400 passengers per trip for the passenger and vehicle vessel and nearly 1,000 passengers per trip for the passenger vessel. Delivery of the new vessels will also enhance the passenger experience with contemporary ferry designs and amenities, reduce anticipated repair costs of the current fleet, and significantly reduce greenhouse gas emissions as the ferry fleet transitions from diesel to electric.

 

City Council initiated the Ferry Fleet Replacement Strategy with preliminary funding allocated in 2015. During the course of the design process, in 2022, City Council established the objective of constructing fully electric vessels (rather than hybrid diesel-electric vessels). The recommended design responds to this direction and input received through community engagement.

 

Delivery of the new vessels is targeted to occur in the fall of 2026 and spring of 2027.

 

The purpose of this report is to advise on the status of the Negotiated Request for Proposals for the construction, delivery, commissioning, and warranty of two new fully electric ferry vessels, and the intention of staff to continue negotiations with the preferred proponent. A supplemental report, with full details on the recommended contract award, delivery schedule and financial impact, will be submitted to General Government Committee for its meeting of July 2, 2024.

 

Consideration of this report at July 2024 City Council is essential to preserve the current planned delivery schedule for the new vessels.

Date
2024-07-25 15:19 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
20-2
Status
Carried
Date
2024-07-25 15:18 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
21-1
Status
Carried
Date
2024-07-25 15:17 PM
Motion
Amend Item (Additional)
Vote
No
Decision body
City Council
Total
20-2
Status
Carried
Jul 25, 2024
2024.MM20.33

Authorization to Release Section 37 Funds towards Public Realm and Streetscape Improvements related to "Manor Road Square" as prescribed in Official Plan Amendment 405 as a City-initiated Public Realm Move

  • The City Council meeting took place on July 19, 2022.
  • The Council discussed funding for public realm and streetscape improvements at "Manor Road Square."
  • An initial fund of $711,800 was allocated but costs increased to $1,030,400 due to various factors.
  • The meeting aimed to address the additional funding needed for the project.

Decisions and Recommendations

  • Council approved an increase of $318,600 to the 2024-2033 Capital Budget for Transportation Services.
  • The additional funds will be provided to Rockport Yonge and Manor Inc. for streetscape improvements at Manor Road Square.
  • The funding is fully sourced from Section 37 community benefits from specific developments.
  • The General Manager of Transportation Services is to finalize agreements within 60 days to start construction by October 2024.
AI Generated
Date
2024-07-25 14:39 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
23-0
Status
Carried
Jul 25, 2024
2024.MM20.32

Declaring April 11 to 17, 2025 as Black Maternal Health Week in the City of Toronto

  • The City Council meeting focused on Black maternal health in Toronto.
  • A motion was proposed to declare April 11 to 17, 2025, as Black Maternal Health Week.
  • The week aims to raise awareness, support Black-led initiatives, and encourage community involvement.
  • Black Torontonians face unique health disparities, including higher rates of poor maternal and infant outcomes.
  • Systemic anti-Black racism and social inequalities contribute to these challenges.
  • The motion aligns with the City’s ongoing efforts to address anti-Black racism and improve health outcomes.

Decisions and Recommendations

  • Councillor Michael Thompson, supported by Councillor Amber Morley, recommended the declaration of Black Maternal Health Week.
  • City Council adopted the recommendation to officially declare April 11 to 17, 2025, as Black Maternal Health Week in Toronto.
  • The City commits to collaborating with partners to enhance Black maternal health equity and provide supportive spaces for Black families.
AI Generated
Date
2024-07-25 14:37 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
24-0
Status
Carried
Jul 25, 2024
2024.MM20.20

Jurisdictional Research on Municipal Fiscal Frameworks

  • The City of Toronto contributes over 20% to Canada's GDP and 50% to Ontario's GDP.
  • Despite its economic strength, Toronto faces resource shortages for its development.
  • As Canada’s largest city, it has unique challenges that exceed the support from its property tax-based budget.
  • The city seeks a new fiscal framework, learning from successful global cities.

Decisions and Recommendations

  • City Council, on July 24 and 25, 2024, approved a recommendation from Councillor Lily Cheng, supported by Mayor Olivia Chow.
  • The Chief Financial Officer and Treasurer, in collaboration with the City Manager, will conduct research on funding relationships in comparable cities worldwide.
  • Findings will be reported before the 2025 budget process to aid discussions on municipal fiscal frameworks.
AI Generated
Date
2024-07-25 14:32 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Date
2024-07-25 14:31 PM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
22-2
Status
Carried
Jul 25, 2024
2024.MM20.3

Welcome to Toronto, Taylor Swift!

  • The City Council meeting addressed preparations for Taylor Swift's Eras Tour in Toronto.
  • Six concerts are scheduled for November 2024 at the Rogers Centre.
  • The event is seen as a chance to enhance Toronto's reputation and celebrate the artist's influence.

Decisions and Recommendations

  • Install honorary sign toppers along John Street and Queen Street West as “Taylor Swift Way” for November 2024.
  • Designate the Rogers Centre as “1 Taylor Swift Way” for the same month.
  • Light the Toronto sign red on concert dates: November 14, 15, 16, 21, 22, and 23, 2024.
  • Donate the “Taylor Swift Way” signs to the Daily Bread Food Bank for auction.
  • Accept sponsorship funds from the event organizer to cover sign costs.
  • Request a briefing note on local economic impact and lessons learned after the event.
AI Generated
Date
2024-07-25 14:22 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
21-1
Status
Carried
Jul 25, 2024
2024.PH14.7

Single Exit Stair: Ontario Building Code Feasibility Study

The purpose of this report is to respond to City Council direction that the Chief Building Official and Executive Director, Toronto Building, in consultation with the Fire Chief and General Manager, Fire Services, engage a Building Code Consultant to study the feasibility of supporting a single means of exiting multi-residential buildings of up to four storeys, including additional life safety and other measures which would meet the objectives and intent of the Ontario Building Code.

 

Exits are a fundamental and essential component of a building's fire and life safety system. Some designers and others have advocated that the Ontario Building Code threshold for requiring a second exit stair in small multi-unit residential buildings is too high compared to other jurisdictions in North America, Europe and around the world. They suggest that a single exit staircase would support innovation in the design and construction of higher density small multi-unit buildings on constrained sites in higher density urban areas resulting in more missing middle housing.

 

Building regulators and emergency responders have identified that there are potential impacts on safety that need to be considered in developing Ontario Building Code changes in this area which are complex and significant. Any code changes to allow a single exit in a building need to be based on current research and take into consideration the impacts for both building occupants and first responders. Any potential changes must also provide an equivalent level of protection to that of a building having at least two means of egress, while also ensuring timely access to responding Firefighters and the deployment of the associated firefighting equipment into the building when a fire occurs.

 

This report provides an overview of a technical study undertaken for the City of Toronto by a third-party Building Code Consultant with expertise in fire protection engineering, to consider the feasibility of an alternative solution to the single egress issue.

 

As the Province of Ontario and the Canadian Board for Harmonized Construction Codes continue to consider potential changes to the provincial and national codes, the study will help provide certainty to designers and others preparing submissions to the city where a single exit is being considered and to expedite and facilitate the approval of missing middle projects in the City of Toronto. The report also contains recommendations to provide a copy of the report to the Ministry of Municipal Affairs and Housing and the Canadian Board for Harmonized Construction Codes to support research and code development in this area.

 

This report has been written in consultation with Toronto Fire Services and City Planning.

Date
2024-07-25 14:14 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
20-1
Status
Carried
Jul 25, 2024
2024.RM20.1

Call to Order

  • The City Council meeting was called to order at 9:39 a.m.
  • The meeting began with the national anthem, O Canada.
  • Members observed a moment of silence for the discovery of unmarked graves at a cemetery in Manitoba and in memory of Louis March, Eric Anweiler, and Granville Roy (Mike) Morgan.
  • Speaker Nunziata acknowledged the Indigenous Peoples of the land, emphasizing the importance of improving relationships and understanding their cultures.
  • The meeting recognized the traditional territory of various Indigenous nations and the treaties covering Toronto.

Decisions and Recommendations

  • Speaker Nunziata called the meeting to order and led the moment of silence.
  • The City Clerk provided access to the meeting agenda materials online for those connected to the internet.
  • The Council reaffirmed its commitment to acknowledging Indigenous Peoples and their lands.
AI Generated
Date
2024-07-25 12:26 PM
Motion
Introduce Motion without Notice
Vote
Yes
Decision body
City Council
Total
17-6
Status
Lost
Jul 25, 2024
2024.EX16.3

Subway Agreement in Principle and Update on Metrolinx Subway Program - Third Quarter 2024

The Province of Ontario's Subway Program, being delivered by Metrolinx, is a significant transit expansion project within the City of Toronto. The Subway Program consists of the Ontario Line, Scarborough Subway Extension, Eglinton Crosstown West Extension, and Yonge North Subway Extension projects.

 

In February 2020, the Province and the City negotiated a Preliminary Agreement (PA) for the Subway Program, amongst other matters. The PA outlined high-level roles and responsibilities of the City and Province in the planning, delivery, and operations of the Subway Program. As the Province continues to advance the Subway Program, through its delivery agent Metrolinx, there is a need to develop and execute a Subway Agreement-in-Principle (AIP) that enhances the principles outlined within the PA to further guide the ongoing design and delivery of the Subway Program.

 

Negotiations on the Subway Program AIP are ongoing and will conclude imminently. As such, the purpose of this report is to note that City staff will provide a supplementary report with the details on the outcome of negotiations as soon as possible.

 

The supplementary report to Executive Committee will provide an update on four key items related to the Subway Program, namely:

 

1. Subway Agreement-in-Principle;

 

2. Settlement of the transit ledger in accordance with the terms of the Ontario-Toronto New Deal;

 

3. Scarborough Subway Extension-Eglinton East LRT overbuild protections; and,

 

4. Update on the status of the Subway Program projects.

Date
2024-07-25 11:49 AM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
25-0
Status
Carried
Date
2024-07-25 11:48 AM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
25-0
Status
Carried
Jul 25, 2024
2024.CC20.10

Advancing the Transformation of Toronto's Housing Delivery

  • The City of Toronto is facing a housing affordability crisis affecting many residents.
  • Significant efforts have been made, including financial investments and new policies, but urgent action is still needed.
  • In September 2023, City Council adopted a plan to create 25,000 new rent-controlled homes.
  • In November 2023, a new target was set for 65,000 rent-controlled homes by 2030, with specific goals for affordable and rent-geared-to-income housing.

Decisions and Recommendations

  • City Council received a report from the City Manager and Deputy City Manager on July 17, 2024.
  • The report updates on the progress of housing projects, including five Public Developer sites, with construction expected to begin by late 2024.
  • The report outlines two delivery models for housing projects: partnerships with various developers and the City acting as project manager.
  • City Council adopted the recommendation to receive the report for information on July 24 and 25, 2024.
AI Generated
Date
2024-07-25 11:11 AM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
22-1
Status
Carried
Jul 24, 2024
2024.EX16.7

100 Thorncliffe Park Drive - Development Charges Complaint

This report responds to a complaint filed pursuant to Section 20 of the Development Charges Act, 1997 (the "DC Act"), relating to a development project located at 100 Thorncliffe Park Drive in Don Valley West.

 

The development project is an expansion of the current building, which consists of a two-storey addition totalling 1,502.95 square meters of gross floor area (GFA). The complainant, 2613815 Ontario Inc., objects to the amount of development charges calculated. The complainant asserts that development charges in the amount of $400,147.13 should be refunded as all new GFA as contained within the first level of the expansion is for industrial uses.

 

City staff have reviewed the complaint and are of the opinion that the Development Charges By-law (the "DC By-law") was applied properly, and no error was made in the determination of the applicable development charges. Staff have reviewed the building permit application along with the documentation submitted by the complainant, and believe the expansion was correctly categorized as commercial retail use. The development does not meet the definition of industrial uses; therefore, development charges are not exempt.

 

This report recommends that the complaint be dismissed. A decision or a non-decision of Council to dismiss the complaint may be appealed to the Ontario Land Tribunal (OLT). This report was prepared in consultation with the (Acting) Chief Building Official and Executive Director, Toronto Building, and the City Solicitor.

Date
2024-07-24 19:54 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
21-1
Status
Carried
Jul 24, 2024
2024.EX16.5

Ontario Science Centre Update

Further to City Council's direction in June 2024 (MM19.25), the City Manager will be submitting a report to Executive Committee before its meeting on July 16, 2024 that provides an update on City staff's preliminary work related to the future of the Ontario Science Centre (OSC).

Date
2024-07-24 19:19 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
19-3
Status
Carried
Date
2024-07-24 19:17 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
19-3
Status
Carried
Date
2024-07-24 19:15 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
17-5
Status
Carried
Jul 24, 2024
2024.EX16.21

Governance, Community Benefits Plan, Legacy and Program Advisory Framework, FIFA Fan Festival

  • Toronto is preparing to host matches for the FIFA World Cup 2026.
  • The city was officially announced as a Host City on June 16, 2022.
  • Toronto will host six matches, starting on June 12, 2026, including Canada's first men's match.
  • The event aims to boost Toronto's economy and global profile, aiding recovery from the COVID-19 pandemic.
  • City Council is coordinating efforts with various departments to ensure benefits for the community.

Decisions and Recommendations

  • City Council authorized the City Manager and Executive Director to secure funding from third parties for the FIFA World Cup 2026, with quarterly updates to the Subcommittee.
  • The General Manager of Transportation Services is tasked with accelerating the review and design of two RapidTO transit projects: Dufferin Street and Bathurst Street, with community consultation before presenting findings to the City Council.
AI Generated
Date
2024-07-24 18:46 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
18-2
Status
Carried
Jul 24, 2024
2024.CC20.7

Report on Councillor Frances Nunziata's Use of Constituent Contact Information

  • The meeting addressed a complaint about Councillor Frances Nunziata.
  • The complaint was investigated by the Integrity Commissioner under the Code of Conduct for Members of Council.
  • It was alleged that the Councillor used constituent contact information for election purposes without consent during the 2022 municipal election.
  • The inquiry report assessed potential violations of Articles 5 (Confidential Information) and 7 (Election Campaign Work).

Decisions and Recommendations

  • City Council adopted the findings from the Integrity Commissioner’s report.
  • Councillor Frances Nunziata was found to have violated Articles 5 and 7 of the Code of Conduct.
  • City Council decided to reprimand Councillor Nunziata for her conduct.
AI Generated
Date
2024-07-24 18:42 PM
Motion
Adopt Item
Vote
Absent
Decision body
City Council
Total
14-0
Status
Carried
Jul 24, 2024
2024.CC20.8

Report on Councillor Brad Bradford's Use of Constituent Contact Information

  • The City Council meeting addressed complaints against Councillor Brad Bradford.
  • Complaints were investigated by the Integrity Commissioner under the Code of Conduct.
  • Allegations involved misuse of constituent contact information for election purposes in the 2023 mayoral by-election.
  • The inquiry examined potential violations of Articles 5 (Confidential Information) and 7 (Election Campaign Work).

Decisions and Recommendations

  • City Council accepted the Integrity Commissioner's findings of violations by Councillor Bradford.
  • Council adopted the recommendation to reprimand Councillor Bradford for his actions.
  • The decisions were made during the meetings on July 24 and 25, 2024.
AI Generated
Date
2024-07-24 17:54 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
22-0
Status
Carried
Jul 24, 2024
2024.NY15.3

155 Antibes Drive - Zoning By-law Amendment Application - Decision Report - Approval

  • The City Council meeting addressed an application to rezone 155 Antibes Drive.
  • The proposal includes an infill development featuring three new high-rise buildings alongside an existing 16-storey structure.
  • The development aligns with provincial policies and aims to enhance community amenities and connectivity.

Decisions and Recommendations

  • The Director of Community Planning recommends amending the Zoning By-law for the site.
  • City Council is to authorize the conveyance of land for a Multi-Use Pathway and approve an In-Kind Contribution Agreement.
  • The owner must dedicate on-site parkland and provide improvements to the existing rental units.
  • A construction mitigation plan and a parking plan for tenants are required before site plan approval.
  • North York Community Council forwarded the item to City Council without specific recommendations.
AI Generated
Date
2024-07-24 17:49 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
19-4
Status
Carried
Jul 24, 2024
2024.RM20.7

Review of the Order Paper

  • The City Council held a meeting to review the Order Paper.
  • The meeting included discussions on various agenda items.

Decisions and Recommendations

  • On July 24, 2024, the City Council adopted the Order Paper with amendments.
  • All other items not held on consent were also adopted.
  • On July 25, 2024, the City Council adopted the Order Paper for that date.
AI Generated
Date
2024-07-24 17:13 PM
Motion
Extend the Meeting
Vote
No
Decision body
City Council
Total
18-6
Status
Carried
Date
2024-07-24 11:06 AM
Motion
Adopt Order Paper as Amended
Vote
Yes
Decision body
City Council
Total
22-0
Status
Carried
Jul 24, 2024
2024.EX16.2

Update on the Reallocation of Funding from the Provincial Upload of the F.G. Gardiner Expressway and Don Valley Parkway

On December 13, 2023, City Council approved in principle the terms of the Ontario-Toronto New Deal Agreement (the New Deal), which enables significant infrastructure investment in the City. The New Deal committed the City to funding and delivering growth infrastructure to advance transit and housing priorities, and also created the opportunity to invest in aging infrastructure through the upload of the F.G. Gardiner Expressway (Gardiner) and Don Valley Parkway (DVP) to the Province. Subject to a third-party due diligence assessment, the upload of the Gardiner and DVP allows for approximately $1.9 billion to be re-invested in existing and unfunded City infrastructure priorities over the next 10-year planning period.

 

This report identifies areas in the City that require a significant state of good repair (SOGR) investment, consistent with the funding gaps identified in the City's 2024 Corporate Asset Management Plan (EX14.6), and prior SOGR reporting to Council. The report also highlights funding obligations from the New Deal that require investment, which will be supported from the reallocated expressway funding such as the Broadview Eastern Flood Protection (BEFP) project for advancing Transit-Oriented Communities, and the City's commitment to advancing housing development to support provincial economic development and growth.

 

The report seeks endorsement of the plan to reallocate funding from the Gardiner and DVP to the following priority areas: Toronto Transit Commission (TTC) base system, Housing SOGR and infrastructure development, Parks, Forestry and Recreation (PFR) SOGR, Transportation Services SOGR, Corporate Real Estate Management (CREM) SOGR, and to the Broadview Eastern Flood Protection (BEFP) project. The Executive Director, Financial Planning, and the Chief Financial Officer and Treasurer will work with relevant City Divisions and Agencies, supported by the Capital Prioritization Framework for capital planning to invest in priority infrastructure renewal projects over the entire 10 year planning period through the 2025 Budget process.

Date
2024-07-24 16:42 PM
Motion
Amend Item
Vote
No
Decision body
City Council
Total
2-22
Status
Lost
Date
2024-07-24 16:40 PM
Motion
Amend Item
Vote
No
Decision body
City Council
Total
3-21
Status
Lost
Jul 24, 2024
2024.EX16.1

Acceleration of the State of Good Repair Design-Build Contract for the F.G. Gardiner Expressway Rehabilitation Section 2 - Dufferin Street to Strachan Avenue and Enhanced Congestion Management Measures

Further to City Council's previous consideration in June 2024 (CC19.2)  the Chief Engineer and Executive Director, Engineering and Construction Services, General Manager, Transportation Services, and the Chief Procurement Officer will be submitting a report as soon as more information is available that provides an update on the State of Good Repair Design-Build Contract for the F.G. Gardiner Expressway Rehabilitation Section 2 - Dufferin Street to Strachan Avenue, Contract Number 22ECS-BE-01GE (the "Gardiner Section 2 Contract") including the results of the industry expert workshops held on June 11 and 12, 2024, as well as negotiations with the current contractor, on a plan that includes tangible, implementable measures to advance construction acceleration and enhanced congestion management measures.

Date
2024-07-24 16:11 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
24-0
Status
Carried
Date
2024-07-24 16:10 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
24-0
Status
Carried
Date
2024-07-24 16:09 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
9-15
Status
Lost
Jul 24, 2024
2024.CC20.19

1053 Don Mills Road, 2, 4, 4R, and 6 The Donway East Zoning By-law Amendment - Request for Direction Report

  • A City Council meeting was held to discuss a Zoning By-law Amendment Application for properties at 1053 Don Mills Road and The Donway East.
  • The application proposed four residential buildings with a total of 1,185 dwelling units, including rental replacements.
  • The applicant appealed to the Ontario Land Tribunal due to a lack of timely decision from City Council.
  • An urgent report was prepared as a case-management conference is scheduled for August 13, 2024.

Decisions and Recommendations

  • City Council adopted recommendations from the City Solicitor regarding the appeal.
  • Public release of certain confidential recommendations was authorized.
  • Council accepted a settlement offer and authorized the City Solicitor and staff to support it at the Tribunal.
  • Various conditions were set for the Zoning By-law Amendment and Draft Plan of Subdivision, including requirements for studies and agreements related to infrastructure and parkland.
  • Approval was granted for the demolition of existing rental units with stipulations for replacement and tenant assistance.
AI Generated
Date
2024-07-24 11:04 AM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
21-0
Status
Carried
Jul 24, 2024
2024.IA20.1

39 Dundalk Drive Modular Housing

  • The City Council meeting focused on an Administrative Inquiry submitted by Councillor Michael Thompson.
  • The inquiry addresses concerns regarding the 39 Dundalk Drive Modular Housing, part of the Modular Housing Initiative.
  • The initiative aims to provide supportive housing for individuals with severe needs.
  • Recent incidents at Dundalk raised questions about tenant support and care.
  • The inquiry seeks clarity on tenant selection processes, support programs, and the relationship between Homes First Society and the City.

Decisions and Recommendations

  • City Council received Administrative Inquiry IA20.1 from Councillor Thompson for information.
  • The inquiry includes questions about tenant selection, housing readiness criteria, and oversight of service providers.
  • The City Manager provided an answer (IA20.1a) related to the inquiry.
  • Further evaluation of supportive housing effectiveness will be conducted as part of future work plans.
AI Generated
Date
2024-07-24 10:50 AM
Motion
Refer Item
Vote
Yes
Decision body
City Council
Total
11-13
Status
Lost
Jul 12, 2024
2024.SC15.1

3291 Kingston Road and 2 and 4 Windy Ridge Drive - Rental Housing Demolition Application - Decision Report - Approval

This report recommends approval of the Rental Housing Demolition application to demolish a two-and-a-half storey rental apartment building comprised of eight rental dwelling units at 3291 Kingston Road. The units will be replaced with eight new rental dwelling units as part of the approved redevelopment of the site consisting of a 12-storey residential building with 357 dwelling units in addition to the replacement units.

 

Two of the eight rental units at 3291 Kingston Road were previously demolished without permits and are recommended to be included in the Rental Housing Demolition permit and replaced as part of the application. The proposal also includes the provision of a Tenant Relocation and Assistance Plan for all eligible tenants of the existing rental dwelling units, including the right to return to a replacement rental dwelling unit. The proposal also includes the demolition of two owner-occupied, single-detached houses at 2 and 4 Windy Ridge Drive.

 

The properties are also the subject of an Official Plan Amendment and Zoning By-law Amendment application (20 209863 ESC 20 OZ) which was appealed by the owner to the Ontario Land Tribunal (OLT) in August 2022 due to a lack of decision from  City Council. The Ontario Land Tribunal issued a written decision on November 10, 2023, approving the proposed Official Plan amendment and Zoning By-law Amendment in principle, with the final order being withheld until all outstanding matters, including the necessary agreements with the City, are secured, including considerations related to rental housing matters.

 

This report recommends approval of the Residential Demolition Permit under Chapter 363 of the Toronto Municipal Code, subject to conditions.

Date
2024-07-12
Motion
Adopt Item
Vote
No
Decision body
Scarborough Community Council
Total
5-1
Status
Carried
Jun 27, 2024
2024.TE14.16

135 Roxborough Drive - Alterations to a Designated Heritage Property in the North Rosedale Heritage Conservation District

This report recommends that City Council refuse the alterations to the designated heritage property at 135 Roxborough Drive under Section 42 of the Ontario Heritage Act.

 

This is a C-rated property located in the North Rosedale Heritage Conservation District (HCD). The applicant is requesting approval for the painting of the masonry on the east and west facades of the two-storey house. These alterations do not comply with the policies in the North Rosedale HCD Plan or the Parks Canada Standards and Guidelines for the Conservation of Historic Places in Canada (the official document guiding planning and conservation of heritage properties in the City of Toronto). As such staff are recommending that this application is refused.

Date
2024-06-27 20:32 PM
Motion
Amend Item
Vote
Absent
Decision body
City Council
Total
16-4
Status
Carried
Date
2024-06-27 20:31 PM
Motion
Amend Item
Vote
Absent
Decision body
City Council
Total
7-13
Status
Lost
Jun 27, 2024
2024.IE14.4

Cycling Network Plan - 2024 Cycling Infrastructure and Missing Sidewalk Installation - Third Quarter Update

This report seeks City Council authority to install bikeway projects identified in the Cycling Network Plan Near-Term Implementation Program (2022-2024), as well as one missing sidewalk project and an adjustment to Chapter 886.

 

Cycling Network Plan Projects

 

The Cycling Network Plan and the associated Near Term Implementation Plan, adopted by City Council in December 2021, seeks to build on the existing network of cycling routes to Connect gaps in the current network, Grow the network into new parts of the city, and Renew existing parts of the network to improve safety. Through this report, Transportation Services is seeking authority for bikeway projects that are proposed to be installed in the near term (2022-2024) for which design and consultation have been completed.

 

This report seeks Council authority to install 7.23 centreline kilometres of new bikeways associated with eight projects on the following streets:

 

- Avenue Road: Bloor Street West to Davenport Road (cycle track, Ward 11)

- Beltline Gap Connections

- Roselawn Avenue / Elm Ridge Drive: Allen Greenway to Marlee Avenue (bi-directional cycle track and multi-use trail, Ward 8)

- Marlee Avenue: Castlefield Avenue to Roselawn Avenue (cycle track, Ward 8) and Roselawn Avenue to Eglinton Avenue West (bi-directional cycle track, Ward 8)

- Allen Greenway: Elm Ridge Drive to Wembley Road (multi-use trail, Ward 8)

- Centennial Park Cycling Connections

- Mill Road: Rathburn Road to Burnhamthorpe Road (bi-directional cycle track, Ward 2)

- Burnhamthorpe Road: Mill Road to Etobicoke Creek (multi-use trail, Ward 2)

- Leaside Bridge to Danforth Avenue Cycling Connections

- O'Connor Drive: Hopedale Avenue to Broadview Avenue (cycle track, Ward 14)

- Broadview Avenue: O'Connor Drive to Cosburn Road (cycle track, Ward 14)

- Power Street Project

- Adelaide Street East: Parliament Street to Power Street (cycle track, Ward 13)

- Richmond Street East: Parliament Street to Power Street (cycle track, Ward 13)

- Power Street: Adelaide Street East to Richmond Street East (cycle track, Ward 13)

- Sudbury Street: Queen Street West to Abell Street (contra-flow bike lane, Ward 9)

- Steeprock-Bathurst Manor Cycling Connections

- Steeprock Drive: Chesswood Drive to Dufferin Street (cycle track, Ward 6)

- Whitehorse Road: Steeprock Drive to Rimrock Road (bike lane, Ward 6)

- Rimrock Road: Whitehorse Road to W.R. Allen Road (bike lane, Ward 6)

- West Parkdale Cycling Connections

- Glendale Avenue: The Queensway to Parkdale Road (contra-flow bike lane and bike lane, Ward 4)

- Parkdale Road: Glendale Avenue (south leg) to Sunnyside Avenue (contra-flow bike lane, bike lane, and shared-condition bikeway Ward 4)

- Sunnyside Avenue: Galley Avenue to Pearson Avenue (contra-flow bike lane and bike lane, Ward 4)

- Galley Avenue: Sunnyside Avenue to Macdonell Avenue (contra-flow bike lane, Ward 4)

- Macdonell Avenue: Rideau Avenue to Seaforth Avenue (shared-condition two-way cycling, Ward 4)

- Seaforth Avenue: Macdonell Avenue to Brock Avenue (contra-flow bike lane and shared-condition two-way cycling, Ward 4)

 

This report seeks Council authority to make by-law amendments associated with improvements to 0.75 centreline kilometres of existing bikeways on the following streets:

 

- Harbour Street: Lower Simcoe Street and 130 metres east of Lower Simcoe Street (multi-use trail to cycle track and sidewalk, Ward 10)

- Lake Shore Boulevard West: 15 metres west of Lower Simcoe Street and Lower Simcoe Street (multi-use trail to cycle track and sidewalk, Ward 10) 

- Davenport Road: Wychwood Park and Albany Avenue (traffic and parking, Ward 12)

- Davenport Road: Marchmount Road and Winona Drive (traffic and parking, Ward 12)

 

Further, as part of this report, Transportation Services is seeking Council authority to install a new traffic control signal 50 metres west of the Jonesville Crescent and Eglinton Avenue East intersection to prepare for a new trail connection south of Eglinton Avenue East.

 

Transportation Services is continuing to utilize the streamlined reporting process for by-law amendment submissions associated with cycling infrastructure projects approved by Council for implementation. Once projects are approved by Council, the streamlined process involves delegation of authority to submit bills directly to Council for a discrete period of time after project implementation, which enables Transportation Services to make minor adjustments to constructed conditions without delay and based on local Councillor and public feedback, such as parking adjustments to improve sightlines, adjustments or addition of accessible loading areas, and similar modifications.

 

The changes proposed as part of the projects identified above would improve both safety and mobility options by providing improved cycling connections to transit, parks, local schools, businesses, and residences. Pedestrian improvements have also been included in the projects, wherever feasible, including curb extensions, new sidewalk installations, pedestrian head start signals, and motor vehicle lane adjustments.

 

In addition, this report seeks to make minor housekeeping amendments to existing bikeways and their associated traffic and parking by-laws on the following streets:

 

- Danforth Avenue at Thyra Avenue (traffic and parking, Ward 19)

- Davenport Road: Bedford Road to Dupont Street (traffic and parking, Ward 9 and 11)

- University Avenue: College Street to Dundas Street Avenue (traffic and parking, Ward 10 and 11)

- Silverthorn Avenue: Rogers Road to St. Clair Avenue (traffic and parking, Ward 9)

 

As part of this report, Transportation Services is recommending a one-block extension of missing sidewalk on Westgate Boulevard between Armour Boulevard and the connection to the Earl Bales Park Trail to align with the Basement Flooding Protection Program construction.

 

A map of the Cycling Network and Missing Sidewalk projects proposed in this report is included as Attachment 1.

 

Finally, this report recommends the addition of a new offence provision for CaféTO curb lane patios adjacent to cycle tracks. The new offence provision would make clear that people cycling in a cycle track must yield to people actively entering or exiting a CaféTO curb lane patio.

 

This new offence provision would be similar to that found in Toronto Municipal Code Chapter 886- Sections 14 and 14.1 which address bicycle operation at transit stops and accessible loading areas which prohibits people cycling in a cycle track from, among other things, passing a Toronto Transit Commission bus which is stationary for the purpose of taking on or discharging a passenger and that people cycling must yield to people actively utilizing accessible loading areas, respectively.

Date
2024-06-27 20:27 PM
Motion
Adopt Item as Amended
Vote
Absent
Decision body
City Council
Total
19-2
Status
Carried
Date
2024-06-27 20:26 PM
Motion
Amend Item (Additional)
Vote
Absent
Decision body
City Council
Total
5-17
Status
Lost
Jun 27, 2024
2024.IE14.3

Cycling Network Plan Update (2025 - 2027)

The Cycling Network Plan, most recently updated and endorsed by Toronto City Council in December 2021, seeks to build on the existing network of cycling routes to Connect gaps in the current network, Grow the network into new parts of the city, and Renew existing parts of the network to improve safety.

 

This report provides a status update for the 2022 - 2024 Near-Term Implementation Program and seeks City Council endorsement of the 2025 - 2027 Near-Term Implementation Program as a roadmap for the delivery of new and renewed cycling infrastructure in Toronto for the next three years.

 

The Cycling Network Plan consists of three components:

-  a Vision for the Long-Term Cycling Network;

- a Network of Major City-Wide Cycling Routes; and,

- a Three Year Near-Term Implementation Program.

 

The Plan components, objectives and indicators align with and support other City policies and initiatives including the Official Plan, TransformTO Net Zero Strategy, Vision Zero Road Safety Plan, RapidTO Surface Transit Network Plan, and the Congestion Management Plan.

 

A successful city requires a transportation system that is safe for people of all ages and abilities. Research and experience across North America have shown that when cities do not provide safe and comfortable alternatives to driving, the majority of residents travel by motor vehicle. In growing cities like Toronto, where hundreds of new developments are being constructed every year, if every new resident added another car on the street network, the traffic congestion across all parts of the city would be unmanageable. Travel mode choice is a crucial aspect of creating healthy, livable cities, and requires investing in new transit, bikeway and pedestrian projects.  

 

In 2021, City Council endorsed the 2022 - 2024 Near-Term Implementation Program which committed to 100 kilometres of new bikeways, and 40 kilometres of renewed bikeways which includes upgrades and enhancements to existing cycling routes.

 

Transportation Services is on track to deliver 75 kilometres of the 100 kilometres new bikeways committed by the end of 2024. While this value falls below the 2022 - 2024 target, it is expected to surpass the previous accomplishment of 65 kilometres over 2019 - 2021 without the unique parameters of the ActiveTO Cycling Network Expansion as a pandemic response program. There are also approximately 25 kilometres of additional projects that have been approved by City Council and are either underway and extending into 2025, or where construction has not yet started due to conflict coordination with other major road projects, or challenges experienced during detailed design. 

 

Approximately 25 kilometres of the projects completed in 2022 - 2023 and expected to be complete by 2024 are on the network of Major City-Wide Cycling Routes, such as Bloor Street West, Eglinton Avenue, and Sheppard Avenue East. These additions bring the total existing Major City-Wide Cycling Routes to over 230 kilometres, or 46 percent of the 500 kilometres network.

 

The increase in delivery and the quality of projects have been made possible by previous Council investments in complete streets, including increased funding, additional staff, and a new streamlined by-law reporting process approved as part of the 2021 Cycling Network Plan Update.

 

Transportation Services is expected to exceed its Council directed goal of 40 kilometres of renewed projects by 8 kilometres, with an anticipated delivery of 48 kilometres of upgrades and enhancements. Investing in improving the safety of existing older bikeways contributes to creating an all ages and abilities bikeway network. These upgrades are important improvements, and for many people who cycle, they feel like new infrastructure and unlock access to more destinations by bike and expand the accessibility of the cycling network.

 

The City of Toronto has made historic investments in the cycling network over the last three years. In 2023, $30 million was invested in new and renewed bikeways, representing the single largest financial contribution in one year for bikeways. Transportation Services has increased capacity to deliver transformative complete streets projects with enhanced safety and public realm features. Bikeway projects more regularly include permanent materials such as raised cycle tracks and green infrastructure. Additionally, the scope of cycling projects have grown to focus on all modes by implementing improvements for people driving (such as new turn lanes), for pedestrians and people with disabilities (such as new or wider sidewalks, curb extensions and raised crossings), and for transit (such as transit priority measures), thereby taking a complete streets approach with considerations for all road users.

 

Further, Transportation Services has focused on enhancing intersection design and is in the process of implementing over 20 protected intersections, as well as protected signal phasing and leading bicycle intervals to improve safety at intersections, where most serious and fatal collisions occur.

 

In November and December of 2023, Transportation Services undertook a public consultation process for the 2025 - 2027 Cycling Network Near-Term Implementation Program. Consultation activities included an online survey (over 9,000 completed responses), an interactive map (over 5,000 comments), three online workshops with interest groups and one public virtual meeting (over 300 participants), as well as four public drop-in or pop-up events (one in each Community Council district, attended by approximately 160 people in total).

 

Throughout the public consultation, there was a consistent message from people who cycle: progress is not only measured by the quantity of bikeways installed, but also the quality of design and the feeling of safety and comfort, especially at intersections.

 

“Safety” was the top recommended factor for deciding where to put new bikeways among respondents of all types. For people who cycle, “connectivity” was the next most important factor. From people who do not regularly cycle, their second top factor was “current cycling demand”, and they recommended prioritizing the avoidance of impacts to other modes of travel (vehicle lanes, parking, transit), when determining the location and type of bikeways to be implemented.

 

The routes recommended for the 2025 - 2027 Near-Term Implementation Program are based on public input, City policies and priorities, and technical requirements. The prioritization framework and data sets used to analyze potential routes were updated to reflect lessons learned through the consultation process, including greater emphasis on safety, connectivity, and equity.

 

Technical feasibility reviews were undertaken to assess, at a high-level, impacts and deliverability of candidate routes based on the design emphasis areas of all ages and abilities and complete streets, including an assessment of existing motor vehicle volumes. The coordination of capital works, especially sequencing or bundling with other planned major projects, is an important factor that greatly influences the implementation schedule. In addition to taking advantage of road work opportunities, other delivery emphasis areas of this near-term program include expanding and connecting to Major City-Wide Cycling Routes, as well as advancing recommendations from recent and underway Neighbourhood Streets Plans.   

 

Key projects to be delivered in the 2025 - 2027 Near-Term Implementation Program include:

- Etobicoke Greenway and North Etobicoke Hydro Corridor Trails

- Weston Cycling Connections Phases 2 and 3

- Keele Street from Steeles Avenue West to Finch Avenue West

- Lawrence Heights Cycling Connections and upgrade of Marlee Avenue

- Warden Hydro Corridor Trail

- Sandhurst Circle Cycling Connections

- Several sections of Eglinton Avenue, including the EglintonTOday phases, as well as McCowan Road to Kingston Road

- Dupont Street from Dundas Street West to Lansdowne Avenue (major upgrade) and new from Lansdowne Avenue to Davenport Road

- Parkside Drive from Bloor Street West to Lake Shore Boulevard

 

Transportation Services is proposing that the 2025 - 2027 Near-Term Implementation Program maintains the ambitious target of 100 kilometres of new and major upgrade bikeway projects. Over the past three years, investments have been made in staff resourcing and budget, better preparing the City of Toronto to achieve this commitment.

Date
2024-06-27 20:25 PM
Motion
Adopt Item as Amended
Vote
Absent
Decision body
City Council
Total
20-2
Status
Carried
Date
2024-06-27 20:24 PM
Motion
Amend Item (Additional)
Vote
Absent
Decision body
City Council
Total
19-3
Status
Carried
Date
2024-06-27 20:23 PM
Motion
Amend Item (Additional)
Vote
Absent
Decision body
City Council
Total
9-13
Status
Lost
Jun 27, 2024
2024.MM19.25

An Update on Work to Protect the Science Centre and Support Thorncliffe and Flemingdon Park

  • The Provincial Government plans to move the Ontario Science Centre to a smaller location at Ontario Place.
  • This decision was made without consulting residents of Thorncliffe and Flemingdon Park, who benefit from the Centre.
  • The Science Centre is part of a cultural district that includes the Aga Khan Museum and is vital for local employment and education.
  • Over 21,500 letters have been sent to Premier Ford advocating for the Science Centre's retention at its current site.
  • City Staff were tasked to explore options to keep the Centre at Don Mills and Eglinton, with a report expected in 9 to 12 months.

Decisions and Recommendations

  • City Council requested an update by July 16, 2024, on the future of the Ontario Science Centre, including lease requirements and feasibility studies.
  • City Manager to collaborate with community partners to secure funding for emergency roof repairs.
  • City Manager to support local engagement efforts to maintain community-oriented science programming at the Centre.
AI Generated
Date
2024-06-27 19:36 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
19-1
Status
Carried
Date
2024-06-27 19:35 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
19-1
Status
Carried
Date
2024-06-27 19:35 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
19-1
Status
Carried
Date
2024-06-27 14:57 PM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
21-2
Status
Carried
Jun 27, 2024
2024.PH13.5

Modular Housing Initiative Phase 2: Update Report, and Amendments to Purchase Order Numbers 6052027 and 6052881 issued to NRB Inc. for Design-Build Services for Supportive Housing

The purpose of this report is to provide an update on the Modular Housing Initiative Phase 2, and to request Council authority to enable City Divisions to restart and complete the projects at 175 Cummer Ave., and 39 Dundalk Dr., respectively, by approving Purchase Order Amendments for both projects to ensure funding is in place to complete required work.

 

In April 2020, as an urgent response to the Covid-19 pandemic and its disproportionate impact on people experiencing homelessness, the City launched the Modular Housing Initiative to rapidly create at least 250 new rent-geared-to-income and supportive homes using modular construction. Four of five projects have since been tenanted, providing a safe, affordable place to call home for over 200 residents formerly experiencing homelessness, with wrap-around support services to help them maintain their housing and improve their health and well-being.

 

The project at 175 Cummer Avenue was announced in Spring 2021 as part of Phase Two of the Modular Housing Initiative, along with 540 Cedarvale Ave. and 39 Dundalk Dr. While Cedarvale is complete and Dundalk is nearing completion with only landscaping and a review of costs escalations remaining, the project at 175 Cummer Ave was delayed, first because Council’s request for a Minister’s Zoning Order did not yield a response, and second because of an appeal to the Ontario Land Tribunal (OLT) of Council’s approval of the new zoning by-law for the development in August 2022.

 

A hearing of the appeal was held at the OLT on November 2, 2023. On January 2, 2024 the OLT released its decision, dismissing the appeal and ruling in the City’s favour. The appellants later requested a further review of the OLT’s decision on January 31, 2024, but this request was dismissed by the OLT on February 22, 2024. A motion for leave to appeal the OLT’s decision to Ontario Divisional Court was also denied on May 17, 2024. While the appellants have since made a judicial review application to the Divisional Court to challenge the OLT decision, the OLT decision stands, and zoning is in place to permit the proposed development to proceed.

 

This report requests authority to enable City Divisions to restart and complete the projects at 175 Cummer Ave., and 39 Dundalk Dr., respectively, by approving Purchase Order Amendments for both projects to ensure funding is in place to complete required work.

 

The Confidential Attachments include confidential information regarding the pricing for these projects under negotiation with the City’s supplier, estimated costs to complete the projects, and confidential information related to delivery of the project at 175 Cummer Ave.

Date
2024-06-27 18:45 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
18-1
Status
Carried
Jun 27, 2024
2024.MM19.7

Request to Rename an Existing or Planned Community Garden After the Late Estella Wheeler

  • The meeting addressed the tragic loss of Estella Wheeler, a teacher who was a victim of domestic violence.
  • Mrs. Wheeler was well-respected in her community and had a strong connection with her students.
  • A petition with over 800 signatures was presented to honor her legacy by naming a community garden after her.
  • The proposed location for the garden is in Brockwell Park, near the Africentric Alternative School.

Decisions and Recommendations

  • Councillor James Pasternak, supported by Councillor Chris Moise, recommended that the General Manager of Parks, Forestry and Recreation review the naming request.
  • City Council decided to direct the General Manager to explore options for renaming or naming a community garden in honor of Estella Wheeler.
  • A report with options is to be presented to the North York Community Council by the end of 2024.
AI Generated
Date
2024-06-27 17:54 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
22-1
Status
Carried
Jun 27, 2024
2024.MM19.11

Strengthening and Improving the City-Wide Approach to Youth Violence Interventions

  • The City Council meeting addressed a rise in gun violence in Toronto, particularly affecting Ward 1 and other neighborhoods.
  • The SafeTO Community Safety and Wellbeing Plan aims to tackle these issues through collaboration with institutional partners, community organizations, and residents.
  • A trauma-informed public health approach is being utilized to enhance violence prevention and intervention efforts.

Decisions and Recommendations

  • City Council requested an update in the SafeTO report on community and youth violence prevention and intervention efforts.
  • The Council asked for improvements in outreach methods and exploration of new strategies for better community engagement.
  • The inclusion of community outreach organizations in SafeTO's planning was recommended to share best practices and develop innovative solutions for violence prevention across diverse communities.
AI Generated
Date
2024-06-27 17:53 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
23-0
Status
Carried
Jun 27, 2024
2024.MM19.9

Requesting Alignment of the Independent Electricity System Operator Integrated Regional Resource Plan with the City's 2040 Target of Net Zero Greenhouse Gas Emissions

  • The City Council meeting addressed the goal of achieving net zero greenhouse gas emissions by 2040.
  • The meeting highlighted the need for collaboration among governments and utilities for a low-carbon electricity system.
  • The Independent Electricity System Operator is developing an Integrated Regional Resource Plan for Toronto's electricity system.
  • The Council emphasized the importance of affordable, reliable low-carbon electricity for meeting climate goals.

Decisions and Recommendations

  • City Council requested the Independent Electricity System Operator to align the Integrated Regional Resource Plan with the 2040 net zero target.
  • Key recommendations include:
    • Phasing out gas-fired electricity generation at the Portlands Energy Centre by 2035, with limited exceptions.
    • Increasing local renewable energy generation and storage, and enhancing energy efficiency.
    • Empowering Toronto Hydro to manage distributed energy resources.
    • Supporting a reliable, affordable, low-carbon electricity system to meet future needs.
AI Generated
Date
2024-06-27 17:51 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
20-4
Status
Carried
Date
2024-06-27 14:47 PM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
18-5
Status
Carried
Jun 27, 2024
2024.MM19.8

Supporting the City of Toronto in Joining the Strong Cities Network and Hosting a Future Strong Cities Summit in October 2025

  • The City Council meeting focused on joining the Strong Cities Network.
  • The Strong Cities Network is a global coalition of over 220 cities combating hate, extremism, and polarization.
  • Toronto aims to be more inclusive and safe by joining this network.
  • The city plans to host a summit in October 2025, which may require some financial commitments.

Decisions and Recommendations

  • City Council approved a request for the City Manager to apply for membership in the Strong Cities Network.
  • The General Manager of Economic Development and Culture will report on the feasibility of hosting the summit by the end of 2024.
  • The Council will seek financial support from Federal and Provincial Governments for the summit in October 2025.
AI Generated
Date
2024-06-27 17:44 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
24-0
Status
Carried
Date
2024-06-27 17:43 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
23-0
Status
Carried
Jun 27, 2024
2024.RM19.7

Review of the Order Paper

  • City Council held a meeting to review the Order Paper.
  • The meeting included discussions on various items.

Decisions and Recommendations

  • City Council adopted the June 26, 2024, Order Paper with amendments.
  • All other items not held on consent were also adopted.
  • City Council adopted the June 27, 2024, Order Paper with amendments.
AI Generated
Date
2024-06-27 17:35 PM
Motion
Amend the Order Paper
Vote
Yes
Decision body
City Council
Total
18-3
Status
Carried
Jun 27, 2024
2024.EC13.8

The City's Encampment Approach and Strategy

Toronto is experiencing a housing and homelessness crisis. Communities across Canada continue to see increases in unsheltered homelessness and encampments since the beginning of the COVID-19 pandemic. Encampments are a symptom of the housing crisis, shelter demand that exceeds availability, increasing costs of living, inadequate income supports, and other social crises such as the drug toxicity and mental health crisis.

 

The City believes that permanent, adequate, affordable, and supportive housing is the solution to homelessness and is committed to advancing the progressive realization of the right to adequate housing as set out in the Toronto Housing Charter. Encampments do not meet the human right to housing and are not a long-term solution to homelessness. While the City continues to work towards permanent housing solutions, it is critical that we continue to support people living in encampments, who are among the most vulnerable in our city.

 

The purpose of this report is to present the City’s strategic approach to encampments that is grounded in a human rights approach while supporting the safety and well-being of people living in encampments and surrounding communities. Key components of this approach include:

 

a. Expanding the enhanced housing-focused outreach and support mode

b. Exploring new service models for people in encampments

c. Enhancing safety in the shelter system for staff and clients

d. Increasing permanent housing opportunities and shelter system flow

 

This report also provides an update on the City’s implementation of recommendations in the Ombudsman Toronto’s interim and final reports on encampments and seeks City Council approval of the attached City of Toronto Interdivisional Protocol for Encampments in Toronto, updated based on extensive engagement with people with lived experience of homelessness in encampments, and City and community stakeholders and partners.

 

From a human rights-based approach, and consistent with what we heard from extensive stakeholder engagement, addressing the urgent issue of encampments requires a multi-divisional and sectoral approach and the commitment of all levels of government, community, and other stakeholders to invest in comprehensive public, social and health-related supports.

Date
2024-06-27 17:31 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
21-2
Status
Carried
Date
2024-06-27 17:30 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
21-2
Status
Carried
Jun 27, 2024
2024.EX15.4

A Governance and Operational Review of Sankofa Square (formerly Yonge-Dundas Square)

This report responds to City Council's request to conduct a governance and operational review of Sankofa Square[1], including but not limited to considerations such as publicly operating Sankofa Square in the same manner as Nathan Phillips Square (NPS).

 

The review included a jurisdictional scan and engagement with Board members. Key findings of the review include:

 

-Sankofa Square has a broader mandate than the City's civic squares which includes economic development and community and commercial objectives.

-Sankofa Square's governance and operations model is similar to other North American squares that have broad mandates.

-Sankofa Square is mandated to be financially self-sufficient while the civic squares are not and therefore Sankofa Square can generate revenues from advertisements, sponsorships and commercial events.

 

Based on the key findings of the review, it is recommended that Sankofa Square continue its current board of management governance structure. Departing from this structure and operating Sankofa Square in the same manner as NPS could constrain programming, limit its ability to conduct fundraising, generate revenues, and potentially increase the City of Toronto’s net expenditures.

 

A multi-year strategic plan and business plan is recommended to refresh the Square's objectives. This strategic planning process will help to align the Square's objectives with the post pandemic events market and evolving neighbourhood context and to address the opportunities and challenges identified in this report.

 

This report also transmits, as directed by City Council, the Sankofa Square Board of Management (Board) report on Yonge-Dundas Square's adoption of the new name of Sankofa Square, as previously adopted by City Council, and includes the Board's implementation and transition plan for the new name (Attachment 1).

Date
2024-06-27 16:36 PM
Motion
Adopt Item
Vote
No
Decision body
City Council
Total
17-6
Status
Carried
Date
2024-06-27 16:34 PM
Motion
Amend Item (Additional)
Vote
No
Decision body
City Council
Total
5-18
Status
Lost
Date
2024-06-27 16:31 PM
Motion
Receive Item
Vote
No
Decision body
City Council
Total
5-18
Status
Lost
Jun 27, 2024
2024.MM19.34

222 Rosedale Heights Drive - Request for City Solicitor to Attend at the Toronto Local Appeal Body

  • The City Council meeting addressed a motion regarding 222 Rosedale Heights Drive.
  • The Committee of Adjustment had approved a minor variance application for a two-storey dwelling alteration.
  • Concerns were raised about the impact on a mature tree on a neighboring property due to the proposed development.
  • The City Solicitor had already appealed the decision to preserve the City’s right to appeal.

Decisions and Recommendations

  • City Council directed the City Solicitor to appeal the Committee of Adjustment’s decision for 222 Rosedale Heights Drive.
  • The City Solicitor was authorized to attend the Toronto Local Appeal Body to oppose the development.
  • The City Solicitor can retain outside consultants as needed.
  • The City Solicitor was also authorized to negotiate a settlement and resolve the matter with discretion, after consulting relevant officials.
AI Generated
Date
2024-06-27 15:09 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Jun 27, 2024
2024.MM19.32

Toronto International Pizza Festival

  • The City Council meeting focused on promoting Toronto's food scene.
  • There is a strong community interest in local dining options.
  • The proposal aims to support small businesses and celebrate local cuisine.
  • The urgency of the proposal is to allow time for planning before the September meeting.

Decisions and Recommendations

  • Councillor Mike Colle, supported by Councillor Frances Nunziata, proposed the creation of a Toronto International Pizza Festival.
  • The festival aims to celebrate local pizzerias and culinary diversity in Toronto.
  • City Council requested a report from the General Manager of Economic Development and Culture by the July 2024 meeting.
  • The motion was referred to the Economic and Community Development Committee for further consideration.
AI Generated
Date
2024-06-27 15:07 PM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
10-13
Status
Lost
Date
2024-06-27 15:04 PM
Motion
Waive Notice
Vote
Yes
Decision body
City Council
Total
17-6
Status
Carried
Jun 27, 2024
2024.MM19.26

Towards a Beautiful City

  • The City Council meeting focused on improving Toronto's public spaces.
  • Concerns were raised about the current state of urban design, including broken bike lanes and overflowing garbage cans.
  • The aim is to enhance the beauty and functionality of the city to match global standards.
  • The discussion included the possibility of appointing a City Architect and Designer to oversee these improvements.

Decisions and Recommendations

  • City Council adopted a motion to request a report from the City Manager by the fourth quarter of 2024.
  • The report will focus on:
    1. Creating unified design standards for public realm and urban design on city property.
    2. Establishing design standards for new private developments, including streetscaping and public spaces.
    3. Investigating the creation of an Office of a City Designer and Architect for coordination and implementation of design standards.
AI Generated
Date
2024-06-27 15:00 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
20-2
Status
Carried
Date
2024-06-27 14:59 PM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
19-3
Status
Carried
Jun 27, 2024
2024.MM19.21

Fostering Belonging, Community and Inclusion, and Combating Hate in Toronto

  • The City Council meeting focused on promoting safety, inclusion, and community in Toronto.
  • A report highlighted issues of social isolation and the need for connection among residents.
  • The aim is to ensure all Torontonians can celebrate their identities without fear of discrimination or hate.

Decisions and Recommendations

  • Council directed a re-launch of the "Toronto for All" public education campaign to promote unity against hate.
  • A joint task force will review urban design guidelines to enhance safety in planning.
  • The Graffiti Management Plan will be reviewed to improve responses to hate graffiti.
  • A report will be requested on the feasibility of restoring funding for community gathering spaces to foster belonging and engagement.
AI Generated
Date
2024-06-27 14:55 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
24-0
Status
Carried
Jun 27, 2024
2024.MM19.19

Request to Implement Measures for Mandatory Lead Disclosure and Mitigation in Multi-Residential Housing

  • The City Council meeting addressed the serious health risks of lead poisoning in Toronto.
  • Lead exposure affects children, pregnant individuals, and can cause severe health issues.
  • Approximately 20,000 City-owned households have lead water service pipes.
  • Current regulations do not require landlords to replace lead pipes or inform tenants about their presence.

Decisions and Recommendations

  • Councillor Dianne Saxe proposed a motion to protect tenants, especially vulnerable groups.
  • City Council directed the Executive Director of Municipal Licensing and Standards to report by December 5, 2024, on:
    1. Requiring landlords of older residential properties to test for lead pipes.
    2. Mandating disclosure of lead pipes to tenants.
    3. Ensuring replacement of lead pipes or provision of certified filters to tenants.
  • The motion was referred to the Planning and Housing Committee for further consideration.
AI Generated
Date
2024-06-27 14:53 PM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
5-18
Status
Lost
Jun 27, 2024
2024.MM19.6

Honouring the Late Councillor Jaye Robinson by Naming a Landmark or Site in Don Valley West

  • The City of Toronto held a meeting on May 16, 2024.
  • The meeting was marked by the passing of Councillor Jaye Robinson, who served for over 14 years.
  • She represented the Don Valley West area and fought cancer since 2019.
  • Robinson held various important roles, including Chair of the Toronto Transit Commission.
  • She was a strong advocate for environmental and safety initiatives in the city.
  • A tribute to her legacy was discussed, reflecting her contributions to Toronto.

Decisions and Recommendations

  • Councillor James Pasternak, seconded by Councillor Mike Colle, recommended naming a location in honor of Jaye Robinson.
  • City Council directed relevant General Managers to explore options for naming or renaming a park, street, or landmark.
  • A report with options is to be presented to the North York Community Council by the end of 2024.
AI Generated
Date
2024-06-27 14:44 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
21-1
Status
Carried
Date
2024-06-27 14:43 PM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
21-2
Status
Carried
Jun 27, 2024
2024.MM19.2

14 Lacewood Crescent - Request for City Solicitor to Attend at the Toronto Local Appeal Body

  • The meeting took place on April 25, 2024.
  • The Committee of Adjustment denied a request to demolish a house at 14 Lacewood Crescent and build a new three-storey dwelling.
  • The owner appealed this decision on May 13, 2024, due to concerns about height and massing.
  • A hearing by the Toronto Local Appeal Body is scheduled for August 26, 2024.
  • The urgency of the matter is highlighted by a deadline for participation on June 24, 2024.

Decisions and Recommendations

  • City Council approved the City Solicitor to attend the Toronto Local Appeal Body to support the Committee's refusal.
  • The City Solicitor is authorized to hire outside consultants if needed.
  • The City Solicitor is tasked with negotiating a resolution related to the appeal, in consultation with the Ward Councillor and the Director of Community Planning, North York District.
AI Generated
Date
2024-06-27 14:40 PM
Motion
Adopt Item
Vote
Absent
Decision body
City Council
Total
21-1
Status
Carried
Jun 27, 2024
2024.IE14.15

De Havilland 'Mossie' Park Underground Storage Tank

This motion seeks a further update and information on the status, roadmap, outcome, and project start based on the Class Environmental Assessment Study for Basement Flooding Study Area 16 which was completed in 2012. It recommended project 16-03 to help mitigate flooding risks in the area that includes the subject property (107 Whitley Avenue). After the completion of the preliminary design in 2015, project 16-03 was found to be within the council-adopted cost per benefitting property threshold required for a project to proceed to detailed design and construction.

 

The local Councillor has been advised that the project does not have a planned construction start year and that construction timing is influenced by factors such as design and construction timelines, infrastructure coordination opportunities, available budget envelopes, and the number of Basement Flooding Protection Program (BFPP) projects in the infrastructure planning and design process. Toronto Water has installed a water level sensor in a sewer on Whitley Avenue but at least one owner has argued that this will not solve the type of flooding that has occurred in the area. As the Environmental Assessment was completed 12 years ago, there is a feeling in the neighbourhood that this work is long overdue and homeowners have incurred flooding, property damage and ongoing worry about the consequences of the next extreme weather event. 

 

On July 17, 2013, City Council directed the General Manager, Toronto Water to incorporate Project 16-03 in Toronto Water's forthcoming 2014 - 2018 update to the Basement Flooding Protection Program. In the same motion, City Council directed General Manager Toronto Water that if the cost per household threshold is exceeded, the underground storm storage tank planned for Anthony Park be separated out from "Project 16-03" and be considered for inclusion in the capital works 2014 budget for Toronto Water.

 

In July 2019, Council directed Toronto Water to upgrade the STM Underground Storage Tank at De Havilland (Mossie) Park to address issues with basement flooding in the Winston Park Neighbourhood, (as per item EX7.26).

Date
2024-06-27 12:23 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
22-0
Status
Carried
Jun 27, 2024
2024.PH13.2

Villiers Island Precinct - City-Initiated Official Plan and Zoning By-law Amendment - Decision Report - Approval

The City of Toronto, together with CreateTO and Waterfront Toronto, is advancing a significant revitalization project for the Port Lands. The Port Lands is being transformed into a dynamic, inclusive mixed-use community, with housing at all levels of affordability combined with supportive community infrastructure. It will also continue as an employment hub, bolstering the City’s film, television, and creative sectors, alongside sustained port and industrial activities.

 

The new Island, currently using the working name "Villiers Island" and receiving a  permanent Indigenous name in the Fall of 2024, will be the first mixed-use residential community emerging through this transformation; defined by the renaturalized Don River it will develop into a sustainable and complete community. The Island is part of Toronto's broader waterfront revitalization, building on two decades of a successful tri-government collaboration. This model has spurred long-term economic growth and prosperity by flood protecting and remediating contaminated land, and developing both market and affordable housing. Waterfront revitalization has also delivered award-winning parks, public spaces, and architectural advancements, all while setting higher standards in sustainable development. This approach attracts innovation-focused companies and enhances the waterfront's appeal as a destination for both Toronto residents and visitors.

 

Over a decade of planning and consultation has focused on the future development of the Island. In 2007, Waterfront Toronto held an urban design competition for the Lower Don Lands, which include the Island, resulting in Michael Van Valkenburgh Associates' (MMVA) winning design. In 2011, a refined plan proposed a slight realignment of the Don River and the river mouth. The 2010 Lower Don Lands Framework Plan envisioned four mixed-used residential communities that would be adjacent to the new Don River valley and mouth, connected by bridges.

 

As envisioned in the Lower Don Lands Framework Plan and the 2017 Villiers Island Precinct Plan (the "Precinct Plan"), the Island will be a central connection point for surrounding emerging waterfront precincts, and will have destination parks, a new naturalized Don River Valley, community facilities including a new neighbourhood library, and unique opportunities to experience the Keating Channel.

 

Eighty percent of the developable area on the Island is in public ownership (see Figure 2). The City, CreateTO and Waterfront Toronto have collaborated extensively to review the Precinct Plan and the density on public lands through a Density Study. The partnership sought to identify appropriate built form changes that could help contribute to the City’s ambitious housing and affordable housing goals. This comprehensive Density Study process was informed by a series of iterative design workshops, expert advice from professional planning and design consultants, due diligence studies, feedback from the Waterfront Design Review Panel, and the public feedback through consultations and focus groups.

 

This report recommends the approval of amendments to the Official Plan, Zoning By-law, and Precinct Plan that describe how the Island will develop, based upon the outcome of the Density Study. It also recommends an update to the Municipal Code regarding parkland dedication, and endorsement of the Villiers Island and Keating Channel West Public Art Master Plan. Taken together, these revisions update the planning framework for the Island in response to Toronto's Housing Action Plan, to permit a dense, inclusive, sustainable, and walkable urban community.

 

The proposed amendments contemplate towers with heights between 19 and 46 storeys, enabling an estimated 9,000 residential units and resulting in a net density of 7.7 times the area of the Island's development blocks (see Figure 1). Of the estimated 9,000 units, approximately 2,200 - 2,700 will be affordable housing, with a target of 30 percent affordable housing on public lands. These affordable units will be secured as long-term or permanently affordable housing aligned with the City's income-based definition of affordable housing. Achieving affordable housing will require an intergovernmental funding and financing strategy.

 

The amendments also permit a minimum of approximately 80,000 square metres of retail and office space, 7,850 square metres of community space, and a Toronto Public Library neighbourhood branch.

 

A Business and Implementation Plan for the first phase of development on the Island will be presented to City Council later this Fall or in early 2025. The Business and Implementation Plan will build on this report by outlining the proposed costs and funding strategies, implementation roles and responsibilities, and implementation milestones (including phased development and early activation) for this emerging Island community, ensuring the planned density and necessary infrastructure are coordinated for maximum benefit.

 

The redevelopment of the Island presents unique infrastructure challenges. Although close to the city, it requires replacing the existing infrastructure systems with contemporary ones, including stormwater management, water and wastewater systems. The public realm, established through the Don Mouth Naturalization and Port Lands Flood Protection Environmental Assessment, the Lower Don Lands Infrastructure Master Plan Environmental Assessment and the Precinct Plan, including the planned grid of streets, blocks, and open spaces, will support increased density through generous sidewalks, cycle tracks, green infrastructure elements and future transit connections.

 

Upon completion, the Island will house more than 15,000 residents, part of the larger Port Lands area, which is projected to be home to nearly 40,000 people and 20,000 jobs. The Island will also be a waterfront destination – its infrastructure and amenities will serve a local population, downtown, and the region. The revitalization of the Island and Toronto's waterfront will not only contribute to achieving provincial and federal housing targets, but also support the housing commitments in the City's housing plans.

 

Revitalizing the Port Lands is one of the largest and most complex city-building projects

in the City. The recommendations in this report will allow the City, CreateTO, and Waterfront Toronto to advance implementation plans to enable more affordable housing to be built faster. Building on the success of the Port Lands Flood Protection Project and a generation of planning for Port Lands revitalization; the report's actions will take the next crucial steps to transform a vast industrial and underutilized waterfront area into a vibrant, mixed-use community, important destination, home to tens of thousands of future resident amid a growing cluster of production, interactive and creative uses, and the hustle and bustle of a working port. 

Date
2024-06-27 12:16 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
21-3
Status
Carried
Date
2024-06-27 12:14 PM
Motion
Refer Item
Vote
No
Decision body
City Council
Total
6-18
Status
Lost
Date
2024-06-13
Motion
Adopt Item
Vote
Yes
Decision body
Planning and Housing Committee
Total
7-0
Status
Carried
Jun 27, 2024
2024.IE14.9

Impact of Bill 165 and Gas Utility Use of Public Property in Toronto

Natural gas is a fossil fuel responsible for over half of Toronto’s annual greenhouse gas emissions as the primary energy source for heating buildings.

 

The TransformTO Net Zero Strategy aims to accelerate a rapid and significant reduction in natural gas use in buildings, identifying this as one of four "critical steps" to achieving City Council's goal of net zero emissions by 2040. This critical step is consistent with a worldwide energy transition away from fossil fuels because they are the main cause of climate change.

 

Enbridge Gas Inc. is the utility serving Toronto's consumption of natural gas through a network of transmission and distribution pipelines that connect to over 550,000 gas customers in Toronto.

 

While the City has clearly identified the need to reduce reliance on natural gas, its actions are limited by the jurisdiction provided in provincial legislation. Whether City Council could enact a by-law to ban the transmission, distribution, sale, or use of natural gas within Toronto depends on the scope of the City’s by-law authority under the City of Toronto Act, 2006 and related statutory authorities.  Among other things, section 11 of City of Toronto Act, 2006 limits that authority to those City by-laws that do not conflict with a provincial or federal statute, regulation, order, license, approval or similar instrument.  Additional information about this issue is included in Confidential Attachment 1 to the City Solicitor’s supplemental report on this item.

 

This report focuses on the matters raised in Council motion 2024.IE11.8, namely the City’s relationship with Enbridge regarding renewable natural gas projects, City staff’s recent comments on Bill 165 which deals with expanding new connections to the provincial natural gas grid, and Enbridge’s use of public property (especially the right of way).

 

Beyond these specific matters, the City has the ability to influence demand for natural gas through setting standards for greenhouse gas emissions and energy efficiency for new and existing buildings in Toronto. For new buildings, the City’s innovative Toronto Green Standard recommends energy efficiency and greenhouse gas intensity standards that are intended to become progressively more stringent over time for new residential (minimum 10 units) and non-residential developments. Toronto Green Standard consists of tiers of performance with Tier 1 being mandatory and applied through the planning approval process. It is intended that by May 2028, if adopted by Council, the Toronto Green Standard requirements for near zero greenhouse gas emissions will discourage new natural gas connections for heating or domestic hot water. City Council has also directed staff to develop an Emission Performance Standards by-law to address greenhouse gas emissions from existing buildings. If Council enacts a by-law requiring existing buildings to meet such emission standards, then property owners may need to take measures to reduce the greenhouse gas emissions from their buildings, which may include reducing the use of natural gas.

 

Regarding the matters raised in Council motion 2024.IE11.8:

 

- Renewable Natural Gas - In collaboration with Enbridge, Solid Waste Management Services has developed Renewable Natural Gas production facilities at the City’s Organic Processing Facilities. While the City’s production of Renewable Natural Gas can play a useful role in the energy transition, it will be a limited role because production is itself limited by the amount of biogas and landfill gas available. Solid Waste Management Services is currently working with Enbridge towards development of an Renewable Natural Gas production facility at the City’s Green Lane Landfill

 

- Bill 165: In April the Executive Director of Environment and Climate made oral and written submissions to the Ontario Legislature’s Standing Committee on the Interior, pursuant to Council authority, detailing concerns about potential negative affordability and climate impacts for Toronto from Bill 165, the Keeping Energy Costs Down Act, 2024. The written submission is Attachment “A” to this report. The Environment and Climate Division is monitoring for consultation opportunities with the Government of Ontario on its forthcoming natural gas policy statement, announced by the Minister of Energy alongside Bill 165.1

 

- Enbridge Use of Public Property: Provincial regulation currently precludes the City from applying a land-based charge for Enbridge’s use of the right of way (same for a telecom company, electricity generator, or electricity transmitter or distributor). Municipalities outside Ontario can and do charge gas utilities for use of the right of way (including Edmonton, Calgary and Regina) generating revenue between $24 and $97 per capita annually. Were the Province to amend its regulation and City Council decided to apply a land-based charge to Enbridge’s use of the right of way, it could generate between $73 million and $293 million in total annual revenue based on the range of currently observed charges elsewhere. If City Council decided to apply a land-based charge it could also decide to reduce the amount by the amount Enbridge would otherwise pay in property taxes on its gas pipelines in a given year. City staff plan to engage with the province about potential for regulatory change.

 

Enbridge could seek to pass on the cost of any land-based charge for use of the right of way to natural gas ratepayers in Toronto. Whether Enbridge could do so would be subject to provincial laws and regulatory approval.

 

Applying a land-based charge could align with the need to transition away from fossil fuels and move toward lower carbon energy like electricity from Ontario’s relatively clean grid and local renewable generation. To the extent that Council directed any future revenues from a land-based charge for Enbridge’s use of the right of way (if permitted by law) toward adapting City infrastructure like roads, bridges and sewers to withstand the impacts of climate change caused by fossil fuels, such as more frequent and intense storms, this could amplify the climate-related benefits of the charge.


1https://news.ontario.ca/en/backgrounder/1004216/the-keeping-energy-costs-down-act

Date
2024-06-27 11:23 AM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
19-1
Status
Carried
Jun 27, 2024
2024.EY14.1

Jane Finch Secondary Plan and Urban Design Guidelines - Final Report

This report recommends that City Council adopt the recommended Jane Finch Secondary Plan and associated Urban Design Guidelines, to provide a comprehensive planning framework for the area around the intersection of Jane Street and Finch Avenue West.

 

This Official Plan Amendment (OPA) would leverage the significant public investment in new transit infrastructure through the Finch West Light Rail Transit (LRT) by directing development to appropriate locations, transforming the area to support walking, cycling and transit use, and identifying public realm improvements and community facilities necessary to meet the needs of existing and future residents and workers. It advances the vision of an inclusive, transit-supportive and climate-resilient complete community, with a strong mixed-use core where local-serving retail and service uses would continue to thrive. The Secondary Plan would facilitate the development of significant new housing, with policies that encourage a diversity of housing types, forms, tenures and affordability. The Secondary Plan centres equity with a focus on outcomes for Indigenous, Black and equity-deserving groups, including implementation policies that would minimize displacement of residents and businesses.

 

This report also recommends amendments to other Official Plan policies. These include extending the Avenues along the Finch West Light Rail Transit route, adjusting right-of-way widths for Jane Street and Finch Avenue West to support objectives for a complete street with a generous public realm, transit-priority measure and planned higher-order transit, redesignating certain lands close to Light Rail Transit stops to Mixed Use Areas and in one location to Apartment Neighbourhoods, and establishing locations for new streets to create developable blocks within the large mall, plaza and mixed-use sites in the study area. Two Site and Area Specific Policies are recommended for deletion to align plans for those sites with this updated policy context.

 

The Jane Finch Secondary Plan and Urban Design Guidelines are an outcome of the Jane Finch Initiative, which is an interdivisional three-phased project that began in 2020. A companion plan, the Jane Finch Community Development Plan, stewarded by Social Development Finance and Administration (SDFA) and Economic Development and Culture (EDC), is proceeding through Economic and Community Development Committee in the same City Council cycle. The Jane Finch Initiative was informed by a thorough public consultation process facilitated by the Jane/Finch Centre, concurrent review of development applications, and input of staff from various City Divisions, commenting agencies and key stakeholder organizations. Two previous reports to City Council presented various milestones of the planning study, the most recent being the adoption of the Ideas Report by City Council in May 2022. This staff report presents the results of the public consultation process for Phase 2 (on the Ideas Report) and for Phase 3 (on the proposed Secondary Plan and Urban Design Guidelines).

 

This recommended Official Plan Amendment is consistent with the Provincial Policy Statement (2020) and conforms to A Place to Grow: Growth Plan for the Greater Golden Horseshoe (2020) and the Greenbelt Plan (2017).

Date
2024-06-27 10:56 AM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
21-2
Status
Carried
Jun 27, 2024
2024.EC10.1

Jane Finch Community Development Plan 2024-2034

The opening of the Finch West Light Rail Transit line stands to bring intensive and long-term change to the Jane Finch Area. Jane Finch is an area shaped by a history of underinvestment but also a history of community organizing and action responding to community needs. Growing evidence suggests that without focused investments in Reconciliation, equity and systems-wide strategies and supports, neighbourhoods with a history of underinvestment can experience increased levels of disruption and harm as a result of increased development pressure. For new investments to positively impact existing and new Jane Finch residents, holistic supports and policy frameworks must be put in place that reflect the diverse visions of Jane Finch residents, grassroots groups, local organizations, artists, and local businesses. New policies, programs and partnerships must focus where the need is greatest and address the inequities that shape the lives of residents, with priority given to Indigenous, Black, and equity-deserving groups in Jane Finch.

 

The purpose of this report is to present a proposed Jane Finch Community Development Plan, and to outline the interdivisional and community-led Jane Finch Initiative process that led to the proposed plan. The report also lays out immediate and longer-term next steps to implement the plan.

 

The Jane Finch Community Development Plan 2024-2034 is a resident-informed plan for the future of the Jane Finch Area led by Social Development, Finance and Administration and Economic Development and Culture. The Community Development Plan is a 25-year plan and commitment to Jane Finch that will be renewed every 10 years with the first 10 years beginning in 2024 and ending in 2034.  The Jane Finch Community Development Plan accompanies the Jane Finch Secondary Plan – both aim to ensure that residents, local groups, organizations and businesses are supported as the area changes over time, including with the opening of the Finch West Light Rail Transit. To this end, the Jane Finch Community Development Plan sets out a 10-year community support and resourcing framework.

 

While the Secondary Plan will provide consistent land use and urban design guidelines for new development, the Community Development Plan is focused on social, economic, and cultural themes. Actions to support Jane Finch communities under these themes will continue to evolve through ongoing partnerships and discussions between multiple parties including the City of Toronto, residents, community organizations and local institutions.

 

The focus and content of the Community Development Plan are the result of a 2-year partner-led engagement process and intensive collaboration between participating City divisions and the Jane/Finch Centre. Through the engagement process, the Jane Finch Community Development Plan has identified the following eight action areas:

  • Access to Space and Mobility
  • Food Justice and Sovereignty
  • Community Safety and Wellbeing
  • Climate Action
  • Arts, Culture and Heritage
  • Inclusive Employment Opportunities
  • Inclusive Entrepreneurship Opportunities
  • Anti-Displacement Strategy

The Community Development Plan will advance actions across the eight action areas. The actions will be guided by principles that reflect the City of Toronto's commitments to Indigenous, Black and equity-deserving groups and vulnerable populations through the City's Reconciliation Action Plan, Action Plan to Confront Anti-Black Racism and broader equity-driven strategies, initiatives and programs.

 

In the process of developing the Jane Finch Community Development Plan, the City has established a strong interdivisional collaboration and community partnership approach to advance both the Jane Finch Community Development Plan and Secondary Plan. The lessons learned through the engagement and development process and through interdivisional collaboration will continue to inform ongoing monitoring and implementation.

Date
2024-06-27 10:55 AM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
23-0
Status
Carried
Jun 27, 2024
2024.PH13.9

Community Housing Sector Modernization and Growth Strategy

In Toronto, Community Housing (or non-market housing) refers to social and affordable housing that is owned and/or operated by non-profit housing organizations (including community land trusts), non-profit housing co-operatives ("Co-ops"), and Indigenous housing providers (collectively referred to as “Community Housing Providers”), along with the Toronto Community Housing Corporation (TCHC) and the Toronto Seniors Housing Corporation (TSHC). Community Housing is typically developed and operated with publicly funded capital contributions, and ongoing rental subsidies. Furthermore, it is a critical segment of the housing continuum and provides rental housing options for low-and-moderate-income households.

 

In addition to over 57,500 homes provided by Toronto Community Housing Corporation and Toronto Seniors Housing Corporation, there are currently over 200 Community Housing Providers in Toronto that operate over 40,000 subsidized Rent-Geared-To-Income (RGI) and affordable homes. About 75% of this stock was built prior to 1987 utilizing federal and provincial funding programs. Action from all orders of government is urgently needed to preserve and modernize these aging homes.

 

Recognizing the need to accelerate efforts to maintain the city’s Community Housing stock, in March 2023, through Item - 2023.EX3.1, “Housing Action Plan 2022-2026 ("HAP") and in November 2023, through Item - 2023.EX9.3 - “Generational Transformation of Toronto’s Housing System to Urgently Build More Affordable Homes”, City Council directed staff to report back on a strategy to modernize and grow the Community Housing sector, and provide additional support for Community Housing Providers.

 

The report responds to Council’s requests and recommends a new Community Housing Sector Modernization and Growth Strategy ("the Strategy") aimed at:

  • protecting the city's existing Community Housing stock through preserving the assets as well as maintaining affordability;
  • creating net new Community Housing that will support the City in achieving its target of approving 65,000 rent-controlled homes by 2030; and
  • improving access to housing opportunities for low-and-moderate income households, particularly Indigenous residents and those from equity-deserving groups.

The proposed Strategy, included as Attachment 1, encompasses six key initiatives to achieve these objectives, including:

 

1. A New Regulatory and Funding Framework to Maintain Homes Operated by Community Housing Providers Under Part VII.1 of the Housing Services Act The new regulatory framework will allow the City, as Service Manager, to secure partnerships that will continue to offer affordable and deeply affordable housing with Community Housing Providers operating under Part VII of the Housing Services Act whose mortgages are expiring.

 

2. A New Policy Framework to Guide Ground Lease Arrangements Between the City of Toronto and Community Housing Providers – A number of Community Housing Providers operate buildings on land leased from the City and need a lease extension, renewal or a new lease in order to continue to operate, or to refinance buildings and complete required upgrades/major repairs/modernization. The City is also focused on offering more of its land, through long-term leases to the Community Housing sector to scale up the delivery of non-market homes. A new policy framework is proposed in Attachment 2 to guide lease arrangements and ensure a consistent approach for both the City and Community Housing Providers as it relates to new leases, extensions and renewals.

 

3. Program Enhancements and Additional Financial Support to Acquire and Create New Community Housing – This report recommends changes to the Multi-Unit Residential Acquisition (MURA) program that would enable Community Housing Providers to use Multi-Unit Residential Acquisition funding to acquire a wider range of housing types, including larger buildings (those with greater than 60 units), smaller buildings (those with less than 6 units) such as multi-tenant homes, and condominium units.

 

4. Encouraging Development and Intensification Opportunities – The City will work with organizations who own land to identify opportunities to create new Community Housing. In addition, staff will continue to advance a number of changes to the Official Plan, zoning by-laws, and planning guidelines through the Housing Action Plan that would result in greater as-of-right development permissions, making it more predictable, simpler and quicker to add new housing supply.

 

5. An Expedited Development and Permitting Review Process for Community Housing Applications – This report recommends considering the establishment of a Community Housing Priority Stream to expedite development and permitting review and approvals of eligible Community Housing projects, and the utilization of all available tools to expedite zoning approvals.

 

6. Partnerships to Support Community Housing Sector Action to Build New and Modernize Existing Homes – Enhancing the development, asset management and governance capacity of Community Housing Providers will entail working with sector partners to develop resources and provide advisory services, and to explore opportunities for mergers, acquisitions and strategic partnerships between organizations to achieve economies of scale and/or to be able to leverage a larger asset pool for accessing capital required for new developments and repairs that will support longer-term growth and sustainability. The City will leverage its existing relationships within the sector and explore new partnerships and collaboration opportunities with organizations that can provide advisory services and support to Community Housing Providers.

 

The measures in this report are complemented by the “Launching the Rental Housing Supply Program” report that is to be considered by the Planning and Housing Committee at the same meeting on June 13, 2024. This complementary report recommends additional financial support for new Community Housing through a proposed three-year, Community Housing Pre-Development Fund Pilot. Through this proposed pilot, Community Housing Providers can apply for financial assistance to cover the cost of pre-development activities that are crucial in supporting new community housing projects.

 

The Strategy recommended in this report takes a comprehensive approach to sustain, modernize and grow the Community Housing sector in Toronto. It was informed by engagement with Community Housing Providers, the Housing Secretariat’s Tenant Advisory Committee, and key sector organizations such as the Ontario Non-Profit Housing Association (ONPHA), the Toronto Alliance to End Homelessness (TAEH), the Co-op Housing Federation of Toronto (CHFT), and United Way Greater Toronto (UWGT).

 

While the Strategy is focused on City-specific initiatives, immediate and complementary action is urgently needed from the federal and provincial governments. This includes new and enhanced investments to: grow the Community Housing sector; support low- and-moderate-income households to access and maintain their homes; improve access to supports and services; and build new affordable rental, co-operative and Rent-Geared-To-Income homes within complete communities.

Date
2024-06-27 09:53 AM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
20-1
Status
Carried
Date
2024-06-13
Motion
Adopt Item
Vote
Yes
Decision body
Planning and Housing Committee
Total
6-0
Status
Carried
Jun 26, 2024
2024.EX15.5

Moss Park Arena - Governance and Operational Review

This report responds to City Council's direction to the City Manager, in consultation with the General Manager, Parks, Forestry and Recreation, to assess the impacts of transitioning the governance and operations of Moss Park Arena from a Board of Management to a City-operated arena. This report provides governance considerations as well as financial, operational, staffing and program impacts of such a transition.

 

Moss Park Arena provides indoor ice sport facilities along with programming including hockey leagues, hockey camps, and instructional programs. It is operated by a Board of Directors, appointed by City Council through the Civic appointments process and follows City policy in terms of how ice is allocated to community user groups.

 

If directed by City Council to transition Moss Park Arena from a Board of Management to a City-operated arena, a transition plan would need to be developed and implemented. This plan would include, but not be limited to, transitioning current programming to third party user groups, renegotiating ice contracts, a workforce management assessment and Council approval of additional operating funding required, through the budget process.  

Date
2024-06-26 17:07 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
18-5
Status
Carried
Date
2024-06-26 17:06 PM
Motion
Receive Item
Vote
No
Decision body
City Council
Total
6-17
Status
Lost
Jun 26, 2024
2024.EX15.3

Advancing the Homelessness Services Capital Infrastructure Strategy (HSCIS) and the 2025 Shelter Infrastructure Plan

This report provides an update on Toronto Shelter and Support Services’ (TSSS) long-term, proactive approach to capital planning through the new Homelessness Services Capital Infrastructure Strategy (HSCIS). This report also seeks funding to increase the total number of new long-term and permanent spaces in the base shelter system by 1,600 spaces between 2024 and 2033. The majority of these new spaces will replace the temporary spaces secured during the COVID-19 pandemic, including hotel sites, and will support recovery and stability of the shelter system. The requested funding will advance securing up to five new shelter sites in 2024 through acquisitions, and additional sites through development on existing City-owned land for the first phase of the HSCIS. The City is in active negotiations with the federal government to secure  capital funding for the HSCIS Strategy.

 

This report also provides an update on other TSSS shelter development projects as part of the 2025 Shelter Infrastructure Plan as required by the Emergency Shelter Development Process (ESDP), approved by City Council in 2017. The Infrastructure Plan provides updates on the Housing and Shelter Infrastructure Development project (HSID, formerly 1,000 beds), the George Street Revitalization (GSR) project, in addition to the new projects as part of the HSCIS that will begin in 2024.

 

Finally, this report provides an update on the Council-approved COVID-19 Shelter Transition and Relocation Plan, including de-commissioning plans for temporary shelter hotel locations with the largest (more than 200) single adult and chronically homeless populations.

Date
2024-06-26 16:14 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Date
2024-06-26 16:13 PM
Motion
Amend Item (Additional)
Vote
No
Decision body
City Council
Total
21-3
Status
Carried
Date
2024-06-26 16:12 PM
Motion
Amend Item
Vote
No
Decision body
City Council
Total
8-16
Status
Lost
Jun 26, 2024
2024.CC19.12

300 Borough Drive, 1755 Brimley Road, 400 to 580 Progress Avenue and 350 Town Centre Court - Ontario Land Tribunal Hearing - Request for Directions

  • On September 2, 2021, an Official Plan Amendment application was submitted for multiple locations around Scarborough Town Centre.
  • The applicant appealed the City Council's inaction on this application to the Ontario Land Tribunal on October 17, 2022.
  • A hearing is scheduled for October 15, 2024, requiring the City Solicitor's further direction.

Decisions and Recommendations

  • City Council adopted confidential instructions from the City Solicitor on June 26 and 27, 2024.
  • Public release of specific confidential recommendations was authorized.
  • Council accepted a settlement offer dated June 11, 2024, and directed the City Solicitor to support this at the Ontario Land Tribunal.
  • The City Solicitor was tasked with preparing a final draft Official Plan Amendment reflecting the settlement.
  • Confidential information will remain private at the City Solicitor's discretion until further notice.
AI Generated
Date
2024-06-26 14:42 PM
Motion
Adopt Item
Vote
Absent
Decision body
City Council
Total
23-0
Status
Carried
Jun 26, 2024
2024.IE14.5

On-Street Logistics Mini-Hub on St. George Street - Pilot Update and Next Steps

On June 15 and 16, 2022, City Council approved a pilot project of up to eighteen (18) months for Toronto's first On-Street Logistics Mini-Hub, to further support and investigate last-mile deliveries in combination with electric cargo bike operations.

 

The Mini-Hub, which is a repurposed shipping container, was located within a parking layby on St. George Street within the University of Toronto's downtown campus. The multifunctional structure has been operated by Purolator Incorporated courier company and has served as a redistribution center for the pick-up and drop-off of packages by customers and a storage location for the company's large cargo e-bike delivery fleet.

 

Following the completion of the Mini-Hub's pilot period, which ended in April of this year, Transportation Services is reporting back to City Council to provide information about the outcome of the trial and recommend next steps. Given the findings from the pilot, which are detailed in this report, Transportation Services is seeking City Council's approval to allow the creation of an On-Street Logistics Mini-Hub program that can be rolled out in other areas of the city with other courier companies where locations are deemed suitable and to approve the continued operation of the Mini-Hub on St. George Street. In addition, the report also seeks Council's approval to establish an On-Street Logistics Mini-Hub permit fee ($6,401.80 per year, per parking space displaced) and an application fee for an On-Street Logistics Mini-Hub ($218.20 per request) that would be charged to courier companies wanting to participate in the program, including administrative penalty amounts for unauthorized vehicles parking, stopping and standing in the Mini-Hub area and courier companies do not properly display the permit issued for the Mini-Hub.

Date
2024-06-26 14:36 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
24-1
Status
Carried
Jun 26, 2024
2024.PH13.3

2444 Eglinton Avenue East - Zoning Amendment - Decision Report - Approval

This application proposes to amend the Zoning By-law for the lands at 2444 Eglinton Avenue East to permit the construction of a mixed use building consisting of 3 towers above a base building containing above grade parking and non-residential uses at grade.

 

The development would include a 31-storey condominium building above a 4 storey podium, along with two co-op buildings of 19  and 41-storeys atop a 5-storey podium. The two co-op buildings consist of 612 co-op housing units and the condominium building consists of 307 units. The tenure of the units includes, market condominium units (307), market co-op units (306) and affordable co-op units (306). The total gross floor area of the proposal is 64,143 square metres, inclusive of 1871 square meters of non-residential uses.

 

The proposed development is consistent with the Provincial Policy Statement (2020) and conforms with A Place to Grow: Growth Plan for the Greater Golden Horseshoe (2020). The proposed development also conforms to the City's Official Plan. The development is part of the City’s Housing Now Initiative to deliver affordable housing and mixed-income, mixed-use, transit-oriented communities on City-owned properties. This proposed development intensifies an underutilized site with a range of housing options in terms of tenure and affordability, while providing a mix of at-grade non-residential uses that will support and enhance the public realm. It is immediately adjacent to a multi-modal transit station with convenient connections to multiple transit lines and surface transit routes.

 

This report recommends approval of the application to amend the Zoning By-law  subject to a Holding Provision required to address servicing matters.

Date
2024-06-26 14:32 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
23-0
Status
Carried
Date
2024-06-13
Motion
Amend Item (Additional)
Vote
Yes
Decision body
Planning and Housing Committee
Total
7-0
Status
Carried
Date
2024-06-13
Motion
Adopt Item as Amended
Vote
Yes
Decision body
Planning and Housing Committee
Total
7-0
Status
Carried
Jun 26, 2024
2024.PH13.7

Renovictions Policy Implementation: Review of Hamilton Renovation Licence and Tenant Relocation By-law and developing a Toronto Renovictions By-law

The HousingTO 2020-2030 Action Plan and Toronto Housing Charter, both adopted in 2019, commit the City to advancing the progressive realization of the right to adequate housing and set a number of strategic priorities related to protecting tenants, preserving affordable housing supply, and realizing a vision of a city where everyone has a safe, affordable place to call home. City Council has recently increased its housing targets under the HousingTO Plan, however, to ensure the City has sufficient affordable rental homes for low- and moderate-income residents, it is also vital to preserve existing affordable rental homes. As a result of factors impacting Toronto's housing market, including low rental vacancy rates, insufficient new rental homes, and the financialization of housing, over the past decade the Toronto region has lost more affordable and mid-range rental homes than have been built. These housing market pressures combined with gaps in provincial rent control requirements have resulted in increased rates of evictions, with disproportionate impacts on low-income and marginalized residents, including those from equity-deserving groups.

 

There have been reports of a growing trend of renovictions in Toronto, where a landlord illegitimately evicts a tenant by alleging that vacant possession of a rental unit is needed to undertake renovations or repairs. Renovictions can include refusing to allow a tenant who has exercised their right of first refusal to return post-renovation, illegally raising the rent on a returning tenant, or not undertaking major renovations after evicting renters. This results in the displacement of tenants, the permanent loss of affordable market rental housing, and contributes to rising homelessness in Toronto.

 

The Province of Ontario has jurisdiction over rent control policy and landlord-tenant matters through the Residential Tenancies Act, 2006. The most effective tools to protect tenants and deter renovictions reside at the provincial level. City Council has previously requested that the Province introduce measures to amend provincial legislation to protect tenants from renovictions, including but not limited to: introducing rent control that is maintained upon turnover of a unit, requiring landlords to provide temporary relocation assistance while renovations are taking place, and creating a centralized data system and registry for rental properties and eviction activities in Toronto.

 

In the absence of these changes, Toronto and other cities are considering steps to address the growing trend of renovictions within their authorities. On July 19, 2022, City Council, through Item PH35.18, adopted a Renovictions Policy as a framework to guide the development of a new renovictions by-law that would respond to growing trends in illegitimate evictions, protect tenants, and preserve affordable housing supply.

 

In January 2024, the City of Hamilton adopted a Renovation Licence and Tenant Relocation By-law (“Hamilton by-law") that aims to prevent renovictions and mitigate harms to tenants by requiring a licence to renovate tenanted rental units. The by-law includes several new requirements of landlords to achieve these objectives and establishes a dedicated investigation, compliance, and enforcement framework. The Hamilton by-law was enacted on April 10, 2024, and the administrative and enforcement framework are under development. The Hamilton by-law is expected to come into force January 1, 2025.

 

On February 28, 2024, the Planning and Housing Committee directed staff to include in this report consideration and analysis of the Hamilton by-law and how that approach could be adopted by Toronto. This report responds to this direction and provides staff’s analysis of implementation considerations related to the Hamilton by-law. Further comments respecting the by-law will be provided by the City Solicitor by way of a separate report. It also provides City Council with an update on actions underway to implement the renovictions policy and corresponding by-law, and provides necessary context regarding provincial policy and legislative changes impacting renovictions and tenants’ rights (including Provincial Bill 97, Helping Homebuyers, Protecting Tenants Act, 2023). Finally, the report provides Council with information on how the Hamilton by-law approach could be implemented in Toronto, should Council provide such direction.

Date
2024-06-26 11:36 AM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
22-1
Status
Carried
Date
2024-06-26 11:35 AM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
22-1
Status
Carried
Date
2024-06-13
Motion
Adopt Item as Amended
Vote
Yes
Decision body
Planning and Housing Committee
Total
7-0
Status
Carried
Jun 26, 2024
2024.CC19.1

Declaring the Office of Councillor, Ward 15 - Don Valley West Vacant and Filling the Vacancy

  • The meeting addressed the vacancy of the Councillor for Ward 15 - Don Valley West.
  • This vacancy arose due to the passing of Councillor Jaye Robinson.
  • City Council must declare the office vacant by June 26-28, 2024.
  • Council has 60 days to fill the vacancy through either appointment or a by-election.

Decisions and Recommendations

  • City Council declared the office of Councillor, Ward 15 - Don Valley West, vacant.
  • Council decided to fill the vacancy by holding a by-election for Ward 15.
  • An in-year budget adjustment of $550,000 was approved for the City Clerk's Office to fund the by-election, fully supported by the Election Reserve Fund.
AI Generated
Date
2024-06-26 10:27 AM
Motion
Amend Item
Vote
Absent
Decision body
City Council
Total
22-0
Status
Carried
Jun 13, 2024
2024.PH13.4

Housing Action Plan: As-of-Right Zoning for Mid-rise Buildings on Avenues and Updated Rear Transition Performance Standards - Proposals Report

  • The City Council meeting focused on housing initiatives under the Housing Action Plan and the Expanding Housing Options in Neighbourhoods (EHON) initiative.
  • Discussions included amendments to the Zoning By-law and Urban Design Guidelines to support mid-rise buildings in designated areas.
  • The aim is to increase housing supply and meet provincial targets for new homes over the next decade.

Decisions and Recommendations

  • The Planning and Housing Committee directed the Chief Planner to consult with stakeholders and the public on the draft zoning by-law amendment, with a report due in the third quarter of 2024.
  • The Committee also instructed the incorporation of updated Rear Transition Performance Standards for mid-rise buildings into the Urban Design Guidelines by the fourth quarter of 2024.
  • Additionally, a report on the history and classification of Craven Road was requested, exploring options to exclude it from as-of-right planning permissions for garden suites.
AI Generated
Date
2024-06-13
Motion
Amend Item (Additional)
Vote
No
Decision body
Planning and Housing Committee
Total
1-6
Status
Lost
Jun 12, 2024
2024.SC14.5

4201 to 4203 Kingston Road and 120 Galloway Road - Zoning Amendment Application - Decision Report - Approval

This application proposes to amend the Zoning By-law to permit the construction of a 4-storey apartment building at 4201 to 4203 Kingston Road and a portion of 120 Galloway Road at the southeast of the overall subject site.

 

The building would contain 68 affordable rental housing units with a total gross floor area of 4847 square metres, resulting in a density of 0.96 times the area of the site. A total of 54 one-bedroom units and 14 two-bedroom units are proposed. The proposed infill development site includes 2,076 square metres of Toronto District School Board (TDSB) lands located on 120 Galloway Road which were added to the proposed site through an approved consent application to the Committee of Adjustment on May 1, 2024 (Application no. B0006/24SC). The proposed development would be supported by a total of 5 vehicular parking spaces, as well as 57 bicycle parking spaces.

 

The proposed development is consistent with the Provincial Policy Statement (2020) and conforms with A Place to Grow: Growth Plan for the Greater Golden Horseshoe (2020). The proposed development also conforms to the City's Official Plan. The proposed development responds to the City’s affordable housing strategy and provides residential intensification on a site that benefits from frequent bus service in close proximity to the Guildwood GO Station.

 

This report reviews and recommends approval of the application to amend the Zoning By-law.

Date
2024-06-12
Motion
Adopt Item
Vote
Yes
Decision body
Scarborough Community Council
Total
5-0
Status
Carried
Jun 12, 2024
2024.SC14.18

Brimley Road and McNicoll Avenue - Intersection Safety Review

As the Toronto Transit Commission (TTC) operates a transit service on Brimley Road and on McNicoll Avenue, City Council approval of this report is required.

 

Scarborough Community Council directed Transportation Services to conduct a review of safety and operational concerns for road users at the intersection of Brimley Road and McNicoll Avenue. This report provides an overview of the assessments undertaken by Transportation Services.

 

Transportation Services is recommending an eastbound right turn on a red signal prohibition at Brimley Road and McNicoll Avenue, as well as other improvements to refresh/enhance the signs and pavement markings at the intersection.

Date
2024-06-12
Motion
Adopt Item
Vote
Yes
Decision body
Scarborough Community Council
Total
5-0
Status
Carried
May 23, 2024
2024.MM18.24

Requesting the Province to Protect Small Businesses and Support Vibrant, Affordable, and Successful Mainstreets

  • The meeting focused on the challenges faced by small businesses in Toronto.
  • Local businesses, such as restaurants and bookstores, contribute to the unique character of neighborhoods.
  • Many are threatened by significant increases in commercial rent, with rates rising by 20% from 2021 to 2023.
  • The lack of rent control for commercial spaces leads to closures and discourages new businesses.
  • Vacant storefronts negatively impact community vibrancy and local economies.

Decisions and Recommendations

  • Councillor Josh Matlow, supported by Councillor Mike Colle, proposed several actions.
  • City Council requested the Government of Ontario to:
    1. Implement commercial rent control for small, locally-owned businesses.
    2. Establish a dispute resolution tribunal for commercial tenants and landlords.
    3. Develop and require standardized leases for commercial tenants and landlords.
  • These recommendations were adopted by City Council on May 22 and 23, 2024.
AI Generated
Date
2024-05-23 22:27 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
21-1
Status
Carried
Date
2024-05-23 14:49 PM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
20-4
Status
Carried
May 23, 2024
2024.MM18.16

Requesting the Province to Create Safety Zones Around Places of Worship, Faith-Based Schools and Vulnerable Community Social Infrastructure

  • The meeting addressed a significant rise in hate crimes in Toronto, with a 93% increase reported since October 2023.
  • Antisemitic incidents made up 56% of these hate crimes, alongside increases in anti-LGBTQ, anti-Black, and anti-Arab, Muslim, and Palestinian hate.
  • The City Council had previously passed a motion to create community safety zones to protect vulnerable locations, but no zones have been established yet.
  • Continued protests near these facilities have caused fear among residents.

Decisions and Recommendations

  • City Council requested the Attorney-General of Ontario to introduce legislation for safety zones around places of worship, faith-based schools, and community centers, similar to existing "bubble zone" laws.
  • Council adopted a recommendation for the City Manager and City Solicitor to develop an action plan ensuring Torontonians can practice their faith and exercise their rights without intimidation, to be communicated to relevant bodies, including the Toronto Police Service Board.
AI Generated
Date
2024-05-23 22:26 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
13-11
Status
Carried
May 23, 2024
2024.MM18.10

Publicly Providing Receipts Before City Council Consideration of Expenses under the Members of Council Operations Policy

  • The City Council meeting focused on the importance of transparency and accountability in local governance.
  • The City is recognized for being accessible and open to the public.
  • Recent events have emphasized the need for ongoing improvements in Council processes.

Decisions and Recommendations

  • Councillor Paula Fletcher, supported by Councillor Jon Burnside, proposed a recommendation.
  • City Council decided to amend the Members of Council Operations Policy.
  • The amendment requires the City Clerk to include documentation, such as receipts, for expenses needing Council approval in the agenda items.
  • This change aims to enhance public trust by ensuring decisions are made with complete information.
AI Generated
Date
2024-05-23 20:45 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
22-0
Status
Carried
May 23, 2024
2024.CC18.12

Official Plan Amendment 573 - Danforth Avenue - Planning Study (Segment 2 - Don Valley to Coxwell Avenue)

  • The City Council meeting took place on November 8 and 9, 2023.
  • City Council discussed Official Plan Amendment 573 and Site and Area Specific Policy 772 related to Danforth Avenue.
  • An appeal to the Ontario Land Tribunal is scheduled for December 2, 2024.
  • The meeting focused on the urgent need for affordable housing in Toronto.

Decisions and Recommendations

  • City Council approved the amended recommendations for housing transformation.
  • Recommendation 30 was added, directing the City Solicitor to report on revisions to Site and Area Specific Policy 772 by December 13, 2023.
  • The revisions aim to support redevelopment at 1117 Danforth Avenue, including new affordable units.
  • Confidential recommendations from the City Solicitor were adopted, allowing for public release while keeping some information confidential.
  • Additional policies were requested to support development height and setback adjustments to promote affordable housing while ensuring no negative impacts on the public realm.
AI Generated
Date
2024-05-23 20:24 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
21-1
Status
Carried
May 23, 2024
2024.TE13.7

1117 Danforth Avenue - Zoning By-law Amendment and Rental Housing Demolition Applications - Decision Report - Approval

This application proposes to amend the Zoning By-law to permit a 14 storey mixed-use building with 108 affordable and rent-controlled market units, including 27 social housing replacement units, and 50 square metres of commercial/retail space at grade at 1117 Danforth Avenue.

 

This report also recommends approval of the Rental Housing Demolition application. The proposal includes a Tenant Relocation and Assistance Plan that address the right for existing tenants to return to replacement social housing dwelling units at similar rent and interim accommodation at rent-geared-to-income levels for the duration of the construction period.

 

The proposed development is consistent with Provincial Policy Statement (2020), conforms with the Growth Plan (2020), and represents an appropriate form and scale of development.

 

This report reviews and recommends amending the Zoning By-law with a holding provision (“H”) to address a shared loading space.

Date
2024-05-23 20:22 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
20-1
Status
Carried
May 23, 2024
2024.TE13.6

1095 and 1111 Danforth Avenue - Zoning By-law Amendment Application - Decision Report - Approval

This report reviews and recommends approval of an application to amend the City of Toronto Zoning By-law 569-2013 to permit a 13 storey mixed use development at 1095 and 1111 Danforth Avenue. The building is proposed to contain 272 rental dwelling units, 673.7 square metres of non-residential gross floor area and one level of underground parking. Staff support approval of the proposed development, as it responds to the City's affordable housing strategy, provides an enhanced public realm, and integrates and retains the façade of the Trull Funeral Home at 1111 Danforth Avenue, identified as having cultural heritage value.

 

This report recommends a holding provision (“H”) be included in the proposed Zoning By-law Amendment, to address a shared loading arrangement with the neighbouring 1117 Danforth Avenue proposal (file 24 120936 STE 14 OZ).

 

The proposed development is consistent with the Provincial Policy Statement (2020) and conforms with A Place to Grow: Growth Plan for the Greater Golden Horseshoe (2020), and represents an appropriate form and scale of development.

Date
2024-05-23 20:20 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
19-1
Status
Carried
May 23, 2024
2024.MM18.5

Taking Congestion Seriously - A Plan to Accelerate Construction of the Gardiner Expressway

  • Toronto has been named the most congested city in North America.
  • Recent travel times on the Gardiner Expressway have doubled.
  • Traffic issues are harming local businesses and the economy.
  • Residents are seeking solutions to improve quality of life.

Decisions and Recommendations

  • City Council directed Transportation Services to report back by Q4 2024 with a plan to speed up the Gardiner Expressway rehabilitation.
  • The plan will include:
    • Evaluating 24/7 construction feasibility, including Sundays.
    • Assessing the use of pre-fabrication technologies to save time.
    • Reviewing upcoming road work near the Gardiner to reduce congestion.
  • An interim report will be provided in July 2024 as part of the Congestion Management Plan.
  • The report will also outline the working group’s composition and future reporting timelines.
AI Generated
Date
2024-05-23 20:13 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
20-3
Status
Carried
May 23, 2024
2024.IE13.2

eglintonTOday Phase 1 Complete Street Project: Bicknell Avenue to Mount Pleasant Road

With Metrolinx's construction of the Eglinton Crosstown Light Rail Transit nearing completion, Transportation Services has been preparing to complete roadway resurfacing of the Eglinton Avenue corridor, including the installation of the eglintonTOday Complete Street Project between Bicknell Avenue and Mount Pleasant Road - marking the end of over a decade of construction.

 

The City-Council endorsed Eglinton Connects plan articulates a vision for Eglinton Avenue as a complete street with wide sidewalks, raised bikeways, motor vehicle parking and rapid transit, and is aligned with the City's Vision Zero Road Safety Plan, TransformTO Net Zero Strategy and Cycling Network Plan policy goals.

 

The eglintonTOday project seeks to build on the transit investment in order to achieve key elements of the Eglinton Connects vision. The project design was developed with two years of public, business, and resident group feedback, extensive traffic analysis, and a context-sensitive approach making the street safer, more inviting, and attractive, while maintaining access for people who drive.

 

As part of this project, three north-south local bikeways connecting Eglinton Avenue and nearby trails are proposed on Croham Road, Glen Cedar Road, and Jimmy Wisdom Way.

 

The purpose of this report is to seek Council authority to install 8.06 centreline kilometres of new complete street features including bikeways along with the resurfacing of Eglinton Avenue. The proposed bikeways will close the gaps between the existing disconnected cycle tracks built at the frontages of 9 above-ground Eglinton Crosstown Light Rail Transit stations, and west of Bicknell Avenue and between Avenue Road and Holly Street, and provide connecting local cycling routes, on the following streets:

 

- Eglinton Avenue: Bicknell Avenue to Mount Pleasant Road (cycle tracks, Wards 5, 8, 9, and 12)

 

- Croham Road: Eglinton Avenue West to Bowie Avenue (contra-flow bike lanes, Ward 8)

 

- Glen Cedar Road: Eglinton Avenue West to Dewbourne Avenue (contra-flow bike lanes, Ward 12)

 

- Jimmy Wisdom Way: Eglinton Avenue West to Hopewell Avenue (bicycle lanes and contra-flow bike lanes, Ward 8)

 

The project proposes to implement complete street features including cycle tracks, curb extensions, pedestrian head start signals, and public realm upgrades on Eglinton Avenue between Bicknell Avenue and Mount Pleasant Road by reassigning some of the existing vehicular space to accommodate parking, bikeways, seasonal patio extensions, and other complete street features, and to fit within the existing curb to curb space:

 

- Between Keele Street and Caledonia Road, two westbound motor vehicle lanes and one eastbound motor vehicle lane are proposed to be maintained, generally with on-street parking on one side.

 

- Between Caledonia Road and Oakwood Avenue, one motor vehicle lane in each direction are proposed to be maintained with parking on both sides.

 

- Between Oakwood Avenue and Spadina Road, two westbound and two eastbound motor vehicle lanes are proposed to be maintained in the peak hours, with off-peak parking allowed in both curb lanes.

 

- Between Spadina Road and Mount Pleasant Road, one westbound and one eastbound motor vehicle lane with parking on one side is proposed to be maintained to match the Metrolinx delivered section between Yonge Street and Avenue Road.

 

If the continuous cycle tracks are not approved for installation, Transportation Services would recommend that the short segments of disconnected cycle tracks already built in front of the underground stations be closed. Without connecting bikeways, these short segments have limited utility for people cycling and would require people cycling to merge in and out of higher speed motor vehicle lanes, resulting in safety issues and confusion around where people cycling should be on the road.   

 

Subject to approval from Council, Transportation Services would implement the complete street project between Bicknell Avenue and Mount Pleasant Road starting in summer 2024, in conjunction with road resurfacing, sidewalk repair, and TTC bus stop changes to prepare for the opening of the Eglinton Crosstown Light Rail Transit.

 

In the vicinity of the Eglinton Avenue and Allen Road intersection, the complete street project for the section between Old Park Road / Glen Cedar Road and Marlee Avenue would be implemented only after adjustments are made to improve traffic operations at the intersection.

 

There are five Business Improvement Areas within the project limits. The Business Improvement Areas are at the initial stages of planning for near term streetscape enhancements. Business Improvement Area streetscape plans will identify elements such as parkettes, gateway features, enhanced pedestrian infrastructure, green infrastructure, street furniture, lighting, activation strategies, branding opportunities, bicycle parking and maintenance and management guidelines. 

 

Transportation Services has identified funding to support the delivery of the Business Improvement Areas' key streetscape enhancement projects and has committed to leading a multi-divisional team to leverage resources and identify opportunities to implement elements of the Business Improvement Area streetscape plans. Given the time required for the Business Improvement Areas to complete streetscape plans, design, and construction tendering, delivery of priority streetscape enhancements is anticipated to begin at the earliest in 2026.

 

As part of this report, Transportation Services is continuing to utilize the streamlined reporting process for by-law amendment submissions associated with cycling infrastructure projects approved by Council for implementation. Once projects are approved by Council, the streamlined process involves delegation of authority to submit bills directly to Council for a discreet period of time (approximately two years after project implementation is anticipated) which enables Transportation Services to make minor adjustments to constructed conditions without delay and based on local Councillor and public feedback, such as parking adjustments to improve sightlines, adjustments or addition of accessible loading areas, and similar modifications.

 

It is proposed that later in 2024, Transportation Services would begin the design and public consultation on the second phase of the eglintonTOday project between Mount Pleasant Road and Brentcliffe Road, with a report to Infrastructure and Environment Committee on recommendations for Phase 2 anticipated in 2025.

Date
2024-05-23 17:57 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
20-1
Status
Carried
Date
2024-05-23 17:56 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
19-1
Status
Carried
May 23, 2024
2024.MM18.22

Advancement of Professional Women's Soccer in Toronto, and Seeking Proposals for Lamport Stadium

  • The City Council meeting took place on December 13, 14, and 15, 2023.
  • The focus was on supporting women's professional soccer in Toronto.
  • The meeting aimed to promote gender equity in sports and explore opportunities related to the FIFA World Cup 2026.

Decisions and Recommendations

  • City Council supported establishing a professional women's soccer team in Toronto.
  • Staff were directed to explore potential sites, with Centennial Park and Lamport Stadium identified as suitable options.
  • Negotiations will occur with Association Football Club Toronto for Centennial Park's use, ensuring community access.
  • Proposals will be sought for a strategic tenant at Lamport Stadium to improve facilities and maintain community use, with protections for women's sports.
  • Reports on progress and community benefits will be provided to City Council.
  • Equitable public access terms will be negotiated for both sites.
AI Generated
Date
2024-05-23 17:41 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
22-0
Status
Carried
May 23, 2024
2024.TE13.8

1400 Gerrard Street East - Zoning By-law Amendment Application - Decision Report - Approval

This application proposes to amend the Zoning By-law to permit a 7 storey mixed-use building with 19 rental dwelling units and 121.8 square metres of retail/commercial space at grade at 1400 Gerrard Street East.

 

The proposed development is consistent with the Provincial Policy Statement (2020) and conforms with A Place to Grow: Growth Plan for the Greater Golden Horseshoe (2020). The proposed development also conforms to the City's Official Plan.

 

This report reviews and recommends approval of the application to amend the Zoning By-law. The mixed-use building is an appropriate scale for the site and fits within the existing and planned context of the surrounding area. Additionally, the proposal contributes to the overall supply and mix of housing units and tenure.

Date
2024-05-23 17:35 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
21-1
Status
Carried
May 23, 2024
2024.PH12.3

Expanding Housing Options in Neighbourhoods: Major Streets Study - Final Report

Toronto is a dynamic, growing city which continues to attract newcomers, with at least 700,000 new Torontonians expected by 2051. To continue to thrive, both current and future residents will need homes that accommodate the diversity of household sizes and compositions across the city, and as a result, Toronto needs a diverse range of housing options. In recent years, the city’s housing growth has largely been in mid-rise and high-rise buildings concentrated in densely populated areas like the Downtown, Centres, and Avenues, while the supply of low-rise housing, such as townhouses and small-scale apartment buildings, has not kept up with demand.

 

Toronto’s low-rise Neighbourhoods are changing, but much of this change has come through expanding and rebuilding single-detached homes, through refreshing the existing housing with larger homes. The addition of secondary suites, laneway suites, and garden suites has occurred more slowly. More recently, new permissions for Multiplexes have enabled buildings with up to four units across the city. Introducing additional permissions for townhouses and small-scale apartment buildings can allow Neighbourhoods to add more housing that complements existing neighbourhood housing while creating a more intensive edge to the neighbourhoods along the major streets.

 

Townhouses and small-scale apartment buildings have been providing housing in many Toronto neighbourhoods for generations. By expanding permissions for this type of housing across the city, additional housing can be developed to expand the range of ground-related/low-rise housing options to support those who cannot afford a detached or semi-detached home, but who will contribute to the stability of neighbourhoods and benefit from the access to these stable environments in support of families and young Torontonians that want to set down roots across the city.

 

Permitting a broader variety of building types along major streets is generally consistent with the Official Plan. The Official Plan recognizes that major streets provide opportunities for additional density along the boundaries of the neighbourhoods. Providing land use permissions for townhouses and small-scale apartment buildings will provide a degree of height and density transition from growth areas to the interior of the Neighbourhoods. This initiative is one component of Toronto's 2022 - 2026 Housing Action Plan, which seeks to increase the supply of housing within complete, inclusive, and sustainable communities with critical infrastructure to support growth. It is in keeping with the recently adopted new Chapter 1 to the Official Plan vision to eliminate disparities, prioritize climate action, and to become the world’s most inclusive city.

 

To remove barriers and enable the creation of Neighbourhoods related housing, this report proposes an Official Plan Amendment (OPA) to permit townhouses and small-scale apartment buildings along the major streets in Neighbourhoods areas across the city. A Zoning By-law Amendment is also recommended to implement these permissions as-of-right in all residential zones across Toronto, and to implement appropriate performance standards. As part of the Zoning By-law Amendment, changes are recommended to enhance existing regulations requiring confirmation of adequate water and wastewater servicing for those applications with more than 10 dwelling units.

 

The recommended amendments will maintain a neighbourhood scale and align moderate density with transportation corridors and transit routes. With as-of-right zoning permissions, this type of housing can be delivered relatively quickly as owners will only be required to obtain a building permit (and Site Plan Approval, when applicable) rather than official plan or zoning by-law approvals. Once enabled, it will remain the choice of the individual property owner whether to exercise these permissions.

 

The addition of townhouse and small-scale apartment buildings along the edges of Neighbourhoods throughout the city, will provide more diversity of housing, and support neighbourhood facilities and access to amenities. New residents in Toronto’s neighbourhoods can help stabilize declining populations, make better use of existing infrastructure, and support local retail establishments and services.

 

These additional built form permissions introduce housing forms that are already present in many parts of the city into neighbourhoods that have historically been zoned to restrict housing types, helping the city distribute growth more evenly and to accommodate the needs of Toronto's diverse population.

Date
2024-05-23 17:23 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
21-3
Status
Carried
Date
2024-05-23 17:21 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Date
2024-05-23 17:19 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
22-2
Status
Carried
May 23, 2024
2024.MM18.20

Request for Review of Governance and Operations for Moss Park Arena

  • The meeting focused on Moss Park Arena, established in 1974 at 140 Sherbourne St., Toronto Centre.
  • The Arena is vital for community infrastructure and recreational activities.
  • There is a need for better alignment between the Arena's operations and City priorities.
  • The goal is to ensure equitable access to indoor ice sports for all community members.
  • Concerns were raised about the lack of free programming and drop-in opportunities for residents.

Decisions and Recommendations

  • City Council directed the City Manager to assess the transition of Moss Park Arena from a Board of Management to a City-operated facility.
  • The assessment will include financial impacts, program considerations, and staff planning.
  • A report on the assessment and implementation is to be presented at the Executive Committee meeting on June 18, 2024.
AI Generated
Date
2024-05-23 14:45 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
21-3
Status
Carried
Date
2024-05-23 14:44 PM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
18-6
Status
Carried
May 23, 2024
2024.MM18.19

Strengthening Our Cultural Event Investment Throughout the City

  • The meeting focused on Toronto's growth and development.
  • There is a need for equitable investment in economic and cultural initiatives outside the downtown area.
  • The aim is to create vibrant communities in Urban Growth Centres, avoiding "sleeper communities."
  • New neighborhoods lack established cultural programs like parades and festivals.

Decisions and Recommendations

  • City Council adopted a motion to gather information on City-funded cultural events across Toronto.
  • Councillors Cheng and McKelvie recommended a report on the distribution of these events.
  • The report will include a plan to enhance investment in areas outside the downtown core, particularly in Urban Growth Centres.
  • This initiative is part of the Action Plan for Toronto’s Culture Sector.
AI Generated
Date
2024-05-23 14:42 PM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
18-6
Status
Carried
May 23, 2024
2024.MM18.18

Equitable Funding and Distribution for Canada Day Events in All Community Council Areas for 2025

  • The meeting addressed the history of Canada Day events in North York.
  • Economic Development and Culture has organized these events for over 20 years.
  • Funding was cut in 2018, but events continued in 2019, 2022, and 2023 through other funding sources.
  • In 2024, City-run Canada Day events will occur in 12 of 25 wards, with unequal funding distribution.
  • North York will receive no City funds for Canada Day celebrations in 2024.

Decisions and Recommendations

  • Councillor Lily Cheng, supported by Councillor Jennifer McKelvie, proposed a motion.
  • City Council directed the General Managers of Parks, Forestry and Recreation and Economic Development and Culture to prepare a report.
  • The report should suggest equitable funding and distribution of Canada Day events across all four Community Council areas by the fourth quarter of 2024.
  • The funding plan should also consider Urban Growth Centres outside the downtown core.
AI Generated
Date
2024-05-23 14:40 PM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
18-6
Status
Carried
May 23, 2024
2024.MM18.17

The Future of Visitor Parking

  • The City Council meeting addressed issues related to visitor parking in new developments.
  • There is a growing concern about minimal visitor parking in suburban areas, leading to potential challenges.
  • Limited visitor parking can contribute to social isolation and parking issues in surrounding communities.
  • A specific case involved a proposed 44-storey tower in Willowdale with inadequate visitor parking spots.

Decisions and Recommendations

  • Councillor Lily Cheng, supported by Councillor Jennifer McKelvie, recommended that:
    1. The Interim Chief Planner and Executive Director of City Planning should assess the need for more visitor parking in suburban areas compared to downtown.
    2. The assessment should include the potential impact of Bill 185 and be reported back by the fourth quarter of 2024.
  • City Council referred Motion MM18.17 to the Planning and Housing Committee for further consideration.
AI Generated
Date
2024-05-23 14:39 PM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
15-9
Status
Lost
May 23, 2024
2024.IE13.9

1000 Mural Graffiti Removal Blitz

Over the last year, there has been a marked increase in graffiti tagging throughout the City including hateful messages, on both City property and private property, in part resulting from the global conflicts such as in the Middle East.

 

Combating graffiti is an ongoing challenge that requires a combination of public awareness and graffiti removal by the City and private property owners. One cost-effective and attractive City building method of addressing graffiti is encouraging murals on private buildings and on City property as murals are seldom tagged with graffiti.

 

Whether it is litter, garbage, or property in disrepair, there is a need to remind residents that if care is taken through daily upkeep and regular cleanup, it encourages pride of place and a greater appreciation of keeping the City safe and clean as espoused in the “broken windows theory” which proposes that a safer and more beautiful City results when we collectively take care of the daily surroundings in our communities.

Date
2024-05-23 12:16 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
22-0
Status
Carried
May 23, 2024
2024.IE13.1

A Micromobility Strategy for Toronto

Micromobility is a term for small, low speed, light weight vehicles - including bicycles, cargo bikes / trikes, folding bikes, electric two / three / four-wheeled cycles, electric kick-scooters (e-scooters), e-mopeds, and electric mini-cars. Their use / ownership may be personal / private, shared / rental, or commercial / corporate (e.g. for deliveries). In July 2023, Council requested a strategy to address growing micromobility usage and its safe operation within the city. Council also requested that staff recommend whether to opt in to additional pilot projects under the Ontario Highway Traffic Act. To inform this report, Transportation Services staff reviewed other jurisdictions and conducted extensive public engagement, and consulted internally with over 20 City Divisions, agencies, boards and commissions.

 

This report outlines key policy goals for the strategy and the criteria against which new micromobility opportunities are assessed: these are safety, mobility, the environment, equity and inclusion, health and public health, economic vitality, costs and liability. Staff previously recommended, and Council adopted, participation in two Ontario Highway Traffic Act pilot projects: 1) cargo power-assisted bicycles (2021) that are widely applicable for family use / commuters and for parcel deliveries by companies (such as Fed Ex and Purolator) and 2) large quadricycles (2022). In 2021, based on staff recommendation, Council declined opting in to the e-scooter pilot. This report assesses the opportunities for the low-speed vehicles pilot, and again for e-scooters. Applying the criteria, staff recommend opting in to pilot low-speed vehicles and continuing to decline to opt in to the e-scooter pilot. Any potential benefits of an e-scooter pilot appear to be outweighed by negative impacts on injuries to riders and non-riders, costs and liability to the City, and mode shift (mostly replacing walking and public transit).

 

The proposed strategy emphasizes the need for a holistic approach to ensuring micromobility safety, including the importance of safe infrastructure, its design and maintenance. Public engagement and collaboration with external and internal partners will also be key to address micromobility safety and food delivery industry issues, such as safe riding and battery fire prevention. Licensing micromobility is not recommended as the City does not have the powers under the City of Toronto Act, 2006 to license couriers, as well as several other reasons including jurisdiction, cost, ineffectiveness and impacts on environmental and equity goals. Key next steps are a concerted public education campaign on the rules for micromobility in Toronto; and involvement of federal and provincial governments in supporting micromobility.

Date
2024-05-23 11:36 AM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
22-0
Status
Carried
Date
2024-05-23 11:35 AM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
21-1
Status
Carried
Date
2024-05-23 11:33 AM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
19-3
Status
Carried
May 23, 2024
2024.NY13.3

824 Sheppard Avenue West, 177, 179 and 181 Cocksfield Avenue - Zoning Amendment and Rental Housing Demolition and Conversion Application - Decision Report - Approval

This application proposes to amend the Zoning By-law to change the deployment of the approved density for a 12-storey (44.95 metre inclusive of mechanical) mixed use building, with minor changes to the height and setbacks. The Zoning By-law amendment also proposes to remove the 'rental' tenure term and provides more details with regards to the unit mix of the 15 rental replacement units from Schedule A of By-law 320-2022, which was part of the approval of the Rental Housing application (20 205924 NNY 06 RH).  The existing Holding provision will be retained. The resulting overall gross floor area is 20,268 square metres including 328 residential units and 445 square metres of non-residential space.

 

The proposed development is consistent with the Provincial Policy Statement (2020) and conforms with A Place to Grow: Growth Plan for the Greater Golden Horseshoe (2020).  

 

The zoning by-law amendment conforms with the Sheppard West / Dublin Secondary Plan to encourage a diversity of office, commercial, institutional and residential uses along Sheppard Avenue West while protecting the adjacent lower-density residential area.  The proposed development is consistent with the Provincial Policy Statement (2020) and conforms with A Place to Grow: Growth Plan for the Greater Golden Horseshoe (2020). The proposed development also conforms to the City's Official Plan and the Site and Area Specific Policy 22.  It is also generally consistent with the original approved Official Plan Amendment and Zoning By-law Amendment approved by Council in 2022 maintaining a 12-storey building that provides vehicle access off of Sheppard Avenue West.  The original Section 37 contribution remains the same.

 

This report reviews and recommends approval of the application to amend the Zoning By-law.

Date
2024-05-23 09:51 AM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
13-3
Status
Carried
May 22, 2024
2024.EC12.4

2024 Local Arts Service Organization (LASO) Grant Allocation

Local Arts Service Organizations (LASOs) are independent, not-for-profit, community arts organizations that deliver customized and responsive arts and culture programs, events and services at a local level in outside-the-core neighbourhoods across the city. There are six Local Arts Service Organizations and they advance Economic Development and Culture (EDC)'s divisional strategic direction of promoting cultural vibrancy, offering low-barrier, free and low-cost arts participation opportunities to communities across the city. The Local Arts Service Organizations also provide critical support and capacity-building opportunities to local artists and arts organizations.

 

Through EDC, the City of Toronto, provides financial support to the six Local Arts Service Organizations, subject to annual contribution agreements. The 2024 Operating Budget for Economic Development and Culture includes a total of $1,817,494 to fund the six Local Arts Service Organizations: Arts Etobicoke, East End Arts, Lakeshore Arts, North York Arts, Scarborough Arts and UrbanArts. The Local Arts Service Organizations received an additional $80,000 inflationary increase through the budget process, bringing the 2024 budget to $1,897,494.

 

In accordance with Council direction, the purpose of this report is to provide the recommended funding allocation for the Local Arts Service Organizations for 2024. This funding recommendation is based on the Local Arts Service Organizations' 2023 financial and performance reports, reviewed by Economic Development and Culture staff, and is aligned with the City's Community Grant Policy and Economic Development and Culture's grant reform efforts to make Economic Development and Culture's grant process more equitable, inclusive and transparent.

 

Funding to the Local Arts Service Organizations is a critical component of the City's support for arts and culture in communities outside of the core. Local Arts Service Organizations play a key role in providing essential arts services, working to meet identified community needs and deliver programs to serve artists, children and youth, seniors, newcomers, 2SLGBTQIA+, Indigenous, Black, Persons of Colour and equity-deserving community members.

Date
2024-05-22 19:46 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
11-7
Status
Carried
May 22, 2024
2024.EC12.2

Downsview Community Development Plan

The Downsview lands present a unique opportunity for the public and private sector to collaborate closely with community partners to build Canada’s largest development project. Over 30+ years and at full build-out, it is estimated that the Downsview Secondary Plan Area will accommodate approximately 115,000 new residents (63,000 units) and 52,000 workers, representing one of the largest city-building efforts in the history of Toronto. This is a transformative opportunity to stitch existing and new communities together, enabling the development of more resilient, equitable and connected communities.  As an outcome of the Update Downsview Study, a comprehensive planning framework for the Downsview Area will be brought forward for Council approval. The Update Downsview Study deliverables include:

  • Downsview Secondary Plan;
  • Downsview Community Development Plan;
  • Downsview Urban Design Guidelines;
  • Zoning By-law for Meanwhile Uses; and
  • Master Environmental Servicing Plan.

With the exception of the Community Development Plan, the Study deliverables are proceeding through Planning and Housing Committee during the same Council cycle as the Community Development Plan.

 

Growing evidence suggests that without focused investments in reconciliation, equity and systems-wide strategies and supports, neighbourhoods undergoing intensified development and new investments may undermine broader City commitments to promoting a more just and equitable Toronto. For new investments to positively impact current and future Downsview residents, workers and visitors, holistic supports and policy frameworks must be put in place that reflect the rich engagement with various groups, such as First Nations Rights Holders with rights in Canada under s. 35 of the Constitution (“First Nations Rights Holders”), residents, grassroots groups, not-for-profit organizations, artists, and businesses who may be potentially impacted and/or demonstrate interest for greater presence in the Downsview area. New policies, programs and partnerships must focus where the need is greatest and address the inequities that shape the lives of residents, with priority given to Indigenous and Black residents and communities of Toronto. Downsview’s Secondary Plan undergoing an update triggered the need for a Community Development Plan to support this focused and targeted approach to investing in reconciliation, equity, and systems-wide change. The authority of the Community Development Plan is derived from the Secondary Plan’s enforcement and City Council’s approval. 

 

The purpose of this report is to present the Downsview Community Development Plan for approval, outlining an outcome-driven action plan that is rooted in collaboration between property owners, City divisions, and the community. This report lays out the implementation of the Community Development Plan.

 

The Downsview Community Development Plan 2024-2029 seizes the opportunity presented by the anticipation of significant growth to centre equity as the basis for Downsview’s redevelopment, reflects in-depth engagement and outlines clear commitments to meet the needs of Indigenous, Black and equity-deserving communities. This process was convened by Social Development, Finance and Administration and Economic Development and Culture in close partnership with City Planning. This has been a unique process and can serve as a model for future Community Development Plans. The Community Development Plan is a 30+ year plan that will be renewed every five years with the first iteration beginning in 2024 and ending in 2029.  The Downsview Community Development Plan accompanies the Downsview Secondary Plan, with both aiming to ensure that future residents, visitors, and workers as well as community groups, not-for-profit organizations and businesses are supported as the area is developed over time. To this end, the Downsview Community Development Plan sets out a 5-year implementation plan, as well as direction for the next 30+ years through an Action Plan (subject to future updates).  

 

While the Downsview Secondary Plan, Zoning By-law for Meanwhile Uses, and Urban Design Guidelines will provide direction for interim and future development, the Community Development Plan is focused on Indigenous and Black place-keeping and establishing communities that serve and benefit Indigenous, Black, and equity-deserving communities. Actions to support existing and future Downsview communities under these priorities will continue to evolve through ongoing partnerships and discussions between multiple parties including the City of Toronto, property owners, the local Community Resource Group, First Nations Rights Holders and Indigenous communities, Black communities, and other equity-deserving groups, including residents, artists, community groups, not-for-profit organizations, foundations, as well as, business interest associations, and other private sector partners.  

 

The focus and content of the Community Development Plan are the result of a 2-year community engagement process led by the City through the Update Downsview Study and intensive collaboration between participating City Divisions and Agencies (including CreateTO), and property owners with active development applications (i.e. Northcrest Developments, Canada Lands Company). The Community Development Plan engagement built upon the comprehensive “id8 Downsview” engagement process undertaken by Northcrest Developments and Canada Lands Company in the three years prior to the Update Downsview Study to inform and raise awareness about their Official Plan Amendment Application. Through the engagement process, the Downsview Community Development Plan has identified the following eight priority areas:  

  • Access to Housing
  • Access to Healthy and Affordable Food
  • Arts, Heritage and Education
  • Access to Recreation and Community Spaces
  • Access to Employment Opportunities
  • Establishing an Inclusive Economy
  • Community Safety, Health, and Wellbeing
  • Environment and Climate 

The Community Development Plan will advance actions across the eight priority areas. The actions will be guided by principles that reflect the City of Toronto's commitments to Indigenous, Black, and equity-deserving groups through the City's Reconciliation Action Plan, Action Plan to Confront Anti-Black Racism and broader equity-driven strategies, initiatives, and programs. In so doing, it is an important demonstration of the City’s approach to inclusive economic development. 

 

In the process of developing the Downsview Community Development Plan, the City has established a strong interdivisional collaboration and community partnership approach that will serve as a strong foundation to support successful implementation. The lessons learned through the engagement and development process and through interdivisional collaboration will continue to inform ongoing monitoring and implementation.

Date
2024-05-22 17:57 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
24-0
Status
Carried
May 22, 2024
2024.PH12.1

Update Downsview: Secondary Plan, Zoning By-law, Urban Design Guidelines and Master Environmental Servicing Plan - Final Report

This report provides the recommended comprehensive planning framework for the Downsview area over the next 30 years to guide development of resilient, sustainable and equitable complete communities. Included in this report are four recommended deliverables:

 

· Downsview Secondary Plan (“Plan”);

· Zoning By-law for Meanwhile Uses (“Meanwhile ZBL”);

· Downsview Urban Design Guidelines (“UDGs”); and

· Master Environmental Servicing Plan (“MESP”).

 

A fifth deliverable, the Downsview Community Development Plan (“CDP”), is proceeding through the Economic and Community Development Committee in the same Council cycle.

 

Over an anticipated 30 year build-out, the Downsview Secondary Plan Area (“Plan Area”) will accommodate approximately 115,000 new residents (63,000 units) and 52,000 workers, representing one of the largest city-building efforts in the history of Toronto. The Secondary Plan facilitates a significant amount of new housing – including affordable housing – that contributes to achieving the City’s housing targets, as well as employment growth that contributes to the local and regional economy. This is a transformative opportunity to leverage the area’s important past and to connect existing and new communities in accordance with two overarching goals: climate resilience and environmental sustainability, and achieving equitable outcomes for Indigenous, Black and equity-deserving groups. All deliverables align with these goals to provide an integrated approach for future private and public investment.

 

The recommended deliverables are the outcome of the Update Downsview Study ("Study"), initiated by the City in September 2021 following City Council's approval of Site and Area Specific Policy ("SASP") 596 in February 2021. The Study was informed by a comprehensive engagement program, interdivisional and inter-agency working groups, concurrent review of aligned initiatives, and analysis and preparation of a number of studies informed by the provincial policy and legislative context as well as the City’s Official Plan.

 

Staff have reported twice to City Council on the Study, most recently in May of 2023 with updates on the draft deliverables. This report brings forward the final recommended deliverables, and describes the implementation process and next steps, including District Plans and associated development applications, CDP implementation, further studies required to advance major infrastructure projects, and activating permissions for the lands in the years before future development proceeds.

Date
2024-05-22 17:56 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
24-0
Status
Carried
May 22, 2024
2024.EX14.6

City of Toronto's 2024 Corporate Asset Management Plan

The City of Toronto is the largest municipality in Canada and the economic engine of the province and country. With this comes an important national responsibility and opportunity to deliver services, execute projects, and uphold strategic priorities that will benefit the region and other orders of government and contribute to Canada’s overall economic health, social standing, and environmental sustainability.    

 

Like many North American cities, the majority of the City of Toronto’s infrastructure was built during the post-war period and the onset of the industrial period. The European experience – with much older infrastructure – tells us that, over time, cities will need to allocate an increasing part of their budgets to ensure that basic infrastructures continue to be in a state of good repair (SOGR) to serve their constituents. In addition, the far-reaching implications of climate change present new challenges to building sustainable and innovative adaptations that rely upon green, renewable, and adaptive technologies.

 

The 2019 Canadian Infrastructure Report Card (CIRC) highlights that a concerning amount of Canadian municipal infrastructure is in poor and very poor condition, requiring immediate rehabilitations and replacements in the next 5-10 years to maintain service levels that meet community expectations. For the City of Toronto specifically, more than 50% of its 2024-2033 Tax and Rate Supported Capital Budget and Plan is dedicated to capital investments in SOGR projects to simply maintain the current state of infrastructure over the next 10 years. In this context, it is extremely important to have high quality and comparable data across the organization for senior leadership to plan and prioritize renewal projects based on the evidence, implement best practices for cost savings, and leverage funding opportunities from provincial and federal governments.

 

This report presents the City of Toronto’s 2024 Corporate Asset Management Plan for City Council's approval, in accordance with Ontario Regulation 588/17: Asset Management Planning for Municipal Infrastructure (the "Regulation") under the Infrastructure for Jobs and Prosperity Act. The regulation was subsequently amended in March of 2021 under Ontario Regulation 193/21 to change the timing of reporting requirements under the Act. The report will address all other municipal infrastructure assets outside of the core assets reported through the Core Infrastructure Asset Management Plan approved by Council in November 2021 which included water, wastewater, stormwater, roads, bridges, and culverts. The infrastructure assets contained in this report are categorized into 9 asset classes: facilities, fleet, equipment, amenities, collections, linear infrastructure, natural assets, structures and systems.

 

The 2024 Corporate Asset Management Plan (AMP) encompasses 25 City Divisions, Agencies, and Corporations (DACs) that hold ownership and/or responsibility over City-owned municipal infrastructure assets, as defined by the regulation. Organized into 8 service areas and 24 subservices, the Corporate AMP exhibits the multitude of services provided by the City and demonstrates the relationship between service delivery and the assets that support those services. The AMP is based on the data, information, professional judgement, and expertise of the asset management teams and leads that reside within each area, in conjunction with the work and analysis conducted through the City’s annual Budget process and reflected in the 2024 Operating Budget and 2024-2033 Capital Budget and Plan.

Date
2024-05-22 17:36 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
24-0
Status
Carried
May 22, 2024
2024.PH12.7

City Comments on Proposed Bill 185 - Cutting Red Tape to Build More Homes Act, 2024, Provincial Planning Statement 2024, and New Minister Zoning Order Framework

On April 10, 2024, the Ministry of Municipal Affairs and Housing introduced Bill 185 – Cutting Red Tape to Build More Homes Act. The proposed Bill affects 17 acts, including the City of Toronto Act, Planning Act, Development Charges Act and others. Bill 185 has reached second reading and was referred to the Province’s Standing Committee on Finance and Economic Affairs. On April 10th, the Province also released a revised Provincial Planning Statement, 2024 (the "Planning Statement") and a new Minister Zoning Order (MZO) framework. The Planning Statement, which if adopted, will replace the existing Provincial Policy Statement, 2020 (the “PPS”) and include some policies from A Place to Grow: Growth Plan for the Greater Golden Horseshoe (the “Growth Plan”). The Growth Plan is proposed to be repealed.

 

The Province's 30-day commenting period on the proposed Bill 185, the revised Planning Statement and the new MZO framework closes on May 10, 2024.

 

Multiple divisions are reviewing Bill 185, the revised Planning Statement and new MZO framework. Staff will provide a supplementary report containing analysis and recommendations on the proposed legislative and policy changes. This report will be made available prior to the Planning and Growth Management Committee Meeting scheduled for May 9, 2024.

Date
2024-05-22 17:35 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
24-0
Status
Carried
Date
2024-05-22 17:34 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
9-14
Status
Lost
Date
2024-05-22 17:33 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
5-18
Status
Lost
May 22, 2024
2024.PH12.8

Request a Review of Zoning Regulations to Restrict Outdoor Parking of Commercially Licensed Vehicles on Private Property in Residential Areas

Recently, constituents in Etobicoke North have raised the issue of commercial vehicles parking in residential driveways. The City-wide zoning by-law 569-2013 prohibits approximately ten types of vehicles from parking on private residential properties. These prohibitions include vehicles with more than six wheels, large industrial vehicles, or commercially licensed vehicles to name a few.

 

City Council adopted MM43.12 in May 2022 which directed the Chief Planner and Executive Director, City Planning in consultation with the Executive Director, Municipal Licensing and Standards to conduct a review of zoning regulations that restrict outdoor parking of commercially licensed vehicles on private property in residential areas. Through this motion, a report back to Planning and Housing was requested along with the consideration to provide more convenient parking for commercial vehicles near their residence.

 

However, the City’s strategic priorities in addressing the housing crisis has put this matter on the back burner. Given the changing workplace environment because of COVID, a thorough review of this policy must be done to support and understand the diverse needs of Torontonians. Individuals and their families provide for their households and sustain their livelihoods in various ways. It is crucial to ensure our policies effectively capture these various means of contributing to the economy and align them with our policies.

 

After meeting with City staff, I am recommending that this item be brought back to the table and made a priority. Building on the existing adopted recommendations, I would also like to request that COVID’s impacts on working arrangements be considered in this review. The modality of working remote or hybrid has become the norm after the pandemic which has impacted the number of parking spaces at commercial buildings and has shifted some service providers’ model of operations to a “on call” basis. Given the City-wide implications of this zoning by-law, this matter is urgent to address and must be assessed through an adaptive lens.

Date
2024-05-22 14:47 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
21-3
Status
Carried
May 22, 2024
2024.EX14.11

Report Back Regarding Item GG8.20 and Revisions to the Fair Wage Policy and Updating the Fair Wage Schedule to Include 2022-2024 Wage Rates

This report provides additional information regarding item GG8.20 from the General Government Committee’s meeting on December 6, 2023. Specifically, it provides an updated financial analysis on proposed changes to Toronto Municipal Code Chapter 67, Fair Wage, and how the proposed changes will clarify how the by-law applies to small businesses.

 

This report is being submitted to the Executive Committee following its April 9, 2024 decision to refer all matters related to the City's Fair Wage Policy from the General Government Committee to the Executive Committee, for consideration.

 

At the December 2023 General Government Committee meeting, the Manager, Fair Wage Office, Purchasing and Materials Management Division submitted a report on Item GG8.20 dated November 22, 2023 (the “November Report”). The November Report recommended revisions to Chapter 67, Fair Wage (the "By-Law"), and all three of the By-Law's schedules: Schedule A, Fair Wage Policy (the “Policy”); Schedule B, Labour Trades Contractual Obligations in the Construction Industry (the "Labour Trades"); and Schedule C, Fair Wage Schedule, 2016-2019 ("Schedule C"). This report proposes no additional changes.

 

Under the By-Law the Manager, Fair Wage Office is delegated authority to update the wage rates in Schedule C every three years, consistent with prevailing market rates in the construction industry. The proposed updated Schedule C reflects wage increases recognized by the construction labour markets. The November Report recommended that the updated Schedule C wage rates take effect for all new City procurements issued on or after January 1, 2024. The new proposed effective date is July 1, 2024.

 

Proposed changes to the By-Law and Policy include adding definitions and clarifying Policy application provisions regarding "Owner Operators" and grant agreements. The proposed changes regarding the Fair Wage Policy not applying to “Owner Operators” would not change how Chapter 67 currently applies to small businesses. The changes further provide clarity as to how the Fair Wage Policy is interpreted regarding grant agreements.

Date
2024-05-22 14:41 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
May 22, 2024
2024.IA18.1

Yonge-Dundas Square Renaming Initiative

  • The City Council meeting took place on May 22 and 23, 2024.
  • Councillor Stephen Holyday from Ward 2, Etobicoke Centre, submitted an Administrative Inquiry.
  • The inquiry is related to the renaming of Yonge-Dundas Square to Sankofa Square, as directed by a previous council decision.
  • The decision was made to address the legacy of the Transatlantic Slave Trade.

Decisions and Recommendations

  • The Administrative Inquiry IA18.1 was referred to the Executive Committee for further consideration.
  • The inquiry seeks answers regarding the adoption status of the new name, signage design, fabrication, installation, costs, and funding sources.
  • The inquiry also requests a timeline for the installation of the new signage.
AI Generated
Date
2024-05-22 14:17 PM
Motion
Refer Item
Vote
Yes
Decision body
City Council
Total
11-10
Status
Carried
May 7, 2024
2024.PB18.7

123 Wynford Drive - Refusal of Application for Alterations to the Attributes and Demolition of a Building and Heritage Attributes on a Designated Heritage Property Under Part IV, Sections 33 and 34 of the Ontario Heritage Act

  • The City Council meeting focused on a heritage property at 123 Wynford Drive.
  • Originally the Japanese Canadian Cultural Centre, it is significant for its cultural and architectural value.
  • The property is designated under the Ontario Heritage Act due to its historical importance.
  • A development proposal for two residential towers prompted the discussion on altering the property's heritage attributes.

Decisions and Recommendations

  • City Council will refuse the application to demolish and alter the heritage property at 123 Wynford Drive.
  • The refusal is based on the Heritage Impact Assessment and other architectural documents.
  • If appealed, the City Solicitor and staff are authorized to oppose the appeal at the Ontario Land Tribunal.
  • Council will also request a report on supporting the nomination of the property as a UNESCO World Heritage Site.
AI Generated
Date
2024-05-07
Motion
Adopt Item as Amended
Vote
Absent
Decision body
Toronto Preservation Board
Total
8-0
Status
Carried
Apr 18, 2024
2024.TE12.5

171-175 Lowther Avenue - Official Plan and Zoning By-law Amendment Application - Decision Report - Approval

This report reviews and recommends approval of the application to amend the Official Plan and Zoning By-law to re-designate the lands from Neighbourhoods to Apartment Neighbourhoods, and to permit an 11-storey (39.5 metres excluding mechanical penthouse) residential building with 64 dwelling units. The application also proposes to demolish three rental dwelling units located in the 3-storey designated heritage building at 171 Lowther Avenue, which is proposed to be partially conserved and integrated within the new development.

Date
2024-04-18 20:34 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
18-1
Status
Carried
Date
2024-04-18 20:33 PM
Motion
Amend Item
Vote
No
Decision body
City Council
Total
4-15
Status
Lost
Apr 18, 2024
2024.MM17.25

30 Lakeside Avenue - Request for City Solicitor to Attend at the Toronto Local Appeal Body

  • The City Council meeting took place on April 17 and 18, 2024.
  • The Committee of Adjustment had previously refused an application for variances to demolish and rebuild a dwelling at 30 Lakeside Avenue.
  • The owner appealed this refusal to the Toronto Local Appeal Body (TLAB), with a hearing set for July 16, 2024.
  • Concerns about the application included location, size, safety, and functionality.
  • An urgent motion was presented due to the approaching deadline for the Notice of Intention to be a Party.

Decisions and Recommendations

  • City Council authorized the City Solicitor to attend the TLAB hearing to support the refusal of the application.
  • The City Solicitor was also authorized to hire outside consultants as needed.
  • The City Solicitor was given permission to negotiate a resolution regarding the application and to act on behalf of the City, after consulting with relevant parties.
AI Generated
Date
2024-04-18 19:51 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
17-1
Status
Carried
Apr 18, 2024
2024.PH11.10

Response to Including New Approval Conditions for Rental Demolition Applications

This report responds to City Council’s request for the Chief Planner and Executive Director, City Planning and City Solicitor to review components of the City’s implementation approach and approval conditions for Rental Housing Demolition applications submitted under Chapter 667 of the Toronto Municipal Code (“Chapter 667”).

 

The report addresses the following rental replacement implementation matters:

  • Requiring additional purpose-built market rent units as a condition of approval for Rental Housing Demolition applications;

  • Feasibility of using secondary market (i.e., condominium) rental data to inform how financial compensation is calculated as part of Tenant Relocation and Assistance Plans for eligible tenants; and

  • Providing income-eligible post-application tenants the option to rent available replacement affordable rental units prior to eligible individuals who are on the Centralized Affordable Rental Housing Access System.

Staff are not recommending changes in response to the above implementation matters as such changes could unintentionally negatively impact the City’s existing rental replacement policy framework. The report identifies recent process improvements, such as indexing rental market data, to ensure compensation provided under the Tenant Relocation and Assistance Plan better reflects current market data. Staff will also be publishing updated implementation practices for Rental Housing Demolition applications that will provide for a plain language resource for members of the public and the development industry to reference.

 

Legal Services and the Housing Secretariat were consulted in the development of this report.

Date
2024-04-18 19:25 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
21-0
Status
Carried
Date
2024-04-18 19:24 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
20-1
Status
Carried
Date
2024-04-18 19:22 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
18-1
Status
Carried
Apr 18, 2024
2024.EC11.3

Large Multi-Passenger Pedalled Vehicles (Quadricycles) Pilot

In 2022, City Council adopted recommendations to opt-in to a Province of Ontario pilot project under the Highway Traffic Act, which allowed the operation of large quadricycles in Toronto under specific conditions. Among the conditions approved by City Council were the requirements that large quadricycle operators must have a valid pedicab licence, and that all routes must be approved by the General Manager, Transportation Services prior to commencing operations. Since 2022, a single company has operated a tour service using large quadricycles on a seasonal basis (May to October). The two operating seasons in 2022 and 2023 have provided valuable learning opportunities for both City staff and large quadricycle operators. This report serves as an update on the Large Quadricycle Pilot Project and provides a summary of feedback from internal and external stakeholders as well as local residents.

 

It is recommended that the City continue to opt-in to the Province of Ontario's Large Quadricycle Pilot Project. This recommendation is based on findings that conclude large quadricycles did not have identifiable impacts on traffic congestion, transit operations, or public safety in the first two years of the pilot. Input received from local businesses confirms that large quadricycle tours present a small but visible economic development opportunity and support tourism. Further, results from a public survey found that the majority of Toronto resident respondents (77 percent) support the continued use of large quadricycles in Toronto.

 

Many of the conditions under which large quadricycles were permitted to operate were key to the success of this pilot project in 2022-2023. Therefore, this report recommends that the same roadway restrictions continue to apply to large quadricycles, in addition to the requirement that operators submit proposed routes for approval prior to commencing operations. In addition to these requirements, staff recommend that the General Manager, Transportation Services, or their designate, be granted the authority to establish new route approval conditions for large quadricycles.

 

Finally, this report recommends that the limit on the number of licences that may be issued to large quadricycles be lifted but that the City prohibit at all times the use of large quadricycles that are not licensed as pedicabs.

Date
2024-04-18 18:52 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
21-1
Status
Carried
Apr 18, 2024
2024.PH11.2

Our Plan Toronto: Official Plan Chapter One - Decision Report - Approval

Chapter One of the Official Plan sets out aspirational and vision-based statements that inform how the city will grow for the next 30 years. These statements reflect the shared values of Torontonians, expressed in a way to guide development, and are the foundation for the other chapters in the Plan. The Official Plan is Toronto’s roadmap for growth and Chapter One is the compass that helps inform our choices. Chapter One seeks to balance the needs of todays residents without compromising the needs of future generations of Torontonians. The current Chapter One was adopted by Council in 2002 as part of the City’s first post-amalgamation Official Plan and similar to other Chapters of the Official Plan requires updating to reflect the changing vision for the city.

 

This report recommends replacing the current Chapter One with a new Chapter One that focuses on advancing reconciliation, a Vision to 2051, and Principles for a successful and inclusive city. The recommended Chapter One will serve as a statement of values that will inform future amendments to the Plan. An emphasis on inclusion, access, and equity will ensure that these values become embedded in future decisions.

 

This report recommends adoption of Official Plan Amendment 718 informed by the engagement program held as part of the Municipal Comprehensive Review and Growth Plan Conformity Exercise, known as “Our Plan Toronto”. The recommended Official Plan Amendment is considered under Planning Act Section 17.

Date
2024-04-18 18:49 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
21-1
Status
Carried
Apr 18, 2024
2024.MM17.8

Re-opening and Amending Item 2023.TE7.91- Altering Turning Restrictions at Old Forest Hill Road and Eglinton Avenue West

  • The City Council meeting addressed traffic issues related to the Eglinton Crosstown Light Rail Transit project.
  • Residents have experienced severe traffic problems, including long delays and safety risks for pedestrians and cyclists.
  • A previous decision (Item 2023.TE7.91) aimed to alleviate some traffic congestion but led to unintended consequences, increasing local traffic chaos.

Decisions and Recommendations

  • City Council amended the previous decision by removing two prohibitions on northbound left turns at Old Forest Hill Road and Eglinton Avenue West.
  • The northbound left turn prohibition from 7:00 a.m. to 9:00 a.m. and 4:00 p.m. to 6:00 p.m. was reinstated.
  • Old Forest Hill Road will be included in a study for monitoring traffic infiltration.
  • Advance warning signage will be installed at the intersection of Old Forest Hill Road and Spadina Road to inform motorists of turn prohibitions.
AI Generated
Date
2024-04-18 18:38 PM
Motion
Adopt Item as Amended
Vote
Absent
Decision body
City Council
Total
14-1
Status
Carried
Apr 18, 2024
2024.EX13.8

2024 Education Property Tax Levy and Clawback Rate By-Law

In accordance with various legislative requirements, City Council must annually adopt the following by-laws associated with property taxes:

 

- the municipal levy;

- the education levy; and

- the claw-back rate for properties in the commercial, industrial and multi-residential property classes.

 

These by-laws are required to enable the City to issue the final property tax bills for the year, for both municipal and school purposes. Following City Council's adoption of the 2024 municipal property tax rates at its meeting, this report now addresses the education levy and the claw-back rate.

 

This report recommends adoption of the 2024 education tax rates and education property tax levy for school purposes, as required by legislation. The City of Toronto levies and collects education taxes on behalf of the Province of Ontario, based on the education tax rates set out in Ontario Regulation 400/98, as amended. The education property tax rates prescribed by the Province for 2024 remain unchanged from the previous year for all classes. Accordingly, the average household will see no increase in their education tax this year.

 

In addition, this report addresses the requirements associated with the clawback rate for properties in the commercial, industrial and multi-residential property classes. In February 2024, City Council adopted the continued policy of limiting ('capping') allowable tax increases to a maximum of 10% of a property's prior year's annualized taxes for properties in those classes with a property tax bill increase greater than $500. This capping policy protects commercial, industrial and multi-residential properties from significant annual tax increases.

 

In order to capture the lost revenue from properties that are capped, the City annually calculates a clawback rate that effectively results in withholding part of a property’s decrease due to reassessment, as applicable. This report recommends the 'clawback percentage', which represents the amount the City will retain from any decreases in property tax bills, to offset the capping policy. This therefore  means that  the tax bill will reflect the  'allowable decrease' percentage applied for the year, which in fact is the portion of the decrease the property will be able to retain.

Date
2024-04-18 18:27 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
21-1
Status
Carried
Date
2024-04-18 18:26 PM
Motion
Amend Item (Additional)
Vote
No
Decision body
City Council
Total
7-15
Status
Lost
Apr 18, 2024
2024.EX13.4

The Somali Centre for Culture and Recreation

At its meeting on February 16, 2024, the Board of Directors of CreateTO considered Item RA9.6 and made recommendations to City Council.

 

 

Summary from the report (February 2, 2024) from the Chief Executive Officer, CreateTO:

 

The Somali Centre for Culture and Recreation ("Somali Centre") is a registered non-profit organization led by a group of Somali Canadian young professionals from across Ontario aiming to create a dedicated cultural recreation and community space for the Somali population in Toronto. According to the organization, there has been a 40-year effort from the Somali community to develop a culture and recreation centre in Toronto to address the needs of this under-served community.

 

Beginning in the 1970s, the community began working with local leaders and politicians to advocate for this type of facility. The main goal of this centre is to create a "…central space for the Somali community to gather and receive culturally appropriate community services from non-profit service providers and agencies." After decades of advocacy, Toronto City Council adopted a motion in July 2022 to direct City of Toronto and CreateTO staff to work with the Somali Centre on a feasibility study to identify potential sites for this facility.

 

This report provides an outline of the collaborative process undertaken by CreateTO, the City of Toronto, and the Somali Centre and provides a staff review of their feasibility study. Next steps will include a continued effort to work together and to understand the operating model and long-term financial feasibility of the Somali Centre.

Date
2024-04-18 18:06 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
22-1
Status
Carried
Date
2024-04-18 18:05 PM
Motion
Amend Item
Vote
No
Decision body
City Council
Total
1-22
Status
Lost
Date
2024-04-18 18:03 PM
Motion
Amend Item
Vote
No
Decision body
City Council
Total
2-21
Status
Lost
Apr 18, 2024
2024.RM17.1

Call to Order

  • The City Council meeting was called to order at 9:41 a.m.
  • The meeting began with the national anthem, "O Canada."
  • A moment of silence was held to remember several individuals, including community leaders and members.
  • Speaker Nunziata acknowledged the Indigenous Peoples of the land, emphasizing the importance of improving relationships and understanding their cultures.
  • The meeting took place on traditional territory that includes various Indigenous nations and is covered by specific treaties.

Decisions and Recommendations

  • Council members were reminded that all agenda materials are available online for public access.
  • The meeting focused on reflecting on the significance of the land and the commitment to Indigenous communities.
  • Acknowledgment of the diverse First Nations, Inuit, and Métis peoples in Toronto was made.
AI Generated
Date
2024-04-18 17:41 PM
Motion
Extend the Meeting
Vote
Yes
Decision body
City Council
Total
15-6
Status
Carried
Date
2024-04-17 17:53 PM
Motion
Extend the Meeting
Vote
Yes
Decision body
City Council
Total
18-6
Status
Carried
Apr 18, 2024
2024.EC11.4

Alcohol in Parks Pilot: Evaluation Findings

In response to City Council direction (2023.EC5.1), this report presents the evaluation findings of the Alcohol in Parks Pilot Program, as implemented from August 2, 2023 to October 9, 2023 in 27 parks.

 

Overall, the Alcohol in Parks Pilot Program was implemented with a high level of satisfaction among park visitors, few issues arising, and minimal operational impacts.

The vast majority (92 percent) of those who visited a pilot park and responded to the experience survey shared that they were satisfied with their visit. Respondents felt safe, and people who chose to drink at the park were considerate.

 

There were minimal increases in service requests to 311 for noise, behaviour or garbage/recycling bins at pilot parks, but not all of these are attributable to the pilot, given other activities taking place in the parks, including special events. Further, there was no increased need for police response at the vast majority of pilot parks, and no increase in hospital emergency department visits due to alcohol, compared to the preceding year (2022).

 

The general public sentiment about alcohol in parks was assessed through a public opinion survey, representative of the Toronto population. The results indicate that 46 percent of respondents were supportive of allowing drinking in parks, 23 percent were neutral and 30 percent were opposed.

 

Given the findings of the pilot evaluation and adhering to the guiding principles approved by City Council for the program, should Council wish to maintain the pilot parks and/or expand the program, this report provides a path forward for Council's consideration, including transitioning all pilot parks to permanent locations, and directing staff to work with local Councillors to expand the number of parks where drinking is permitted to include at least one park in every ward that meets Council-approved public health and safety criteria. If approved, staff will continue to monitor implementation and provide ongoing updates to local Councillors regarding issues arising in parks where alcohol consumption is allowed as well as report back with a status update in the second quarter of 2025. As part of implementation, this report also recommends implementing an administrative process to streamline the addition and removal of park locations where personal alcohol consumption is allowed through amendments to Toronto Municipal Code Chapter 608, Parks.  

 

In the development of this report, Parks, Forestry and Recreation consulted Legal Services, Municipal Licencing and Standards, Toronto Public Health, Solid Waste Management Services, Customer Experience - 311, Toronto Paramedic Services, Toronto Fire Services, and Toronto Police Service.

Date
2024-04-18 17:19 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
20-4
Status
Carried
Date
2024-04-18 17:18 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
10-13
Status
Lost
Date
2024-04-18 17:17 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
22-1
Status
Carried
Apr 18, 2024
2024.PH11.8

RentSafeTO Program Update Report

Toronto Municipal Code Chapter 354, Apartment Buildings outlines maintenance and operational standards for purpose-built rental buildings with three or more storeys and ten or more rental units. These standards are enforced through the City's RentSafeTO: Apartment Building Standards program, which aims to strengthen compliance with City bylaws, enhance tenant engagement and access to information, and promote proactive maintenance in apartment buildings to prevent the deterioration of critical housing stock.

 

At its March 25, 2022 meeting, Planning and Housing Committee adopted 2022.PH32.4 – RentSafeTO Update Report and directed Municipal Licensing and Standards (MLS) to report back on directives pertaining to the program’s fee structure and evaluation tool design, in addition to requests made by Executive Committee (2022.EX30.2) in February 2022.

 

The purpose of this report is to respond to Council direction in order to:

  • Provide an update on critical work completed in 2023 to enhance the RentSafeTO program.
    • This includes the redesign of the building evaluation tool to expand evaluation categories, introduce a reactive scoring scheme to reflect active violations and outstanding property standards orders, establish a new threshold for building audits and update the program’s interactive web map.
  • Highlight the recently published 2023 RentSafeTO Year in Review report.
  • Summarize outcomes of recent budget processes and propose additional fee changes.
    • Through the 2024 budget process, City Council approved changes to the program’s registration and inspection fees.
  • Propose technical amendments to Chapter 354, Apartment Buildings to support enforcement and compliance measures.
  • Respond to outstanding Council directives related to staff resources and jurisdictional research.
Date
2024-04-18 15:06 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
22-0
Status
Carried
Date
2024-04-05
Motion
Amend Item (Additional)
Vote
Yes
Decision body
Planning and Housing Committee
Total
7-0
Status
Carried
Date
2024-04-05
Motion
Adopt Item as Amended
Vote
Yes
Decision body
Planning and Housing Committee
Total
7-0
Status
Carried
Apr 18, 2024
2024.IE12.4

Cycling Network Plan: 2024 Cycling Infrastructure Installation - Second Quarter Update and Missing Sidewalk Program - 2024 Local Road Sidewalk Installations

This report seeks City Council authority to install bikeway projects identified in the Cycling Network Plan as well as Missing Links Sidewalk Projects.

 

Cycling Network Plan Projects

The Cycling Network Plan and the associated Near Term Implementation Plan, adopted by City Council in December 2021, seeks to build on the existing network of cycling routes to Connect gaps in the current network, Grow the network into new parts of the city, and Renew existing parts of the network to improve safety. Through this report, Transportation Services is seeking authority for bikeway projects that were proposed to be installed in the near term (2022-2024) and for which design and consultation have now been completed.

 

This report seeks Council authority to install 5.8 centreline kilometres (km) of new bikeways associated with five projects on the following streets:

 

- Ferrand Drive Area Safety Improvements

- Ferrand Drive: Rochefort Drive (west) to Rochefort Drive (east) and at Eglinton Avenue East (cycle tracks and contra-flow bike lanes, Ward 16)

- Rochefort Drive: Don Mills Road to Deauville Lane (cycle tracks, Ward 16)

- Deauville Lane: Rochefort Drive to St Dennis Drive (cycle tracks, Ward 16)

 

- Galloway Road Sidewalks and Cycling Connections

- Galloway Road: Guildwood Parkway to Dearham Wood (bike lanes, Ward 24)

 

- Portland-Dan Leckie Cycling Connections

- Dan Leckie Way: Queens Quay West to Queens Wharf Road (cycle tracks, Ward 10)

- Portland Street: Queen Street West to Front Street West (cycle tracks, Ward 10)

 

- Silverthorn Cycling Connections

- Silverthorn Avenue: Rogers Road to Lane North St Clair East Cloverdale (contra-flow bike lanes, Ward 9)

- Rockwell Avenue: Silverthorn Avenue (west branch) to Silverthorn Avenue (east branch) (cycle tracks, Ward 9)

- Blackthorn Avenue: Rogers Road to Rockwell Avenue (contra-flow bike lanes, Ward 9)

 

- Weston Cycling Connections

- Pine Street: Wright Avenue to Church Street (bike lanes, Ward 5)

 

Further, this report seeks Council authority to make by-law amendments associated with improvements to 0.5 centreline km of existing bikeways on the following streets:

 

- Richmond Street: Augusta Avenue to Portland Street (uni-directional cycle tracks to bi-directional cycle tracks, Ward 10)

- Jones Avenue: Queen Street to Dundas Street (bicycle lanes to cycle tracks, Ward 14)

 

As part of this report, Transportation Services is continuing to utilize the streamlined reporting process for by-law amendment submissions associated with cycling infrastructure projects approved by Council for implementation. Once projects are approved by Council, the streamlined process involves delegation of authority to submit bills directly to Council for a discreet period of time after project implementation which enables Transportation Services to make minor adjustments to constructed conditions without delay and based on local Councillor and public feedback such as parking adjustments to improve sightlines, adjustments or addition of accessible loading areas, and similar modifications.

 

The changes proposed as part of the projects identified above would improve safety and mobility options by providing improved cycling connections to transit, parks, local schools, businesses, and residences. Pedestrian improvements have also been included in the projects, wherever feasible, including curb extensions, new sidewalk installations, pedestrian head starts and motor vehicle lane adjustments.

 

Finally, this report seeks to make minor housekeeping amendments to existing bikeways and their associated traffic and parking by-laws on the following streets:

 

- Danforth Avenue: Main Street to Victoria Park Avenue (bicycle and traffic and parking, Ward 19)

- Deauville Lane (bicycle and traffic and parking, Ward 16)

- Hibernia Avenue at Laughton Avenue (traffic and parking, Ward 9)

 

An additional report is anticipated for Cycling Network Plan projects in the third quarter of 2024.  

 

Missing Links Sidewalk Projects

The Missing Sidewalk Installation Program seeks to provide safe, comfortable, and accessible sidewalks on all public streets. Transportation Services reviews opportunities to install sidewalks on all roadway classifications through bundling with other state-of-good-repair roadway or utility work, as well as stand-alone delivery, as a fundamental objective of the Vision Zero 2.0 Road Safety Plan.

 

In July 2019, Council requested that sidewalk proposals not otherwise delegated to the

General Manager, Transportation Services, or those requested by a Member of Council, be reported on an annual basis to the Infrastructure and Environment Committee for recommendation to City Council. This report recommends the installation of sidewalks on the following local roads:

 

- Edgebrook Drive from [30 metres West] Bankfield Drive to Bankfield Drive (south side, Ward 1);

- Fishleigh Drive fronting Scarborough Heights Park (south side, Ward 20);

- Mayfield Avenue from Armadale Avenue to Willard Garden Parkette (south side, Ward 4);

- Rannock Street from Craigton Drive to [15 metres East] Rannock Street (north side, Ward 21); and

- Sorauren Avenue fronting 239 Sorauren Avenue (east side, Ward 4).

 

A map of the cycling network and sidewalk projects proposed in this report is included as Attachment 1 and 2, respectively.  

Date
2024-04-18 14:52 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
22-0
Status
Carried
Date
2024-04-18 14:51 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
20-2
Status
Carried
Apr 18, 2024
2024.PH11.13

1111 Danforth Avenue - Notice of Intention to Designate a Property under Part IV, Section 29 of the Ontario Heritage Act

This report recommends that City Council state its intention to designate the property at 1111 Danforth Avenue under Part IV, Section 29 of the Ontario Heritage Act for its cultural heritage value according to the Statement of Significance and description of Heritage Attributes found in Attachment 3.

 

Located on the south side of Danforth Avenue, east of Byron Avenue and west of Greenwood Avenue, the subject property at 1111 Danforth Avenue contains a two-storey buff brick building raised on a basement that was constructed in 1931 in the Neo-Gothic architectural style. The building was reconfigured from an unfinished apartment building to a funeral home when it was purchased by Lorne Willard Trull who engaged architect William Breden Galbraith (1885-1937) to redesign it for the Trull Funeral Home. In operation for over 100 years, the Trull Burial Company is one of the longest operating businesses on Danforth Avenue. The subject property is also associated with architect, William B. Galbraith, a prolific designer of substantial private houses located in the neighbourhoods of Forest Hill, Lawrence Park, Moore Park and Rosedale.

 

The subject property was listed on the Heritage Register in July 2022 as a result of the Danforth Avenue (Segment 2) Cultural Heritage Resource Assessment undertaken by City staff in 2021.

 

Following further research and evaluation, staff have determined that the property at 1111 Danforth Avenue meets Ontario Regulation 9/06, the criteria prescribed for municipal designation under Part IV, Section 29 of the Ontario Heritage Act under design/physical, historical/associative, and contextual vales. A property may be designated under Part IV, Section 29 of the Ontario Heritage Act, if it meets two or more of the nine criteria.
 

The City received a Zoning By-law Amendment Application in February 2022, and a Site Plan Application in March 2022 related to the proposed redevelopment of the subject property which also includes the property at 1095 Danforth Avenue. The City Clerk issued a complete application notice for the Zoning By-law Amendment application on March 15, 2022, and on May 12, 2022, for the Site Plan application. The proposed development would partially retain and integrate the existing listed building at 1111 Danforth Avenue into the new construction of a nine (9)-storey (plus mechanical) mid-rise building with commercial uses at-grade and residential rental units above. The existing building at 1095 Danforth Avenue would be demolished.

 

The City received a Zoning By-law Amendment Application resubmission on January 31, 2023, and a Site Plan Application resubmission On February 1, 2023.

 

A Heritage Impact Assessment (HIA) is required for all development applications that affect listed and designated properties and will be considered when determining how a heritage property is to be conserved. An Heritage Impact Assessment and a Cultural Heritage Evaluation Report (CHER) completed by ERA Architects Inc. dated February 11, 2022, and revised December 9, 2022, were submitted to support the applications.

 

The applicant has provided a waiver with no expiry date to extend the 90-day timeline established under Bill 108 to designate the subject property under Part IV of the Ontario Heritage Act.

Date
2024-04-18 14:45 PM
Motion
Receive Item
Vote
Yes
Decision body
City Council
Total
20-1
Status
Carried
Apr 18, 2024
2024.MM17.9

Portlands Energy Centre: Request for Environmental Assessment

  • The meeting focused on the Portlands Energy Centre, a natural gas electricity generating station.
  • Proposed upgrades aim to increase its capacity by 50 megawatts.
  • The City raised concerns about environmental impacts and lack of responses to its queries in the Screening Report.
  • The facility has been operating more frequently than intended, raising air quality concerns.
  • The City supports energy transition efforts and is exploring alternatives to fossil fuel reliance.

Decisions and Recommendations

  • City Council recommends that the Minister of Environment, Conservation and Parks elevate the capacity expansion proposal to a comprehensive environmental assessment.
  • This decision aligns with previous City Council actions opposing increased fossil fuel generation and promoting renewable energy solutions.
  • The request is urgent, as the comment period ends on April 27, 2024.
AI Generated
Date
2024-04-18 14:34 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Date
2024-04-18 14:33 PM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Apr 18, 2024
2024.CC17.1

Immediate Actions to Address the 2023 Taxation Year of the Vacant Home Tax

  • The City Council meeting addressed confusion and frustration among Torontonians regarding the Vacant Home Tax notices.
  • Many residents, including seniors, received notices without understanding the requirement to declare occupancy.
  • The program, approved in December 2021, has been criticized for its flawed design, causing undue hardship.
  • The goal of the Vacant Home Tax is to increase housing availability and discourage speculation during a housing crisis.

Decisions and Recommendations

  • City Council authorized the waiver of late fees for the 2023 Vacant Home Tax for applicable properties.
  • Residents who have already paid will receive refunds.
  • All residential units without a declaration will be deemed to have the same occupancy status as in 2022.
  • A revised program design for 2024 will be developed, focusing on user-friendly processes and improved communication, especially for seniors and non-English speakers.
  • A formal opinion will be sought on using utility bills to assess occupancy status.
AI Generated
Date
2024-04-18 14:28 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Date
2024-04-18 14:24 PM
Motion
Amend Item
Vote
Absent
Decision body
City Council
Total
5-18
Status
Lost
Apr 17, 2024
2024.IE11.2

Increase in Penalty Amounts for Parking Offences and Establishment of New Electric Vehicle Parking Offences for Off-Street Parking Facilities

 

This report responds to a request from the Infrastructure and Environment Committee to undertake a comprehensive review of the various on-street parking administrative penalty amounts and to report back on revised administrative penalty amounts.

 

Transportation Services has been working with a number of City agencies to review the Parking Violation Notices (PVN) issued by the City of Toronto and has conducted a jurisdictional scan of several Canadian municipalities to compare similar offences and their penalty amounts to those of the City of Toronto. As a result of this review, this report recommends Council approval to increase penalty amounts for 125 offences associated with 'parking', 'stopping' and 'standing'. The recommended increase in penalty amounts will ensure better alignment with penalty amounts in other jurisdictions, encourage compliance, ensure certain offences are set at levels commensurate with the seriousness of the offence, and ensure that offences within the same categories are set at the same penalty amount for consistency.

 

City of Toronto Municipal Code Chapter 610, Penalties, Administration of, will need to be amended to reflect the new penalty amounts.

 

This report also recommends establishing parking offences for electric vehicle charging parking stalls in off-street parking facilities as well as adding new or updating existing definition(s) related to Electric Vehicles ("EVs").

 

Currently, operators of off-street parking facilities, including the Toronto Parking Authority (TPA), have limited enforcement capabilities concerning EV parking due to a lack of offence provisions in the City of Toronto Municipal Code concerning parking in portions of parking facilities set aside for the charging of EVs. This absence of regulatory provisions restricts parking facility operators from ticketing non-EV’s parking in designated EV charging spaces, or ticketing EVs parked in designated EV charging spaces that are not actively charging.

 

The General Manager, Transportation Services, has consulted with the TPA as well as with operators and customers of off-street parking facilities which are regulated by Chapter 915.

 

As a result of the consultation by the General Manager, Transportation Services, and general observations concerning the needs relating to a positive customer experience for EV charging customers, this report is recommending amendments to the City of Toronto Municipal Code Chapter 950, Traffic and Parking, and City of Toronto Municipal Code Chapter 915, Parking on Private or Municipal Property, to introduce new offence provisions related to electric vehicle charging parking. This would allow the enforcement of the usage of off-street EV charging spaces and promote compliance. City of Toronto Municipal Code Chapter 610, Penalties, Administration of, will also need to be amended to reflect the new offence provisions and associated penalty amounts for the offence provisions.

 

Date
2024-04-17 18:38 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
20-1
Status
Carried
Date
2024-04-17 18:33 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
20-1
Status
Carried
Apr 17, 2024
2024.CC17.7

4884-4896 Dundas Street West - Ontario Land Tribunal Hearing - Request for Directions

  • The City received a development application for 4884-4896 Dundas Street West.
  • The original proposal was for a 12-storey building; a revised proposal increased it to 29 storeys.
  • The applicant appealed the City Council's inaction to the Ontario Land Tribunal.
  • A hearing is scheduled for June 17-21, 2024.
  • The on-site heritage resource was designated for protection.
  • Discussions and revisions to the proposal have taken place leading to a settlement offer.

Decisions and Recommendations

  • City Council adopted recommendations from the City Solicitor regarding the settlement offer.
  • The public release of certain confidential instructions was authorized.
  • The City Solicitor will support the settlement at the Ontario Land Tribunal.
  • Specific conditions must be met by the owner before the Tribunal's order is finalized.
  • Further actions will be taken by the City Solicitor to implement these decisions.
AI Generated
Date
2024-04-17 17:38 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Apr 17, 2024
2024.CC17.6

4888 Dundas Street West - Alteration of a Property Designated under Part IV of the Ontario Heritage Act and Authority to Enter into a Heritage Easement Agreement - Request for Directions

  • The City Council meeting took place on April 17 and 18, 2024.
  • It addressed a development proposal for a mixed-use building at 4884-4896 Dundas Street West.
  • The proposal included a heritage building that was to be partially retained and relocated.
  • The applicant had appealed to the Ontario Land Tribunal due to delays in decision-making.

Decisions and Recommendations

  • City Council adopted recommendations from the City Solicitor regarding the heritage application.
  • Council approved alterations to the designated heritage property at 4888 Dundas Street West.
  • A detailed Conservation Plan must be provided before an Ontario Land Tribunal order is issued.
  • A Heritage Easement Agreement with the City is required.
  • Final Site Plan approval must include specific plans for heritage lighting and interpretation.
  • The balance of the confidential report remains confidential, pending further instructions from the City Solicitor.
AI Generated
Date
2024-04-17 17:36 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
24-1
Status
Carried
Apr 17, 2024
2024.IE12.1

Post-Transition of the Blue Box Program to Extended Producer Responsibility and Results of District 2 Service Delivery Options Review

The purpose of this staff report is to provide City Council with an update on the transition of the Blue Box Program to Extended Producer Responsibility, including the City's potential role in the Post -Transition Phase (2026 and beyond).

 

As directed by Council, staff pursued discussions with Circular Materials for Toronto to continue to provide curbside recycling collection post - transition. These discussions ceased in early 2024 due primarily to Circular Materials' requirement for a cost of service to be provided within their required timeframe, which the City was unable to meet due to upcoming procurements. As a result, Circular Materials confirmed they were not open to further discussions or direct negotiations with the City related to Blue Box collection service post - transition.

 

In relation to receipt of recycling post - transition, this report provides an update on the bid the City submitted in response to Circular Materials' Request for Proposals for Receiving Facilities (also known as transfer stations). 

 

Additionally, the report provides an overview of the options analysis undertaken for curbside waste collection in District 2 once the current contract expires in August of 2026 and the recommended path forward. 

Date
2024-04-17 17:33 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
23-3
Status
Carried
Date
2024-04-17 17:32 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
25-1
Status
Carried
Date
2024-04-17 17:31 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
23-3
Status
Carried
Apr 17, 2024
2024.EX13.1

An Overview of Student Nutrition Program

At its meeting on March 4, 2024, the City-School Boards Advisory Committee considered item TS1.5, and made recommendations to Council.

 

 

Summary from the City-School Boards Advisory Committee:

 

Althea Hutchinson, Director of Operations and Business Services, Toronto Public Health will give an overview of Student Nutrition Programs in the City of Toronto.

Date
2024-04-17 12:16 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
25-0
Status
Carried
Apr 17, 2024
2024.EY12.17

Burnhamthorpe Road - Speed Limit Amendment

As the Toronto Transit Commission (TTC) operates a transit service on Burnhamthorpe Road, City Council approval of this report is required.

 

Transportation Services has reviewed the need for a 40 km/h speed limit on Burnhamthorpe Road between Kipling Avenue and Dundas Street West. Based on the assessment undertaken, Transportation Services does not recommend reducing the speed limit from 50 km/h to 40 km/h, as the warrant criteria was not met.

Date
2024-04-17 10:35 AM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
22-2
Status
Carried
Apr 17, 2024
2024.EY12.16

Longbourne Drive - Introduction of Overnight On-Street Permit Parking Area 11

As the Toronto Transit Commission (TTC) operates a transit service on Longbourne Drive, City Council approval of this report is required. 

 

Transportation Services is recommending that overnight on-street permit parking be introduced on Longbourne Drive, between Willowridge Road and Redgrave Drive from 12:01 a.m. to 7:00 a.m., on an area named basis, within newly created Permit Parking Area 11.

 

Residents requested the implementation of overnight on-street permit parking on Longbourne Drive to accommodate their long-term parking needs.

Date
2024-04-17 10:34 AM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Apr 17, 2024
2024.EX13.5

New Island, New Beginnings: Furthering Reconciliation and an Indigenous Cultural Framework for the Port Lands

On March 29, 2023, MM5.3 – Place Names in the Port Lands was adopted by City Council. Since then, City staff have been working with an Indigenous engagement consultant and Elder to design the engagement related to this work. The process, which will include a place naming advisory circle, will result in a recommended Indigenous name for the Island and a list of proposed names for streets and parks, to be considered by City Council in the fall of 2024. A permanent name for the Island will be needed in the early fall as Waterfront Toronto is expected to complete their Port Lands Flood Protection project’s river excavation work. The park and street names will be required by the end of 2024.

 

In addition, this can provide future opportunities for the City to collaborate with Indigenous communities and use their leadership for a number of projects including affordable rental housing and economic development initiatives.

 

The neighbourhoods, parks and public realm that are taking shape in the Port Lands offer a unique moment to support Indigenous cultural revitalization and to integrate Indigenous knowledge systems, oral histories, protocols, and connections to the land into the waterfront revitalization process. This motion requests that staff report on a culturally informed framework that coordinates and communicates the many projects in line with the Reconciliation Action Plan in both the Island and the Port Lands.

Date
2024-04-17 10:26 AM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
23-0
Status
Carried
Apr 5, 2024
2024.PH11.9

Short-Term Rental By-law Implementation Update

Toronto Municipal Code Chapter 547, Licensing and Registration of Short-Term Rentals regulates short-term rental activity by requiring short-term rental operators to be registered and short-term rental companies to be licensed with the City and abide by operational standards and regulatory requirements. The regulations - in conjunction with zoning provisions - permit property owners and tenants who are registered as short-term rental operators to rent their principal residence (i.e. where they ordinarily reside) for a period of less than 28 consecutive days. The primary principles of Chapter 547 are to limit short-term rental activity to principal residences and to protect critical rental housing stock by maintaining access to long-term accommodation for tenants.

 

This report responds to City Council direction to provide an update on the implementation of the City's short-term rental regulations and assess their impact on Toronto's short-term rental market. The report provides an overview of program data and revenues, contextualized by new research conducted by experts from the School of Urban Planning at McGill University, and outlines bylaw interpretation challenges and the City's response to enforcement challenges such as "ghost hotels". It also discusses the medium-term rental market (i.e. rental periods of 28 days or more), emerging activity related to third-party international student housing providers, and the impact of the bylaw's implementation on Toronto's hotel industry.

 

Through this report, Municipal Licensing and Standards is recommending a suite of bylaw amendments that aim to uphold the program's principles, further prevent commercialized short-term rental activity, and address enforcement and bylaw interpretation challenges. Proposed amendments include: i) strengthening the principal residence requirement through improvements to registration standards, ii) amending definitions to clarify the bylaw, iii) enhancing advertising, data sharing and data verification requirements with short-term rental companies, iv) streamlining the process to revoke a short-term rental operator's registration and v) introducing additional measures to curtail rental activity by unregistered operators. In addition, enhancements to administrative, enforcement and compliance resources are proposed through updates to the program's fee structure. This report also proposes that City Council request the Province of Ontario to clarify legislative authority of medium-term rentals and to take action to preserve long-term housing stock by addressing the Provincial Ombudsman's recommendations related to the Landlord and Tenant Board.

 

This report was developed with input from the Housing Secretariat, Technology Services, Revenue Services, City Planning, and Economic Development and Culture divisions.

Date
2024-04-05
Motion
Adopt Item as Amended
Vote
Yes
Decision body
Planning and Housing Committee
Total
6-1
Status
Carried
Date
2024-04-05
Motion
Amend Item
Vote
Yes
Decision body
Planning and Housing Committee
Total
6-1
Status
Carried
Mar 28, 2024
2024.PB16.6

294, 306 and 318 Lawrence Avenue East and 101 Mildenhall Road - Notice of Intention to Designate a Property under Part IV, Section 29 of the Ontario Heritage Act

  • The City Council meeting addressed the cultural heritage designation of specific properties.
  • Properties discussed include 101 Mildenhall Road and 294-318 Lawrence Avenue East.
  • These properties are part of the Toronto French School campus, established in 1962.
  • The meeting included a review of a Cultural Heritage Resource Assessment and previous heritage listings.

Decisions and Recommendations

  • City Council will state its intention to designate 101 Mildenhall Road under the Ontario Heritage Act.
  • City Council will also intend to designate 294 (including structure address at 296), 306, and 318 Lawrence Avenue East.
  • If there are no objections, the City Solicitor will be authorized to introduce a Bill for the designation.
  • The recommendations align with the Statements of Significance attached to the report.
AI Generated
Date
2024-03-28
Motion
Adopt Item
Vote
Absent
Decision body
Toronto Preservation Board
Total
8-0
Status
Carried
Mar 28, 2024
2024.PB16.11

64 Woodlawn Avenue West - Refusal of Repeal of Designating By-law under Section 32 of the Ontario Heritage Act and Proposed Amendment to Designating By-law under Part IV, Section 30.1 of the Ontario Heritage Act

  • The meeting discussed the property at 64 Woodlawn Avenue West, a historic house built in 1906.
  • The City Council previously designated this property under the Ontario Heritage Act.
  • The property owner applied to repeal this designation, claiming it does not merit heritage status.
  • No objections to the repeal were received by the City Clerk within the specified period.
  • City staff believe the property has cultural heritage value and meets multiple criteria for designation.

Decisions and Recommendations

  • City Council will refuse the application to repeal By-law 606-2018 for 64 Woodlawn Avenue West.
  • City Council intends to amend By-law 606-2018 to address concerns raised by the property owner.
  • If no objections arise regarding the proposed amendments, the City Solicitor will be authorized to introduce the Bill for the amendment in Council.
AI Generated
Date
2024-03-28
Motion
Adopt Item
Vote
Absent
Decision body
Toronto Preservation Board
Total
8-2
Status
Carried
Mar 28, 2024
2024.PB16.9

171 Lowther Avenue - Alterations to a Heritage Property and Authority to Enter into a Heritage Easement Agreement

  • City Council met to discuss the redevelopment of 171 Lowther Avenue.
  • The property is a designated heritage site built between 1901 and 1902, showcasing architectural styles of the time.
  • Plans include constructing an 11-storey residential building with 64 units, integrating the existing heritage structure.
  • The meeting aimed to ensure the conservation of the property's cultural heritage values.

Decisions and Recommendations

  • City Council approved alterations to the heritage property for the new residential building.
  • A Heritage Easement Agreement will be established with the property owner.
  • The owner must submit a detailed Conservation Plan and obtain necessary approvals before construction.
  • Site Plan drawings, an Interpretation Plan, a Heritage Lighting Plan, and a Landscape Plan are required.
  • A Letter of Credit must be provided to secure conservation work, and completion confirmation is needed before permit issuance.
AI Generated
Date
2024-03-28
Motion
Adopt Item
Vote
Absent
Decision body
Toronto Preservation Board
Total
7-3
Status
Carried
Mar 28, 2024
2024.PB16.12

36-42 Maitland Street - Alterations to Heritage Properties, Demolition of Attributes and Authority to Enter into a Heritage Easement Agreement

  • City Council met to discuss the proposed alterations and demolition of heritage properties at 36-42 Maitland Street.
  • The proposal includes building a new 56-storey residential tower with underground parking.
  • Efforts will be made to preserve key heritage elements of the existing buildings.

Decisions and Recommendations

  • City Council approved alterations to the heritage properties to allow for the new tower construction.
  • Demolition of certain heritage attributes was also approved, contingent on a satisfactory Conservation Plan.
  • The owner must enter into a Heritage Easement Agreement and provide a detailed Conservation Plan before proceeding.
  • Additional requirements include providing Site Plan drawings, a Heritage Lighting Plan, and an Interpretation Plan.
  • A Letter of Credit is required to secure the approved conservation work.
  • City Council authorized the City Solicitor to introduce necessary bills for the Heritage Easement Agreement.
AI Generated
Date
2024-03-28
Motion
Adopt Item
Vote
Absent
Decision body
Toronto Preservation Board
Total
9-0
Status
Carried
Mar 28, 2024
2024.PB16.14

650 (650A and 652) and 664 Yonge Street - Alterations to Heritage Properties, Demolition of Attributes and Authority to Enter into a Heritage Easement Agreement

  • The City Council meeting focused on the proposed development at 650 (650A and 652) and 664 Yonge Street.
  • The proposal includes constructing a 75-storey mixed-use tower while conserving designated heritage properties.
  • The meeting addressed alterations and demolition of heritage attributes as part of the development plan.

Decisions and Recommendations

  • City Council approved alterations to the heritage properties to allow for the new tower, subject to a Conservation Plan.
  • Demolition of certain heritage attributes at 650 (650A and 652) Yonge Street was also authorized under the Ontario Heritage Act.
  • The owner must enter into a Heritage Easement Agreement, provide detailed conservation and reconstruction plans, and withdraw any appeals related to the Historic Yonge Street Heritage Conservation District Plan.
  • Conditions were set for site plan approval, including a Heritage Lighting Plan and an Interpretation Plan.
  • Final approvals for permits and zoning amendments are required before construction can begin.
AI Generated
Date
2024-03-28
Motion
Adopt Item as Amended
Vote
Absent
Decision body
Toronto Preservation Board
Total
9-0
Status
Carried
Mar 28, 2024
2024.PB16.8

4888 Dundas Street West - Alteration of a Property Designated under Part IV of the Ontario Heritage Act and Authority to Enter into a Heritage Easement Agreement - Request for Directions

  • The City Council meeting took place on March 13, 2024.
  • A development proposal for 4884-4896 Dundas Street West was discussed, involving a mixed-use building.
  • The proposal evolved from a 12-storey building to a revised 29-storey building with more residential units and retail space.
  • The applicant appealed to the Ontario Land Tribunal due to delays in decision-making.
  • A settlement offer related to a heritage application was submitted by the applicant.

Decisions and Recommendations

  • The City Solicitor recommended that City Council adopt the recommendations in Confidential Attachment 1.
  • City Council was advised to authorize the public release of the recommendations if adopted.
  • All other information in Confidential Attachment 1 was to remain confidential, as it includes solicitor-client privileged advice.
  • The Toronto Preservation Board supported the recommendations from the City Solicitor.
AI Generated
Date
2024-03-28
Motion
Adopt Item
Vote
Absent
Decision body
Toronto Preservation Board
Total
9-1
Status
Carried
Mar 28, 2024
2024.PB16.13

68 Wellesley Street East - Refusal of Application for Alterations to Designated Heritage Properties Under Part IV, Section 33 of the Ontario Heritage Act

  • The City Council meeting addressed an application regarding a heritage property at 68 Wellesley Street East.
  • The property is part of the designated William McBean Terrace, constructed in the late 19th century.
  • An application was submitted for a new 28-storey mixed-use building with 258 residential units.
  • The property is protected under the Ontario Heritage Act, which influences decisions on alterations.

Decisions and Recommendations

  • City Council recommends refusing the application to alter the heritage property at 68 Wellesley Street East.
  • The refusal is based on assessments from Quadrangle Architects Limited and ERA Architects.
  • If the decision is appealed to the Ontario Lands Tribunal, City Council will send representatives to oppose the appeal.
  • The Toronto Preservation Board supports the refusal of the alterations as well.
AI Generated
Date
2024-03-28
Motion
Adopt Item
Vote
Absent
Decision body
Toronto Preservation Board
Total
9-0
Status
Carried
Mar 28, 2024
2024.PB16.16

374, 376 and 378 Yonge Street - Approval of Application for Alterations to Designated Heritage Properties Under Part IV, Section 33 of the Ontario Heritage Act and Authority to Enter into a Heritage Easement Agreement

  • The City Council meeting addressed updates regarding a heritage application for properties at 374, 376, and 378 Yonge Street.
  • The discussion followed a previous Toronto Preservation Board meeting held on March 18, 2024, where the application was initially refused due to concerns over visual impacts on heritage properties.
  • After further collaboration between the applicant and Heritage Planning staff, modifications were made to the proposed massing scheme.

Decisions and Recommendations

  • City Council approved alterations to the heritage properties to allow for an 85-storey mixed-use tower, contingent on several conditions.
  • The owner must enter into a Heritage Easement Agreement and provide a detailed Conservation Plan before any permits are issued.
  • Final Site Plan drawings and approvals for necessary Zoning By-law Amendments must be obtained.
  • A Heritage Lighting Plan, Interpretation Plan, and Signage Plan must also be provided to enhance the heritage character of the properties.
  • The City Solicitor was authorized to introduce necessary legislation for the Heritage Easement Agreement.
AI Generated
Date
2024-03-28
Motion
Adopt Item
Vote
Absent
Decision body
Toronto Preservation Board
Total
7-2
Status
Carried
Mar 21, 2024
2024.TE11.29

Use of Nathan Phillips Square for Various Events - May 1, 2024 - August 31, 2024

The purpose of this report is to request exemptions from Toronto Municipal Code Chapter 636 "Public Squares" and former City of Toronto Municipal Code Chapter 237 “Nathan Phillips Square” for events that are proposed to be held on Nathan Phillips Square from May 1, 2024 - August 31, 2024.

Date
2024-03-21 18:36 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
21-1
Status
Carried
Date
2024-03-20 18:34 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
20-2
Status
Carried
Mar 21, 2024
2024.MM16.24

Authority to Accept an In-Kind Donation and Enter into an Agreement with Pride Toronto for Hanlan's Point Rainbow Road

  • The meeting recognized Toronto's vibrant 2SLGBTQ+ communities and their histories.
  • City staff were tasked with collaborating with advocacy groups like Friends of Hanlan’s and Pride Toronto.
  • The goal is to enhance safety and celebrate Hanlan’s Point Beach as a historic queer community hub.
  • A proposal for a permanent art installation by queer artist Travis Myers was discussed, featuring a 600-metre painted rainbow on Beach Road.

Decisions and Recommendations

  • City Council approved an in-kind donation of up to $200,000 from Pride Toronto for upgrades to Beach Road.
  • The General Manager of Parks, Forestry and Recreation was authorized to negotiate and finalize a construction and donation agreement with Pride Toronto.
  • All actions are to comply with relevant City policies and standards for capital projects.
AI Generated
Date
2024-03-21 18:30 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
23-0
Status
Carried
Date
2024-03-21 17:54 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
24-0
Status
Carried
Mar 21, 2024
2024.MM16.48

Urgent Action on the Auto Theft Crisis

  • Carjackings and automobile thefts in Toronto have significantly increased in 2024.
  • There have been 68 carjackings, a 106% rise compared to 2023.
  • Auto thefts reached over 12,200 vehicles in 2023, up from 9,821 in 2022.
  • Related break-and-enters have also surged, with 34 incidents reported this year.
  • The situation is linked to organized crime, with stolen vehicles being shipped internationally.
  • Urgent action is needed from all levels of government to address this crisis.

Decisions and Recommendations

  • Councillor Mike Colle, supported by Councillor Frances Nunziata, proposed two key actions:
    1. Request a lifetime ban on Driver’s Licenses for individuals convicted of motor vehicle theft.
    2. Request a ban on exporting used automobiles from Canadian ports.
  • City Council referred the motion to the Economic and Community Development Committee for further discussion on April 30, 2024.
AI Generated
Date
2024-03-21 18:25 PM
Motion
Reconsider Item
Vote
Yes
Decision body
City Council
Total
17-4
Status
Carried
Mar 21, 2024
2024.MM16.50

Re-opening and Amending Item MM14.16 - Summit to Solve the Epidemic of Criminal Break-and-Enters Against Small Business in the City of Toronto

  • Small businesses in Toronto are experiencing a rise in criminal break-ins.
  • These crimes are impacting business owners who are already recovering from COVID-19 challenges.
  • Break-ins lead to significant costs, including repairs and increased insurance.
  • A summit was held on March 1, 2024, with various stakeholders to address this issue.
  • The City needs a program to help small businesses enhance their security measures.

Decisions and Recommendations

  • City Council amended its previous decision regarding the summit on break-ins.
  • The General Manager of Economic Development and Culture will report on the effectiveness of the Commercial Façade and Rehabilitation Program.
  • The report will assess if improvements are needed for security measures like lighting and locks.
  • Council will request provincial and federal funding for a grant program to support security upgrades for small businesses.
AI Generated
Date
2024-03-21 18:24 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
14-6
Status
Carried
Date
2024-03-21 18:13 PM
Motion
Re-open Item
Vote
Yes
Decision body
City Council
Total
22-1
Status
Carried
Mar 21, 2024
2024.MM16.25

Authorization to Release Section 42 Funds to Amend the 2024-2033 Capital Budget and Plan for Parks, Forestry and Recreation to Advance Hanlan's Beach Priority Initiatives in Ward 10

  • The City Council meeting focused on amending the 2024-2033 Capital Budget for Parks, Forestry and Recreation.
  • The Toronto Islands Master Plan has been in progress since 2022, with input from queer advocacy groups.
  • The meeting aimed to address urgent needs for Hanlan’s Beach, important to queer communities.
  • Proposed projects include ecosystem protective measures and improved access to the beach.

Decisions and Recommendations

  • City Council approved amendments to create three new capital sub-projects with a total cost of $700,000 for 2024.
    • Hanlan’s Beach Bike Parking: $100,000 for new bike parking locations.
    • Hanlan’s Beach Habitat Protection Fencing: $500,000 for habitat protection fencing.
    • Hanlan’s Beach Access Improvements: $100,000 for a new asphalt trail connection.
    • Hanlan’s Beach Commemorative Plaque: $20,000 for a plaque recognizing the beach's significance.
  • The General Manager of Parks, Forestry and Recreation is to prioritize these projects and consult with the Friends of Hanlan’s group.
AI Generated
Date
2024-03-21 17:57 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
25-0
Status
Carried
Mar 21, 2024
2024.PH10.13

Eliminating Education Development Charges on Missing Middle Housing Forms

On November 27, 2023, the Toronto Catholic District School Board (TCDSB) adopted a new Education Development Charges Bylaw that reinstated education development charges on missing middle housing forms like laneway suites and garden suites. As a result, households in the process of obtaining building permits for the purpose of constructing these housing forms are now being asked to pay ~$3,600 in development charges, despite previous guidance that none would be payable. 

 

The decision to reinstate education development charges on missing middle housing forms is counterintuitive to the City of Toronto’s goal to expand housing options in neighbourhoods, the Province of Ontario’s goal to rapidly increase the supply of housing, and our collective goal to increase housing affordability writ large. Therefore, this letter requests that the Province of Ontario amend the Education Act for the purpose of adding secondary dwelling units such as garden suites and laneway houses to the list of properties exempted from education development charges, thereby eliminating this gap in legislation.

Date
2024-03-21 17:04 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
22-1
Status
Carried
Mar 21, 2024
2024.PH10.11

Supporting New Long-Term Care Beds in North York

North York General Hospital has been a cornerstone of Don Valley North and North York since it opened its doors in 1968. It has provided nearly five decades of exceptional health care and community care to an increasingly diverse population.

 

Today, North York is home to a growing seniors' population and has the highest percentage of people age 65 and older in Toronto. To meet the rapidly growing need for seniors' health care, North York General Hospital is planning to build a new and modern long-term care home steps from the hospital at 4000 Leslie Street. They announced this plan as part of the overall infrastructure expansion they are pursuing in partnership with the Ontario Government.

 

North York General Hospital's new long-term care home will be one of the largest in Ontario, if not Canada, and will offer the most advanced safety, infection prevention and control, and quality standards as one of the first home built post-pandemic. The home will offer a variety of seniors-focused health services and amenities for both residents and seniors in the surrounding neighbourhoods.

 

North York General Hospital has been working closely with City Planning, the Ministry of Long-Term Care, and the Ministry of Municipal Affairs and Housing to design this new long-term care home in line with City and Ministry standards. To enable the creation of this new facility, an Enhanced Minister's Zoning Order has been requested from the Ministry of Municipal Affairs and Housing. The Enhanced Minister's Zoning Order would expedite the planning approvals process and allow North York General Hospital to meet the Ministry of Long-Term Care's expected project delivery schedule.

 

The Enhanced Minister's Zoning Order includes site-specific provisions for maximum height, gross floor area, minimum setbacks, and parking requirements, among other technical matters. Further, the proposal will be subject to a development agreement with the City of Toronto that allows for an additional level of design review prior to construction.

Date
2024-03-21 16:13 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
21-0
Status
Carried
Mar 21, 2024
2024.EC10.2

Response to EC6.9 - Incident and Operational Review of Serious Dog Attacks

On September 21, 2023, the Economic and Community Development Committee adopted EC6.9 - Incident and Operational Review of Serious Dog Attacks. The item included a letter from Councillor Paula Fletcher in response to a serious dog attack occurring on July 30, 2023. Staff were directed to review the specific incident, as well as procedures and processes of Toronto Animal Services (TAS) for the compliance and enforcement of Dangerous Dog Orders, including in the immediate aftermath of a serious dog attack. The Committee also requested staff review relevant Toronto Public Health (TPH) processes and procedures, as well as options to make dangerous dog charges known to the public.

 

TAS within Municipal Licensing and Standards (MLS) investigates dangerous acts committed by a dog. TAS enforces requirements under Chapter 349, Animals (the Animals By-law), which requires owners to take reasonable precautions to prevent their dog from engaging in a dangerous act. The By-law also sets out criteria for when a Dangerous Dog Order may be issued and outlines associated conditions a dog owner must comply with. TAS may also commence proceedings under the provincial Dog Owners’ Liability Act (DOLA), which states that dog owners are liable for any damages resulting from a bite or attack by their dog.

 

TPH investigates dog bites or attacks that could be conducive to the transmission of rabies to people. Investigation processes are dictated by the Health Protection and Promotion Act, its regulations, guidelines, and protocols from the Ministry of Health specific to the prevention of rabies.

 

This report summarizes results of operational reviews undertaken by MLS and TPH, as well as actions staff have completed and work that is currently underway to improve processes to support effective and timely dog investigations and enhance public safety.

 

This report was developed in consultation with TPH, Legal Services, and Strategic Public and Employee Communications. Legal Services is preparing a supplementary report for this item.

Date
2024-03-21 15:55 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
21-0
Status
Carried
Mar 21, 2024
2024.PH10.2

New Multi-Tenant Houses Renovation Program to Preserve and Improve Affordable Rental Homes

Multi-tenant houses (also known as rooming houses) are a critical component of the housing continuum and provide accommodation to diverse communities, including students, seniors, new immigrants, low-income residents, and people exiting homelessness. In recognition of the urgent need to protect this type of rental housing stock, in December, 2022, through Item 2023.CC2.1, City Council adopted the New Regulatory Framework for Multi-Tenant Houses (“Multi-Tenant Houses Framework”).

 

The Multi-Tenant Houses Framework will come into effect on March 31, 2024, and includes: an updated city-wide zoning approach to permit multi-tenant houses in all areas of the city, subject to zone-specific requirements; a new licensing by-law; and a phased and collaborative approach to licensing and enforcement. The framework is rooted in a human rights-based approach to housing and its implementation will help the City adhere to its commitments under the Toronto Housing Charter – Opportunity for All. Specifically, implementation of the new framework will extend consistent regulation of multi-tenant houses across the City, with the aim that more homes are being maintained in a state of good repair and living conditions are improved for tenants. Through implementation of the framework, the City also aims to secure affordability and availability of this type of rental housing stock.

 

To support implementation of the Multi-Tenant Houses Framework, in 2020 the Planning and Housing Committee directed the Housing Secretariat to develop and report back on a new incentives program to assist eligible property owners to comply with Ontario Building Code and Ontario Fire Code requirements that are needed to obtain a license. This report responds to the Committee’s request and recommends approval of a new ‘Multi-Tenant Houses Renovation Program’ (the “Program”) focused on improving living conditions and housing stability for tenants; preventing the loss of existing multi-tenant housing stock; and supporting eligible operators with complying with the new framework. 

 

To achieve the intended objectives, the proposed Program will provide grant funding and/or financial incentives (planning application and building permit fee waivers) to eligible property owners to address a broad range of costs directly related to improving safety and building conditions for tenants and bringing properties into compliance with the Zoning By-law, Ontario Building Code and Ontario Fire Codes. A funding allocation of $2 million for the first year of implementation has been approved in the Housing Secretariat’s 2024 Operating Budget and will provide staff with the flexibility to be responsive as issues arise during implementation. Additionally, where City funding and/or financial incentives are provided to support substantial repairs or renovations, the Program will require operators to operate as a licensed multi-tenant rental house for a minimum term of 15 years, and operators must not apply for any rent increases above the guideline as identified in the Residential Tenancies Act in connection with any of the improvements funded through the Program. Public investments will be secured through legal instruments and will be repayable by operators in the event of non-compliance.

 

The Program described in Attachment 1 is a preliminary model which will continue to be refined and improved based on qualitative and quantitative data and evidence, including feedback from tenants and operators. Staff will develop an evaluation framework, collect data and report back to Council by Q4 2024 with an interim Program update and recommendations to improve the program. An update will be provided to Council in 2025, concurrent with a report back on the first year of implementation of the Multi-Tenant Houses Framework and may provide additional recommendations.

 

The Program recommended in this report was developed in consultation with several City Divisions involved in the implementation of new Multi-Tenant Houses Framework, including City Planning, Municipal Licensing & Standards, Toronto Building, Toronto Office of Emergency Management, and Toronto Fire. It was also informed through engagement with housing operators, the City’s Tenant Advisory Committee, post-secondary institutions, and housing rights advocates. The Housing Secretariat will continue to engage with operators participating in the Program, tenants living in multi-tenant houses, housing advocates, the Tenant Advisory Committee, and the newly formed Housing Rights Advisory Committee, to ensure continued efficacy of the Program.

 

Implementation of the Program will support delivery of the City’s HousingTO 2020-2030 Action Plan and the Generational Transformation of Toronto’s Housing System to Urgently Build More Affordable Homes report (Item EX9.3), both of which are focused on increasing residents’ access to safe, secure and adequate homes in all neighbourhoods across Toronto.

Date
2024-03-21 15:51 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
19-2
Status
Carried
Mar 21, 2024
2024.MM16.19

Authority to Donate Surplus Vehicles

  • The City of Toronto held a meeting to discuss support for Ukraine on the second anniversary of Russia’s invasion.
  • The Consul General of Ukraine in Toronto, Mr. Oleksandr Shevchenko, requested assistance for humanitarian efforts in Kyiv.
  • Toronto and Kyiv have been friendship cities since 1991, celebrating 30 years of partnership in 2021.
  • The meeting focused on providing vehicles to aid in emergency humanitarian situations.

Decisions and Recommendations

  • City Council authorized the donation of up to five vehicles to the Ukrainian government for humanitarian purposes in 2024.
  • Fleet Services will donate two vehicles in April 2024, while Paramedic Services will donate one in April and up to two by Summer 2024.
  • Council requested Toronto agencies, including the Toronto Transit Commission and Toronto Police Services Board, to consider donating surplus vehicles to Ukraine.
  • Council also requested the City Manager to facilitate the provision of three generators for humanitarian use.
AI Generated
Date
2024-03-21 14:34 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Mar 21, 2024
2024.MM16.15

Clarification on Municipal Licensing and Standards Poster Enforcement Policies and By-laws - Rules Governing Affixing and Removing of Posters

  • The City Council meeting focused on regulations for community posters on public property.
  • Article IV of Chapter 693 in the Toronto Municipal Code outlines rules for posting on utility poles.
  • There are specific guidelines for who can post and what content is allowed, but clarity is lacking on several points.
  • Residents can report unauthorized posters to 311 for investigation and removal.

Decisions and Recommendations

  • Councillor James Pasternak, supported by Councillor Brad Bradford, proposed a review of the current poster policy.
  • The City Manager and Executive Director of Municipal Licensing and Standards are tasked with clarifying the policy.
  • The findings are to be reported back to the Economic and Community Development Committee by July 2024.
  • City Council referred Motion MM16.15 for further consideration during the meeting held on March 20 and 21, 2024.
AI Generated
Date
2024-03-21 14:32 PM
Motion
Waive Referral
Vote
No
Decision body
City Council
Total
12-11
Status
Lost
Mar 21, 2024
2024.MM16.14

Re-Opening and Amending Item 2023.IE7.4 on Updates on Vision Zero Road Safety Initiatives to Allow Optional Polling for Traffic

  • The City Council met to discuss updates to the Traffic Calming Policy.
  • The policy affects how speed humps are installed on city streets following requests.
  • Changes include lowering the speed threshold for qualifying streets and removing the need for public petitions.
  • Residents must now go through their local Councillor to request traffic calming investigations.
  • The new process grants Councillors significant authority, impacting transparency and public accountability.

Decisions and Recommendations

  • Councillor Stephen Holyday, supported by Councillor Jennifer McKelvie, recommended amending the Traffic Calming Policy.
  • The amendment would allow Community Councils to request a Clerk's Poll for traffic calming measures when deemed necessary.
  • The motion to introduce this recommendation was not presented at the City Council meeting on March 20 and 21, 2024.
AI Generated
Date
2024-03-21 14:30 PM
Motion
Re-open Item
Vote
Yes
Decision body
City Council
Total
10-13
Status
Lost
Mar 21, 2024
2024.MM16.4

Night Economy Manifesto

  • The City Council meeting focused on the Night Economy and its development.
  • The Night Economy Champion is collaborating with Economic Development and Culture.
  • The goal is to modernize rules for nighttime businesses while ensuring community safety.
  • The Nighttime Manifesto aims to promote a safe, sustainable, and inclusive nightlife.
  • Other cities, like New York and Berlin, support this initiative.

Decisions and Recommendations

  • Councillor Paul Ainslie, supported by Councillor Jennifer McKelvie, recommends that:
    1. City Council show support for the Nighttime Manifesto.
    2. The Mayor is requested to sign the Manifesto on behalf of Toronto.
  • City Council referred Motion MM16.4 to the Economic and Community Development Committee for further consideration on March 20 and 21, 2024.
AI Generated
Date
2024-03-21 14:23 PM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
11-14
Status
Lost
Mar 21, 2024
2024.EX12.4

Long-Term Financial Plan Update: Leveraging City-Wide Real Estate Opportunities for Affordable Housing, Complete Communities and Financial Sustainability

With the magnitude of the City’s unfunded capital program and the cost of generational programs such as the housing plan and climate action initiatives, the Long-Term Financial Plan identified the City’s real estate assets as a source for greater value potential. Specifically, evaluating underutilized real estate and deploying strategies to maximize the long-term value of assets for City benefits and fiscal sustainability. This includes fully leveraging the value from surplus lands no longer required for municipal services and from underutilized City properties with higher and better use and public benefit potential (i.e., for housing or mixed-uses). 

 

This report responds to recommendation 5.d. from item 2023.EX7.1 - Updated Long-Term Financial Plan that was adopted by City Council in September 2023:

 

"…to report back in advance of City Council’s consideration of the Mayor’s proposed 2024 budget on a review of all City-wide surplus and underutilized real estate assets with a recommended strategy for disposition or change in use as required, with priority consideration given to opportunities which may: 

 

- Be leveraged to support affordable housing initiatives;

 

- Enhance the City’s revenue generating potential and/or contribute to the City’s goals of long-term financial sustainability; or,

 

- Allow for joint ventures or partnerships which benefit the local community".

 

Through EX9.3 - Generational Transformation of Toronto's Housing System to Urgently Build More Affordable Homes, a list of 92 City-owned properties (both housing ready and with housing potential) were identified to support new affordable housing targets - which responds in part to this recommendation.

 

In terms of additional real estate portfolio opportunities, the vast majority of City-owned real estate is operationally required by City Divisions, Agencies and Corporations to deliver municipal services. The City does not have an abundance of properties deemed 'surplus' that are both no longer required for municipal service delivery and prime for significant real estate development. However, the City does have many opportunities within its broader real estate portfolio of underutilized properties that can be leveraged and/or redeveloped for higher and better uses, including new housing and mixed uses, co-locating municipal services and/or monetization opportunities.

 

Based on the City's real estate model, the mandates for CreateTO and the Corporate Real Estate Management (CREM) division include working together to continuously assess the City's mix of real estate assets (i.e., opportunities to buy, sell, lease, enter into partnerships, attract add-on investments, etc.) to enable the City's evolving service needs, drive 'City building opportunities' and be fiscally prudent.

 

Through initiatives such as the workplace modernization program (ModernTO), the City's housing plan and the plan for a new Etobicoke Civic Centre as a complete community, the City is already making better use of its real estate. These strategies opened opportunities for new affordable housing, complete communities, broad-based partnerships and long-term fiscal sustainability, and there continue to be opportunities to further this work.

   

This report identifies three broad real estate opportunities that could support city building, the City's housing plan and fiscal sustainability:

 

1. Transit-Oriented Parking Lots;

 

2. City-Owned Land Adjacent to Provincial Transit Sites; and

 

3. Intensification of Toronto Transit Commission (TTC) Stations.

 

If approved, the Deputy City Manager, Corporate Services will collaboratively work with partners including the Deputy City Manager, Development and Growth Services, Chief Executive Officer, CreateTO, Chief Executive Officer, Toronto Transit Commission, President, Toronto Parking Authority, Executive Director, Housing Secretariat, Executive Director, Transit Expansion Division and the Chief Planner and Executive Director, City Planning, to identify and consider real estate opportunities that could support Council's housing, community and/or fiscal sustainability goals. This incudes prioritization and a multi-year plan with funding and resource requirements.

 

Determining the best city building outcome for any City-owned property requires significant due diligence, planning analysis, financial analysis, stakeholder engagement and the development of appropriate business cases for a change in use before coming to Council for subsequent approvals. Further details regarding opportunities in the City-wide real estate portfolio are provided in this report.

Date
2024-03-21 12:05 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
21-1
Status
Carried
Date
2024-03-21 12:04 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
20-2
Status
Carried
Mar 21, 2024
2024.NY11.2

72 Church Avenue - Official Plan and Zoning By-law Amendment Application - Decision Report - Approval

This application proposes to permit a 4-storey rental residential building containing 14 units at a height of 13.9 metres.  A total of eight parking spaces and 17 bicycle parking spaces are provided within the below grade garage.  The total gross floor area ("GFA") is 1,508 square metres (Floor Space Index of 2.4 times the lot area).   

 

The proposed development is consistent with the Provincial Policy Statement (2020) and conforms with A Place to Grow: Growth Plan for the Greater Golden Horseshoe (2020). 

 

This report reviews and recommends approval of the application to amend the Official Plan and Zoning By-law as it provides for an appropriate level of intensification on a site within the North York Centre.

Date
2024-03-21 09:52 AM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
19-1
Status
Carried
Mar 20, 2024
2024.PH10.12

Technical Corrections to the Multi-tenant Housing Zoning By-law

1. Council approved the new Multi-tenant House (MTH) Zoning By-law and Licensing Frameworks at their December 2022 meeting, and adopted Zoning By-law 156-2023 and the new MTH Zoning regulations and licensing requirements come into effect on March 31st, 2024.


2. Since the adoption of the new framework, City staff have worked across Divisions to develop procedures and guidance to ensure its smooth implementation, and to educate operators and tenants.


3. Planning staff have identified some technical and non-substantive items in the By-law that should be improved for implementation.


4. The zoning by-law, in its current form, does not include a comprehensive map of permissions, which makes it difficult to quickly understand how the new zoning regulations apply to specific properties. The wording of certain regulations is also unclear and could be improved to clarify how MTHs are permitted in relation to residential buildings like multiplexes, and to correct formatting issues with the parking standards table.


5. it is important to make technical corrections to prior to the March 31st roll-out to ensure the framework is implemented in accordance with Council’s decision, and provide clarity for Toronto’s multi-tenant house operators and tenants and their neighbours.

Date
2024-03-20 17:56 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
22-1
Status
Carried
Mar 20, 2024
2024.EX12.9

Extending the Declaration Date for the Vacant Home Tax for the 2023 Taxation Year

The City of Toronto implemented a Vacant Home Tax in 2022. Because property status can change year-to-year, all property owners are required to declare the occupancy status of their property on an annual basis, even if they live there or fall under one or more exemptions. The declaration will determine whether the Vacant Home Tax applies and is payable.

 

In October 2023, City Council approved an updated communications plan related to the Vacant Homes Tax, which included increased communications with property owners who do not speak English as their first language. The 2024 process also included an earlier opening date, as well as pop-up sessions to support those who require assistance to submit their declaration.

 

For the 2023 taxation year, the deadline for property owners to declare their status was set at February 29, 2024. Given that the Vacant Home Tax is still relatively new for residents, and in recognition that the City wants to ensure all property owners have the opportunity to complete their declaration, I am recommending that Council extend the declaration deadline by an additional two-week period. If City Council adopts the proposed declaration deadline extension, to March 15, 2024, residential property owners will have until that date to submit the declaration.

 

City Council will not, however, be able to consider the proposed extension until its next regular meeting on March 20-22, 2024. As such, property owners are encouraged to submit their declaration as soon as possible to prevent any late submission fees from being charged.

 

To submit your declaration or for additional information, including exemptions, visit:

https://www.toronto.ca/services-payments/property-taxes-utilities/vacant-home-tax/vacant-home-tax-declaration-of-occupancy-status/

Date
2024-03-20 17:44 PM
Motion
End Debate
Vote
Yes
Decision body
City Council
Total
20-3
Status
Carried
Mar 20, 2024
2024.EX12.5

Prioritization of Planned Higher-Order Transit Projects

This report provides a high-level assessment of the higher-order transit corridors identified in Official Plan Map 4 Higher Order Transit Corridors in order to provide a comprehensive policy context for on-going discussions on individual transit projects. The report responds to several motions from Council regarding advancing specific proposed higher-order transit projects: Finch LRT west extension to Woodbine GO Station, Waterfront West LRT, and western and eastern extensions to the Sheppard Subway. The report recommends further work to update Map 4 to establish a future transit network plan to respond to Toronto's growth. The analysis in this report is framed in the context of several considerations and challenges that will shape recommendations on advancing higher-order transit development over the coming decade and beyond.


The Official Plan emphasizes the importance of maintaining and expanding a strong transit network to support the growth and development of the city and seeks to encourage more movement by transit and active transportation. Transit plays an important role in increasing access to education, employment, and other opportunities city-wide. Increasing transit use helps the City to address its climate change objectives and be more inclusive. Developing complete communities around transit stations and corridors, with higher density employment and residential development, supports the City's housing, economic, and social development objectives.

 

Several trends, considerations and challenges shape the context in which this assessment of Map 4 is framed:

 

1. Fiscal gap: The City has a recognized large budget shortfall and unfunded transit capital program. Given the need to prioritize State of Good Repair in the existing system and high construction costs of higher-order transit, further comprehensive preliminary planning analysis of a range of projects is required to develop a strong evidence base upon which Council can decide which projects would deliver the best value for money.

 

2. Housing and homelessness crisis: The price of housing is a widespread issue affecting Toronto and all of Canada. This is compounded by mismatches in the locations of higher population densities and higher-order transit; there are many areas composed primarily of single-family homes near existing high-order transit and conversely, areas with high population densities that are not as well served by higher-order transit, where residents have poorer transit access to employment and other opportunities. There is a historic trend of changing income distribution within Toronto with less affluent areas of the city shifting from being primarily downtown and near Lake Ontario to Toronto suburbs with poorer transit service. High house prices typically found around higher-order transit highlight the potential for transit-induced displacement when building higher-order transit.

 

3) Strong population and employment growth trends: Toronto is mandated by the Province to plan for roughly 30% growth between 2016 and 2051 but may exceed this target. A growing population may reinforce existing challenges and further increase the need for more space-efficient transportation such as transit. The current auto and transit transportation infrastructure will not adequately support the anticipated population growth.

 

4) Growing inequity: The COVID-19 pandemic, housing affordability and an overflowing shelter system have highlighted a growing gap where more people are struggling to meet basic needs. The analysis in this report uses new measures based on the concept of transport poverty to measure equity impacts of higher-order transit projects.

 

5) Climate emergency: To address a climate emergency, Council committed to reaching net-zero greenhouse gas (GHG) emissions in Toronto by 2040. A large shift to more people taking trips using transit and active modes of transportation is essential to meet this target.

 

6) Increasing crowding and congestion in the transportation system: Using ridership data provided by the TTC, there are many corridors not currently on Official Plan Map 4 that carry large numbers of riders on buses. Many surface transit corridors in the City experience very slow travel speeds, likely due to operating in mixed heavy traffic conditions. These analyses show the need to improve transit conditions in many parts of the City and not just along a small handful of corridors.

 

Staff evaluated 20 corridors on Official Plan Map 4 supplemented by four additional corridors with high transit ridership using the Rapid Transit Evaluation Framework (RTEF) established in the Official Plan. The evaluation does not cover new corridors being designed and constructed by Metrolinx nor the City's priority transit projects – the Waterfront East LRT and the Eglinton East LRT – as these projects are already advancing. As this work focuses on longer-term higher order transit, corridors that were part of RapidTO: Surface Transit Network Plan were not excluded. The focus is on how the range of corridors identified on Map 4 would augment the network of existing and under-development corridors, and guide future decision making.

 

Metrolinx is currently undertaking an Initial Business Case examining Line 4 extensions both westwards to Sheppard West Station and eastwards to McCowan Road. This report recommends that City staff engage with Metrolinx in this project to advance City interests along this important corridor. The Sheppard corridor between McCowan Road and Morningside Avenue is also being considered as part of the Eglinton East LRT, one of the City's priority projects.

 

Metrolinx is also delivering the Finch West LRT and the new Woodbine GO Station. This report notes the value of planning for the extension of the Finch LRT, initially to Woodbine and then further to connect to Pearson Airport, and recommends the City urge the Provincial government to include planning for this important LRT connection in its work.

 

Given that many of the top corridors in this evaluation are not included in Official Plan Map 4 and that Map 4 does not establish priorities, this report recommends a further comprehensive evaluation of this map to identify new corridors required to respond to demand, to review existing proposed corridors to ensure that they should remain on Map 4, and to propose priorities for advancing higher-order transit corridors.

 

Given that most of the top corridors in this report were light rail transit or bus rapid transit, staff also recommend a review of Official Plan Map 3 Right of Way Widths Associated with Existing Major Streets to ensure that adequate right-of-way is protected for future surface higher-order transit corridors identified on a revised Official Plan Map 4.

 

This report recommends advancing surface transit priority measures, such as through the RapidTO: Surface Transit Network Plan. Surface transit priority measures are lower cost than new higher-order transit lines and can be delivered in the short-to-medium-term to help alleviate crowding and congestion on the transit system, support climate change goals by encouraging more travel on transit, better serve areas in the city with higher proportions of equity-deserving people and support a growing population while remaining mindful of the City's financial situation. Higher-order transit planning can be started alongside implementation of these measures to support further long-term growth.

 

Finally, the correlation between housing prices and proximity to higher-order transit within Toronto is clear. Given the housing affordability crisis within the city, the relationship between housing prices and the proximity to transit, and the City's objective of building complete communities around transit, this report also recommends further work to identify ways to better link the City's desired transit and housing outcomes.

Date
2024-03-20 16:54 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
20-5
Status
Carried
Date
2024-03-20 16:52 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
16-9
Status
Carried
Date
2024-03-20 16:51 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
12-13
Status
Lost
Mar 20, 2024
2024.EX12.2

Update on Hosting FIFA World Cup 2026

Further to City Council's previous consideration in July 2022 (EX34.8), the City Manager and Executive Director, World Cup Hosting 2026 will be submitting a report to Executive Committee before its meeting on February 29, 2024 that provides an update on hosting the FIFA World Cup 2026 in Toronto including: planning, financial status, economic and community benefits, and intergovernmental negotiations.

Date
2024-03-20 15:41 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
24-1
Status
Carried
Date
2024-03-20 15:40 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
23-2
Status
Carried
Date
2024-03-20 15:39 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
20-5
Status
Carried
Mar 20, 2024
2024.PH9.12

78, 80 and 86 Mimico Avenue - Notice of Intention to Designate a Property under Part IV, Section 29 of the Ontario Heritage Act

This report recommends that City Council state its intention to designate the properties located at 78, 80 and 86 Mimico Avenue under Part IV, Section 29 of the Ontario Heritage Act for their cultural heritage value.

 

Located on the north side of Mimico Avenue at Station Road in Mimico, the properties at 78, 80 and 86 Mimico Avenue were constructed between 1920 and 1929 as main street commercial structures with residential/office uses above. Although constructed separately, these three buildings display a remarkable level of visual cohesion, sharing architectural elements including two storey profile, cornices, parapets, storefronts, and second storey apartments/offices.

 

These three properties are representative examples of the main street commercial building typology from Mimico's streetcar period (1918-1939) following the First World War, when Mimico experienced significant growth primarily along the north side of Mimico Avenue and where commercial structures were grouped together at the intersections of Lakeshore Boulevard West, Queens Avenue, and Station Road.  

 

The property at 80 Mimico Avenue was constructed in 1920 by John and Percy MacKenzie for their business, John MacKenzie and Son Dairy. The MacKenzie family sold the property at 80 Mimico Avenue in 1928 and in 1929, John, Percy, and Clarence MacKenzie constructed the building at 78 Mimico Avenue to accommodate their expanded dairy which operated as the Hillside Dairy from 1932-1943, and Silverwoods Dairy from 1944-1955. As such, a dairy operated for 35 years on the main street of Mimico. The property at 80 Mimico Avenue was purchased by Anthony Joseph in 1928, whose family would operate a grocery store there from 1929 until 1969.

 

Constructed between 1923 and 1924 for the Union Bank of Canada, 86 Mimico Avenue served as the branch of the Royal Bank of Canada from 1925-1935 prior to being purchased and occupied by Florence Weber in 1953, who would reside there for the next five decades.

 

As a group, the subject properties anchor the northeast corner of Mimico Avenue and Station Road and are important in defining, maintaining, and supporting the predominantly early-twentieth century main street character of Mimico Avenue, which includes a mix of early-twentieth century residential and commercial structures.

 

The properties located at 78, 80 and 86 Mimico Avenue were identified as having potential cultural heritage value in the Mimico 20/20 Revitalization Cultural Heritage Resource Assessment (CHRA) prepared in 2012 by URS Canada as a key component of the Mimico 20/20 Action Plan. The Mimico 20/20 Revitalization Cultural Heritage Resource Assessment identified the properties, along with the north side of Mimico Avenue between Queens Avenue and Station Road, as worthy of further investigation as either a potential Cultural Heritage Landscape or Heritage Conservation District "due to their cohesive character and level of integrity."

 

Staff have completed the Research and Evaluation Report for the properties at 78, 80 and 86 Mimico Avenue and determined that the properties meet Ontario Regulation 9/06, the criteria prescribed for municipal designation under Part IV, Section 29 of the Ontario Heritage Act under Design/Physical and Contextual Value. As such, the properties are significant built heritage resources.

 

On May 15, 2023, Demolition Permit Application 23 145944 DEM 00 DM was submitted for the property at 78 Mimico Avenue and Demolition Permit Application 23 145960 DEM 00 DM was submitted for the property at 80 Mimico Avenue. The applications are currently under review.

 

Designation enables City Council to review proposed alterations or demolitions to the properties and enforce heritage property standards and maintenance. The Bill 108 Amendments to the Ontario Heritage Act included a shift in Part IV designations related to Planning Act applications that would trigger a Prescribed Event. Section 29(1.2) of the Ontario Heritage Act now restricts City Council's ability to give notice of its intention to designate a property under the Act to within 90 days after the City Clerk gives notice of a complete application.

 

A "Prescribed Event" is a point of time when the application for an Official Plan Amendment, Zoning By-law Amendment and/or Draft Plan of Subdivision Application has been deemed complete and the City Clerk provides notice of that complete application to the public in accordance with the Planning Act. 

 

A Heritage Impact Assessment is required for all development applications that affect listed and designated properties and will be considered when determining how a heritage property is to be conserved.

Date
2024-03-20 14:39 PM
Motion
Adopt Item
Vote
No
Decision body
City Council
Total
15-10
Status
Carried
Mar 20, 2024
2024.NY11.6

1053 Don Mills Road, 2, 4, 4R, and 6 The Donway East Zoning By-law Amendment, Plan of Subdivision, and Site Plan Applications - Appeal Report

On October 8, 2021, Zoning By-law Amendment and Plan of Subdivision applications were submitted to permit four residential buildings that were proposed to be 32 storeys (Building A), 28 storeys (Building D), 24 storeys (Building B), and 16 storeys (Building C) in height. The proposal contained a total of 1,185 dwelling units, including 160 rental replacement units and 34 market rental units, as well as a public park, a public road, and a privately-owned-publicly accessible space (POPs). On April 28, 2023, an associated Site Plan Application was submitted, as well as a resubmission for the aforementioned Zoning By-law Amendment and Plan of Subdivision applications. The submissions reflect a revised proposal consisting of reduced heights of 29 stories for Building A, 25 stories for Building D, and 12 stories for Building C. The revised proposal also includes an increased gross floor area from 80,731 square metres to approximately 84,023 square metres as a result of changes made to the building massing, a decreased total number of dwelling units from 1,185 units to 1,176 units, including an additional 16 market rental units (the 160 replacement rental units remains unchanged), as well as various other changes to the building layout and massing, the configuration of the proposed privately-owned-publicly accessible space, and public park.

 

There are four 4-storey rental buildings on the site containing 160 residential rental units which would be demolished and are proposed to be replaced within the new development. This is subject to the related Rental Housing Demolition application, which is under review.

 

On October 20, 2023, the Applicant appealed all applications to the Ontario Land Tribunal ("OLT") due to Council not making a decision within the time frame in the Planning Act. A Case Management Conference was held on January 19, 2024. No hearing dates have been set to date. A second case management conference has not yet been scheduled. It is anticipated that a procedural order would be established to determine the sequencing of the various appeals to resolve the Zoning amendment matters prior to the Plan of Subdivision and Site Plan Control matters.

 

This report recommends that the City Solicitor with the appropriate City staff attend the Ontario Land Tribunal hearing to oppose the applications in their current form and to continue discussions with the Applicant to resolve outstanding issues.

Date
2024-03-20 10:43 AM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
22-1
Status
Carried
Mar 20, 2024
2024.IA16.2

Renaming of Dundas Toronto Transit Commission Stations

  • The City Council meeting discussed an Administrative Inquiry by Councillor Brad Bradford about renaming Dundas subway stations.
  • A previous motion from December 14, 2023, had directed the Toronto Transit Commission (TTC) to consider renaming these stations.
  • Estimated costs for renaming were discussed, with funding from Toronto Metropolitan University for Dundas Station.
  • The TTC was tasked to develop a framework for the renaming process and report back by late 2024.

Decisions and Recommendations

  • City Council received Administrative Inquiry IA16.2 and the City Manager's response IA16.2a for information.
  • The inquiry included questions about cost estimates, discussions with stakeholders, draft agreements, and potential revenue from naming rights.
  • Council aims to ensure transparency and public access to information regarding the renaming process.
AI Generated
Date
2024-03-20 10:01 AM
Motion
Re-open Item
Vote
Yes
Decision body
City Council
Total
13-10
Status
Lost
Mar 18, 2024
2024.PB15.11

625 Yonge Street (Including 627, 629, 631, 633, 635 and 637 Yonge Street and 1, 3 and 5 Isabella Street) - Alterations to a Heritage Property and Authority to Enter into a Heritage Easement Agreement

  • The City Council meeting focused on a proposed redevelopment at 625 Yonge Street.
  • The redevelopment includes a 70-storey mixed-use building and involves a heritage property.
  • The meeting addressed alterations to the heritage property under the Ontario Heritage Act.
  • The proposal is linked to an appeal regarding Official Plan and Zoning By-law Amendments.

Decisions and Recommendations

  • City Council approved alterations to the heritage property at 625 Yonge Street to allow for the new construction.
  • A Heritage Easement Agreement must be established before any Ontario Land Tribunal orders.
  • The owner must provide a detailed Conservation Plan and withdraw related appeals.
  • Conditions were set for Site Plan approval, including a Heritage Lighting Plan and an Interpretation Plan.
  • A Letter of Credit and completion confirmation from a qualified heritage consultant are required before permit issuance.
  • City Council authorized the necessary agreements and actions to ensure compliance with heritage preservation standards.
AI Generated
Date
2024-03-18
Motion
Adopt Item
Vote
Absent
Decision body
Toronto Preservation Board
Total
8-0
Status
Carried
Mar 18, 2024
2024.PB15.13

1779-1787 Bayview Avenue - Official Plan and Zoning By-law Amendment and Site Plan Control Applications - Heritage Matters

  • City Council met on October 11 and 12, 2023.
  • The meeting addressed appeals related to Zoning By-law Amendment and Official Plan Amendment Applications at 1779-1787 Bayview Avenue.
  • The appeals were made by the owner to the Ontario Land Tribunal after Council did not decide within the Planning Act's time frame.
  • The site includes properties with cultural heritage significance and transit infrastructure.

Decisions and Recommendations

  • City Council directed the City Solicitor and staff to oppose the appeals at the Ontario Land Tribunal.
  • Council will continue discussions with the applicant to resolve issues.
  • The City Solicitor recommended adopting and publicly releasing confidential recommendations regarding the appeals, while keeping certain information confidential.
  • The Toronto Preservation Board supported these recommendations.
AI Generated
Date
2024-03-18
Motion
Adopt Item
Vote
Absent
Decision body
Toronto Preservation Board
Total
8-0
Status
Carried
Mar 18, 2024
2024.PB15.2

6 and 8 Cawthra Square - Notice of Intention to Designate a Property under Part IV, Section 29 of the Ontario Heritage Act

  • The City Council meeting focused on the heritage designation of two properties at 6 and 8 Cawthra Square.
  • These properties are in the Church - Wellesley village area and feature similar red-brick houses from 1892.
  • The properties were listed on the City's Heritage Register on July 19, 2023.
  • A development application was made for these properties, with a decision deadline of May 1, 2024, due to a waiver from the owner.

Decisions and Recommendations

  • City Council intends to designate the properties at 6 and 8 Cawthra Square under the Ontario Heritage Act.
  • If there are no objections, the City Solicitor will be authorized to introduce the designation Bill in Council.
  • The Senior Manager, Heritage Planning is requested to assess the properties at 10 and 12 Cawthra Square for potential designation and report back to the relevant committees.
AI Generated
Date
2024-03-18
Motion
Adopt Item as Amended
Vote
Absent
Decision body
Toronto Preservation Board
Total
8-0
Status
Carried
Date
2024-03-18
Motion
Amend Item (Additional)
Vote
Absent
Decision body
Toronto Preservation Board
Total
8-0
Status
Carried
Mar 18, 2024
2024.PB15.10

49 and 51 Yonge Street - Alterations to Heritage Properties, Demolition of Heritage Attributes and Authority to Enter into a Heritage Easement Agreement

  • The City Council meeting addressed proposed changes to heritage properties at 49 and 51 Yonge Street.
  • The meeting focused on a redevelopment plan that includes a 62-storey mixed-use building while preserving certain heritage aspects.
  • The proposal is linked to an appealed Zoning By-law Amendment application currently before the Ontario Land Tribunal.

Decisions and Recommendations

  • City Council approved alterations and demolition of heritage attributes at 49 and 51 Yonge Street under the Ontario Heritage Act.
  • The construction of a new tower is to proceed while retaining the exterior walls of the existing buildings.
  • Conditions for approval include entering a Heritage Easement Agreement and providing a detailed Conservation Plan.
  • Final Site Plan drawings and a Heritage Lighting Plan must be submitted for satisfaction before permits are issued.
  • The Toronto Preservation Board forwarded the matter to City Council without additional recommendations.
AI Generated
Date
2024-03-18
Motion
Adopt Item
Vote
Absent
Decision body
Toronto Preservation Board
Total
4-5
Status
Lost
Feb 16, 2024
2024.SC11.3

4566 and 4568 Kingston Road - Zoning Amendment, Application - Decision Report - Approval

This report reviews and recommends approval of the application to amend the Zoning By-law to permit the construction of a 12-storey mixed use building located at 4566 and 4568 Kingston Road. The application proposes a total gross floor area of 9,276.39 square metres and contains of 131 residential dwelling units supported by 105 vehicular parking spaces and 116 bicycle parking spaces.

 

The proposed development is consistent with the Provincial Policy Statement and conforms with the Growth Plan. The proposal advances the Official Plan direction for both Avenues and Mixed Use Areas through the intensification and reurbanization of an underutilized site on Kingston Road, and successfully implements the intent of the Kingston Road Avenue Study in a compact built form that is contextually appropriate.

 

This report reviews and recommends approval of the application to amend the Zoning By-law.

Date
2024-02-16
Motion
Adopt Item
Vote
Yes
Decision body
Scarborough Community Council
Total
5-0
Status
Carried
Feb 16, 2024
2024.SC11.10

Metrolinx Scarborough Subway Extension - Time Extension of Temporary Sidewalk Closure on McCowan Road

As the Toronto Transit Commission (TTC) operates a transit service on McCowan Road, City Council approval of this report is required.

 

Currently, Metrolinx's contractor, Strabag ("the Project Co.") is actively engaged in tunnel boring operations at the designated site in the north-east quadrant of Sheppard Avenue East and McCowan Road. The City Council-approved temporary closure of the east sidewalk on McCowan Road, between Sheppard Avenue East and Nugget Avenue, has been implemented to mitigate potential conflicts between pedestrians and significant flow of inbound and outbound construction vehicles. The approved sidewalk closure is set to expire on March 31, 2024.

 

Metrolinx has submitted a request for an extension of the temporary sidewalk closure until December 31, 2025. This extension is sought to accommodate the ongoing tunnel boring operations, which have experienced schedule adjustments due to challenges associated with the tunnel boring machine operation and maintenance. Subject to City Council approval of the requested time extension, with the east sidewalk closure in place, pedestrians will continue to utilize the west sidewalk on McCowan Road by safely crossing at the signalized intersections of McCowan Road and Sheppard Avenue East and McCowan Road and Nugget Avenue. Finally, the Project Co. will continue to monitor pedestrian safety along the north sidewalk on Sheppard Avenue East abutting the site by deploying traffic control persons at the site accesses.

Date
2024-02-16
Motion
Amend Item (Additional)
Vote
Yes
Decision body
Scarborough Community Council
Total
3-1
Status
Carried
Feb 14, 2024
2024.CC15.1

Budget Implementation Including Property Tax Rates, User Fees and Related Matters

  • The City Council meeting focused on approving elements necessary for the 2024 Budget.
  • Key topics included property tax rates, user fees, and intergovernmental funding.
  • The meeting aimed to ensure financial plans align with the proposed budget by the Mayor.

Decisions and Recommendations

  • Approved 2024 municipal tax ratios and property tax rates to meet budget revenue goals.
  • Recommended adjustments to existing user fees and the introduction of new fees to align with the budget.
  • Summarized federal and provincial funding programs for infrastructure in the 2024-2033 Capital Budget and Plan.
  • Suggested actions for program-specific reports, collaboration across divisions, and authority to negotiate capital project agreements.
  • Recommended establishing a new reserve fund for future financial needs.
AI Generated
Date
2024-02-14 18:48 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
26-0
Status
Carried
Date
2024-02-14 18:46 PM
Motion
Reconsider Vote
Vote
Yes
Decision body
City Council
Total
18-8
Status
Carried
Date
2024-02-14 18:44 PM
Motion
Reconsider Vote
Vote
Yes
Decision body
City Council
Total
19-7
Status
Carried
Feb 14, 2024
2024.MPB15.1

2024 Operating and Capital Budgets

  • The City Council meeting was held on February 14, 2024.
  • The Mayor presented the Proposed 2024 Budget, fulfilling the requirements of the City of Toronto Act, 2006.
  • The budget aims to protect essential services and address a $1.8 billion financial shortfall.
  • Key investments include housing, transit, community safety, and infrastructure improvements.

Decisions and Recommendations

  • The Proposed Budget was adopted as amended by City Council.
  • Various operating budget increases were approved for Economic Development, Parks, Social Development, and Transportation Services, offset by decreases in Corporate Accounts.
  • Funding was allocated for community safety programs, tree maintenance, and noise complaint responses.
  • The Toronto Police Service's budget was increased by $12.6 million gross, with future funding discussions planned.
  • Amendments were made to the Parks, Forestry, and Recreation Capital Budget to support community-led projects.
AI Generated
Date
2024-02-14 16:45 PM
Motion
Amend Mayor's Proposed Budget
Vote
Yes
Decision body
City Council
Total
25-1
Status
Carried
Date
2024-02-14 16:44 PM
Motion
Amend Mayor's Proposed Budget
Vote
Yes
Decision body
City Council
Total
25-1
Status
Carried
Date
2024-02-14 16:43 PM
Motion
Amend Mayor's Proposed Budget
Vote
Yes
Decision body
City Council
Total
24-2
Status
Carried
Feb 7, 2024
2024.MM14.9

Going with the Snow - Returning Tobogganing to 45 Hills Across Toronto

  • The City Council meeting addressed the regulation of tobogganing in city parks.
  • Tobogganing is a popular winter activity for families in the city.
  • Recent signs prohibiting tobogganing caused confusion and disappointment among residents.
  • The community expressed a desire for safer outdoor winter activities.

Decisions and Recommendations

  • City Council decided to remove prohibitive signs and replace them with warning signs about tobogganing risks and information on designated hills.
  • The Council amended Municipal Code Chapter 608 to require local councillor consultation before prohibiting tobogganing on any hill.
  • Hay bales will be re-installed at previously prohibited tobogganing hills to enhance safety.
  • The Council requested the Province of Ontario to collaborate with municipal governments on amending liability legislation related to recreational activities on city property.
AI Generated
Date
2024-02-07 18:58 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
21-3
Status
Carried
Date
2024-02-07 18:58 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Feb 7, 2024
2024.RM14.1

Call to Order

  • The City Council meeting was held on February 6, 2024, starting at 9:38 a.m.
  • The meeting began with the national anthem, "O Canada."
  • Members observed a moment of silence to remember notable individuals and victims of a recent plane crash.
  • Speaker Nunziata acknowledged the Indigenous Peoples of the land, emphasizing the importance of improving relationships and understanding Indigenous cultures.
  • The meeting recognized Toronto's history and treaties with various Indigenous nations.

Decisions and Recommendations

  • The meeting was officially called to order by Speaker Nunziata.
  • Council members participated in a moment of silence to honor the deceased.
  • The City Clerk provided access to the meeting agenda online for public viewing.
  • Speaker Nunziata reaffirmed the Council's commitment to Indigenous relations and cultural understanding.
AI Generated
Date
2024-02-07 17:36 PM
Motion
Resolve to Committee of Whole
Vote
No
Decision body
City Council
Total
16-10
Status
Carried
Date
2024-02-07 12:19 PM
Motion
Resolve to Committee of Whole
Vote
No
Decision body
City Council
Total
8-17
Status
Lost
Feb 7, 2024
2024.CC14.10

3585 and 3595 St. Clair Avenue East, 636 to 646 and 641 to 663 Danforth Road, and 411 and 415 Kennedy Road - Official Plan Amendment, Zoning Amendment, Draft Plan of Subdivision - Request for Direction

  • A City Council meeting was held regarding development applications for 6,600 new dwelling units.
  • The applications involve high-rise mixed-use apartment towers ranging from 14 to 48 storeys.
  • The applicant appealed to the Ontario Land Tribunal, leading to a scheduled hearing starting March 5, 2024.
  • Urgent consideration was required due to the implications outlined in Confidential Attachment 1.

Decisions and Recommendations

  • City Council adopted the confidential instructions from the City Solicitor and authorized their public release.
  • The Council accepted a settlement offer and directed the City Solicitor to support it at the Ontario Land Tribunal.
  • Discussions on Community Benefit Charge contributions were mandated, focusing on public art, a community recreation centre, and affordable housing provisions.
  • An on-site parkland dedication and various conditions for development approvals were established.
  • The City Solicitor was authorized to take necessary actions to implement these decisions.
AI Generated
Date
2024-02-07 17:24 PM
Motion
Adopt Item as Amended
Vote
No
Decision body
City Council
Total
24-2
Status
Carried
Date
2024-02-07 17:23 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
26-0
Status
Carried
Date
2024-02-07 17:22 PM
Motion
Amend Item
Vote
No
Decision body
City Council
Total
25-1
Status
Carried
Feb 7, 2024
2024.IE10.6

Delivering Improved Accessibility: Bike Share Toronto's Modernized Rate Structure Update

At its meeting on November 23, 2023, the Toronto Parking Authority considered Item PA7.7 and referred it to the Infrastructure and Environment Committee.


Summary from the report (November 9, 2023) from the President, Toronto Parking Authority
Bike Share Toronto is a convenient, affordable, and sustainable mobility option that is an integral component of Toronto’s transportation network and one of North America's largest bike share systems. The program has seen tremendous growth, expanding from a system of 80 stations and annual ridership of 400,000 in 2011, to a network of over 780 stations, 8,800 bikes (including 1,825 e-bikes) and a projected ridership of 5.5 million in 2023 - an increase of 23 percent from 2022.

 

In 2023, Toronto Parking Authority made recommendations to Toronto Parking Authority's
Board and City Council to modernize Bike Share Toronto's rate structure. The recommended
changes - the first since 2017 - were intended to address the imbalance between volume growth and cost pressures that were degrading key operating metrics and ultimately undermining customer experience.


City Council's adoption of the new rate structure included several amendments regarding the
development of new payment methods, special passes, an accelerated implementation schedule for a low-income pass and completion of an equity-based investigation into the impacts of the new rate structure on the inner suburbs.


The new Bike Share Toronto rate structure was launched on April 3, 2023. Since that time, the sale of annual memberships (32,000 Year to date, + 10 percent v 2022) has continued to grow year over year. Use of e-bikes by both annual members and casual riders has increased exponentially (336,000 rides + 111 percent Year to date) and overall customer satisfaction with the program, including the rate structure, remains at industry leading levels.


In response to the amendments included in Council's approval of the new rate structure,
Toronto Parking Authority has completed the development work to enable payment of annual
memberships in three (3) installments, developed 100 special Ontario Disability Support
Program (ODSP) passes to be distributed by the YMCA, developed a seniors pass (65+ years) that Bike Share Toronto will pilot for one (1) year and extended corporate discounts to the staff and students at Toronto District School Board (TDSB) and Toronto Catholic District School Board (TCDSB).


In addition, Toronto Parking Authority has worked with Toronto Community Housing (TCHC) to make $5 annual memberships available to existing Rent-Geared-to-Income residents and is working with Social Development, Finance and Administration Division (SDFA) to implement a $5 annual membership available to Toronto Transit Commission Fare Pass holders as early as the second quarter of 2024. Finally, Toronto Parking Authority is carrying out an equity-based investigation into how the new rate structure is impacting users from the inner suburbs and adjusting its 2023 and 2024 expansion plans to reflect this input.

Date
2024-02-07 17:10 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
23-2
Status
Carried
Feb 7, 2024
2024.NY10.5

3 Swift Drive - Zoning By-law Amendment and Rental Housing Demolition Applications - Decision Report - Approval

This application proposes to amend City-wide Zoning By-law 569-2013 for the lands at 3 Swift Drive. The applicant proposes to demolish the existing 4-storey residential building at 3 Swift Drive containing 61 rental dwelling units and redevelop the lands with 35-storey (112 metre) and 31-storey (100 metre) towers connected by a 7-storey (27 metre) podium.  The application also proposes a 518.9 square metre on-site public parkland dedication and a 268 square metre privately-owned publicly-accessible space. The proposed development would contain 857 residential units of which 61 units will be rental replacement units, with a total gross floor area of 55,368.5 square metres resulting in a density ("FSI") of 10.67 times the area of the lot.  A Location Map can be found in Attachment 2 to this report.

 

The proposal also includes a Tenant Relocation and Assistance Plan that addresses the right of existing eligible tenants to return to a replacement rental dwelling unit at similar rents and financial compensation to lessen hardship.  The proposed replacement rental dwelling units will be secured at affordable, mid-range (affordable), and mid-range (moderate) rents.

 

The proposed development is consistent with the Provincial Policy Statement (2020) and conforms with A Place to Grow: Growth Plan for the Greater Golden Horseshoe (2020).  The proposed development conforms to the City of Toronto Official Plan.  This report reviews and recommends approval of the application to amend the Zoning By-law and the Rental Housing Demolition application at 3 Swift Drive. The proposed development represents an appropriate level of intensification on the site and provides for amenity improvements for existing residents and the surrounding community.

Date
2024-02-07 17:07 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
24-1
Status
Carried
Date
2024-02-06 10:23 AM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Feb 7, 2024
2024.IE10.2

Cycling Network Plan: 2024 Cycling Infrastructure Installation - First Quarter Update

The Cycling Network Plan and the associated Near Term Implementation Plan, adopted by City Council in December 2021 seeks to build on the existing network of cycling routes to Connect gaps in the current network, Grow the network into new parts of the city, and Renew existing parts of the network to improve safety. Through this report, Transportation Services is seeking authority for bikeway projects that are proposed to be installed in the near term (2022-2024) for which design and consultation have been completed.

 

This report seeks Council authority to install 1.5 centreline kilometres (km) of new bikeways on the following streets:

 

- Champagne Drive: Chesswood Drive to Finch Avenue West (cycle tracks, Ward 6)

 

- Alness Street: Finch Avenue West to Finch Hydro Corridor (cycle tracks, Ward 6)

 

 - University Avenue: 150 m from current terminus south of King Street to south of Wellington Street (cycle tracks, Ward 10)

 

- Richmond Street: Strachan Avenue to Niagara Street (contra-flow bike lanes, Ward 10)

 

Further, this report seeks Council authority to make by-law amendments associated with improvements to 3.5 centreline kilometres of existing cycling infrastructure on the following streets:

 

- Dundas Street East: Broadview Avenue to West Avenue (bike lanes to cycle tracks, Ward 14)

 

- Dundas Street East: Logan Avenue to Pape Avenue (bike lanes to cycle tracks, Ward 14)

 

- Hoskin Avenue: Queens Park Crescent West to St George Street (bike lanes to cycle tracks, Ward 11)

 

- Harbord Street: St George Street to Ossington Avenue (bike lanes to cycle tracks, Ward 11)

 

As part of this report, Transportation Services is continuing to utilize the streamlined reporting process for by-law amendment submissions associated with cycling infrastructure projects approved by Council for implementation. Once projects are approved by Council, the streamlined process involves delegation of authority to submit bills directly to Council for a discreet period of time after project implementation which enables Transportation Services to make minor adjustments to constructed conditions without delay and based on local Councillor and public feedback such as parking adjustments to improve sight-lines, adjustments or addition of accessible loading areas, and similar modifications.

 

The changes proposed as part of the projects identified above would improve safety and mobility options by providing improved cycling connections to transit, parks, local schools, businesses, and residences. Pedestrian improvements have also been included in the projects, wherever feasible, including curb extensions and new sidewalk installations, and motor vehicle lane adjustments.

 

Finally, this report seeks to make minor housekeeping amendments to existing bikeways and their associated traffic and parking by-laws on the following streets:

 

- Bloor Street West (bicycle and traffic and parking, Ward 3 and 11)

 

- Bartlett Avenue (traffic and parking, Ward 9)

 

- Temperance Street (bicycle and traffic, Ward 10)

 

- Shaw Street (bicycle and traffic and parking, Ward 11)

 

- The Esplanade (bicycle and traffic and parking, Ward 10 and 13)

 

- Wilmington Avenue (parking, Ward 6)

 

- Yonge Street (traffic, Ward 11 and 12)

 

An additional report is anticipated for 2024 projects in the second quarter of 2024. A map of the bikeway projects proposed in this report is included as Attachment 1. 

Date
2024-02-07 17:03 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Date
2024-02-07 17:00 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
21-2
Status
Carried
Date
2024-02-07 16:59 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
19-4
Status
Carried
Feb 7, 2024
2024.IE10.3

Bike Lanes that are Safe and Passable for Bikes

The minimum standard of ice / snow management on most Toronto streets is described as "safe and passable". In practice, Toronto streets are almost always "safe and passable" for cars and trucks. However, bike lanes are only "safe and passable" when they are "safe and passable" for bicycles. In Toronto's weather, because of our frequent fluctuations above and below zero, no bike lane is "safe and passable" unless it is cleared to bare pavement. Layers of snow / slush that are passable for cars quickly become icy and unsafe for bicycles.

 

Last year, protected bike lanes (cycle tracks) were generally properly cleared after the first few weeks of confusion. However, on-road bike lanes were often left hazardous with frequent patches and barriers of ice, especially in the most dangerous locations such as curves and hills.

 

Improved winter bike lane maintenance is necessary for Vision Zero and to support Toronto’s climate commitments, in particular to allow three quarters of local trips (year round) to be made by foot, bicycle or transit by the end of this decade. It is also necessary to support other city initiatives, such as the five dollar a year Bikeshare membership just extended to Toronto Community Housing Corporation tenants, and the work being done to encourage downtown deliveries by cargo bike.

Date
2024-02-07 16:47 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
20-1
Status
Carried
Feb 7, 2024
2024.EC9.5

Implementation Review of the Noise By-law

In a city as large and vibrant as Toronto, certain levels of noise are reasonable and reflect life in a densely populated city. Toronto Municipal Code, Chapter 591, Noise (“Noise By-law”) balances the city’s vibrancy with the needs of residents and visitors and provides time restrictions and sound level limits for various types of noise. The By-law works to set out clear and enforceable noise rules across the City, while providing flexibility to meet local needs.

 

As directed by City Council, the purpose of this report is to review the successes and challenges of the implementation of the comprehensive changes to the Noise By-law that were made in 2019, and to recommend refinements to the By-law. The amendments made in 2019 resulted in notable changes such as the introduction of sound level limits for amplified sound and motorcycles, enhancements to the noise exemption permit process, and the introduction of a dedicated noise enforcement team with late night coverage.

 

After a thorough review of the current Noise By-law in 2023, including extensive research scans, stakeholder engagement and technical advice from an acoustical engineering firm, staff recommend several refinements to the By-law, including:

  • Modernizing the exemption permit process, such as introducing activity-based permits that differentiate higher and lower impact activities.
  • For the amplified sound section, lowering nighttime indoor limits by 3 decibels and incorporating instrument sound into the section, with an associated definition.
  • Implementing Council direction to add a motor vehicle noise decibel limit (in addition to limits currently in place for motorcycles), to be enforced alongside the Toronto Police Service (TPS).
  • Introducing a pathway for residents to submit complaints on waste collection noise and for City staff to communicate with industry on persistent noise issues.
  • Making technical amendments to definitions, such as clarifying the language of “point of reception” in the By-law to accommodate measurements from the property line of a point of reception as needed.
  • Incorporating sound-induced vibration into the prohibition on “unreasonable and persistent” noise to enable a more sufficient response to public concerns about the health impacts of prolonged exposure to sound-induced vibration.

This report also includes several additional actions, including updating the 311 service requests (complaints) process, conducting a City-wide public education campaign, requesting the provincial government change legislation to allow for the City’s use of automated noise radar when the technology is ready, updating fees for noise exemption permits and noise monitoring along with an associated resource request to support upgrades to the noise exemption permit process, and operationalizing adjustments for sound level measurements, such as a penalty for tonal elements such as a hiss, hum, or buzz.

 

According to public opinion research conducted on behalf of the City in 2023, 51 percent of residents believe that noise levels in Toronto are reasonable and reflect life in a big city, while 49 percent believe that more needs to be done to restrict noise levels because of potential negative health consequences and impacts to quality of life and well-being. Managing and regulating noise is a complex undertaking and proposed changes attempt to maintain the balance of multiple competing interests of people living, working, and visiting the city.

 

This report was prepared in consultation with Legal Services, Technology Services, Toronto Public Health, and Solid Waste Management Services.

Date
2024-02-07 16:31 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
24-1
Status
Carried
Date
2024-02-07 16:30 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
21-4
Status
Carried
Feb 7, 2024
2024.IE10.7

Highway 401 Overpass Safety

In recent months, there has been a growing number of protests and rallies on 401 overpass bridges around the Greater Toronto Area. These groups vary in size from a few people to dozens. The events include the waving of flags, the affixing of posters to the bridge overhang, and using noise amplification. At times, there are also counter protests. A 401 overpass is perhaps one of the most dangerous locations for protests and rallies. The intention of the protests is to deliberately distract drivers to bring attention to their cause, on one of the busiest highways in North America. It is only a matter of time before there is a catastrophic accident with fatalities, injuries and property damage. Because the overpass is municipal responsibility and the highway below is provincial, various issues have emerged about what enforcement measures the City of Toronto can take to keep the roadway free of protests and safe for pedestrians, cyclists and motorists. There are also questions about how jurisdictional and enforcement measures are handled and divided between city staff (such as Municipal Licensing) and which are handled by Toronto Police Services. There is an urgency to see jurisdictional and enforcement clarity on this matter.

Date
2024-02-07 15:31 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
18-6
Status
Carried
Date
2024-02-07 15:29 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
16-8
Status
Carried
Date
2024-02-07 15:28 PM
Motion
Amend Item (Additional)
Vote
No
Decision body
City Council
Total
13-11
Status
Carried
Feb 7, 2024
2024.MM14.14

No More Subsidies for New Gas Pipelines that Drive Up Torontonians' Energy Costs

  • The City Council meeting focused on fossil fuel subsidies and their negative impacts.
  • A motion was presented to support the Ontario Energy Board's decision to end subsidies for new methane gas pipelines by 2025.
  • Concerns were raised about the Ford government's potential interference in this decision.
  • The meeting highlighted the financial burden of subsidies on consumers and the environmental consequences.

Decisions and Recommendations

  • Councillor Dianne Saxe, supported by Councillor Alejandra Bravo, recommended that:
    1. City Council express support for the Ontario Energy Board's decision to end gas pipeline subsidies.
    2. The Ontario Government be urged to uphold this decision.
    3. The motion be forwarded to the Premier, the Minister of Energy, and the Minister of Finance.
    4. The Association of Municipalities of Ontario be informed to seek support from other municipalities.
  • City Council referred the motion to the Executive Committee for further consideration.
AI Generated
Date
2024-02-07 14:25 PM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
14-12
Status
Lost
Feb 7, 2024
2024.MM14.4

Tax Fairness for All: An Equitable Approach to the Residential Property Tax Rate on Toronto Island

  • The meeting discussed property tax rates for Toronto Island homeowners.
  • Toronto Island residents enjoy low crime, full municipal services, and a year-round ferry.
  • Homeowners own their houses but lease the land from the City, leading to lower property taxes.
  • Average property tax for Toronto Island is $1,530, compared to $4,320 for Flemingdon Park tenants.
  • Providing municipal services to the island costs about three times more than for the rest of the City.

Decisions and Recommendations

  • Councillor Jon Burnside, supported by Councillor James Pasternak, recommended that the Chief Financial Officer report on the feasibility of using Area Rating for Toronto Island property taxes.
  • City Council referred Motion MM14.4 to the Executive Committee for further consideration on February 6 and 7, 2024.
AI Generated
Date
2024-02-07 14:19 PM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
11-15
Status
Lost
Feb 7, 2024
2024.PH9.1

Ready, Set, Midtown: Zoning Review - City Initiated Zoning By-law Amendments for Select Lands Designated Apartment Neighbourhoods - Decision Report - Approval

The Midtown Zoning Review is one of three initiatives collectively known as "Ready, Set, Midtown", to implement Official Plan Amendment 405, the Yonge-Eglinton Secondary Plan ("the Plan"), The other two initiatives are the Midtown Infrastructure Implementation Strategy and the Midtown Public Realm Implementation Strategy.

 

The Midtown Zoning Review is intended to implement the policies of the Yonge-Eglinton Secondary Plan via permissions in zoning. City Council has adopted by-laws for this purpose in phases, including those for the 'Villages' Character Areas and select low-rise Neighbourhoods.

 

The purpose of this report is to bring forward recommended zoning by-law amendments to implement Secondary Plan policies for select lands designated Apartment Neighbourhoods, and certain Parks and Open Space Areas - Parks. Most of these lands fall within a Council-adopted Major Transit Station Area, which sets a minimum floor space index for the lands. The recommended zoning by-law amendments permit, housing in mid-rise and tall building forms on lands planned for mid-rise to high-rise intensification, along with small scale arts, cultural, retail and service uses. The recommended changes coming into force and effect will streamline the planning approvals for development in conformity with the Plan. Changes proposed also include an enhancement to existing regulations regarding the adequacy of municipal servicing, and rezoning lands identified as future parks. The report outlines the process undertaken to arrive at the recommended zoning by-law amendments, including engagement and public consultation.

 

The recommended zoning by-law amendments are consistent with the Provincial Policy Statement, and conform to A Place to Grow: Growth Plan for the Greater Golden Horseshoe and with the Official Plan.

Date
2024-02-07 14:15 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
24-1
Status
Carried
Feb 7, 2024
2024.EC9.4

Homelessness Services Capital Infrastructure Strategy: Real Estate Strategy and Lease Extensions

This report presents the real estate strategy and recommendations to implement the new Homelessness Services Capital Infrastructure Strategy. The Homelessness Services Capital Infrastructure Strategy was approved by City Council in November 2023 and recommended a long-term, proactive approach for Toronto Shelter and Support Services to improve the stability and recovery of the shelter system and address the unprecedented demand for shelter beds. The Homelessness Services Capital Infrastructure Strategy focuses on developing purpose-built shelters, and a gradual transition out of COVID-19 shelter hotels. This real estate strategy was developed in collaboration with Corporate Real Estate Management, and is a companion report to the Homelessness Services Capital Infrastructure Strategy that seeks authorities from City Council required for the real estate and construction activities to implement the Homelessness Services Capital Infrastructure Strategy. The report also reports back on City Council direction to assess opportunities for property acquisition of currently leased sites, including motels that form part of the family and refugee shelter program, and to leverage sites for the dual purpose of shelter and transitional or permanent housing.

 

The real estate strategy focuses on three streams. The first is to obtain City Council authority to expedite the redevelopment of existing City-owned sites or acquiring new sites for permanent, purpose-built shelters with the goal of securing at least five (5) new shelter opportunities in 2024.  The new permanent shelters will focus on addressing specific groups including youth, families, and Indigenous populations with program models tailored to help clients meet their goals and create capacity to transition out of temporary sites. The second stream is the carefully managed transition plan for the COVID-19 shelter sites, with a focus on renewing existing leases and contracts to ensure stability until the new permanent shelter sites are operational. The extension of leases and contracts will focus on providing multi-year stability to shelter capacity, and to realize cost savings or cost avoidance. The third stream is the continued coordination with the Housing Secretariat on the HousingTO 2020-2030 Action Plan as a mechanism to manage the demand for shelter by providing affordable and supportive housing outcomes to transition people out of the shelter system, or to avoid entry into homelessness all together.

 

This report also requests authority to amend ten (10) non-competitive blanket contracts and two (2) competitive blanket contracts, established to support temporary shelter operations in hotels. This includes contracts for Infection Prevention and Control, custodial, and catering services.

Date
2024-02-07 12:30 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
23-2
Status
Carried
Date
2024-02-07 12:29 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
21-4
Status
Carried
Date
2024-02-07 12:27 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
25-0
Status
Carried
Feb 7, 2024
2024.IE10.1

Administrative Penalty System for Red Light Camera and Automated Speed Enforcement Violations

The purpose of this report is to provide City Council with an overview of the governance and administrative requirements to expand the City of Toronto's Administrative Penalty System to include Red Light Camera and Automated Speed Enforcement violations effective November 1, 2024. The report requests City Council approval of several recommendations to establish an expanded Administrative Penalty System. Under the Highway Traffic Act and Ontario Regulation 355/22: Administrative Penalties for Contraventions Detected Using Camera Systems, the City can establish an administrative penalty and dispute resolution process for specific Highway Traffic Act violations issued through camera systems.

 

This report responds to City Council's direction through Item 2022.IE27.8 – Update on Vision Zero Management Strategy and Related Initiatives to report back to the Infrastructure and Environment Committee with an update and any necessary recommendations to give effect to the operation of an Administrative Penalty System for the Red Light Camera and Automated Speed Enforcement programs.

 

Adopting an administrative penalty structure for Red Light Camera and Automated Speed Enforcement disputes will move forward Vision Zero, increase public safety, and increase efficient dispute resolution with the additional benefit of allowing more efficient use of limited court time in provincial courts. It will also allow the City to better manage the addition of cameras to both programs as per Council's direction, while maintaining a speedier dispute resolution timeline.

 

The Administrative Penalty System expansion project includes the procurement of a new adjudicative case management technology solution. The acquisition of a modern, robust, scalable, and versatile technology solution is necessary and will ensure the long-term viability of the City's Administrative Penalty System. The current case management system for parking violations is the Parking Tag Management System. This system was modified in 2017 to temporarily support the program and cannot be further modified to support expanded Administrative Penalty System operations. A new technology solution will allow for the efficient administration and management of administrative penalties for automated speed enforcement, red light camera, and parking and will allow for any future needed expansion of the Administrative Penalty System. Capital funding for a case management solution to replace the Parking Tag Management System has already been approved by Council through the capital budget.

Date
2024-02-07 10:16 AM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
26-0
Status
Carried
Feb 6, 2024
2024.EX11.7

Finch West Light Rail Transit: Train Operating and Services Term Sheet

The Finch West Light Rail Transit is an 11-kilometre light rail transit line that will run along the surface of Finch Avenue West between the existing Finch West Subway Station and the new Humber College Station, with 18 stops that will link to Line 1 (Yonge-University line), Toronto Transit Commission (TTC) buses, as well as GO Transit, MiWay, Viva, and Zum transit services. The Province, through their agency Metrolinx, has ownership of the Finch West Light Rail Transit and is funding the construction and delivery of the project, as established by the 2012 Light Rail Transit Master Agreement.[1] As per the Master Agreement, the City is responsible for funding operations and day-to-day maintenance (i.e., non-lifecycle maintenance) of the Finch West Light Rail Transit and the TTC is responsible for operating the Finch West Light Rail Transit. The City will be reimbursed for annual operating funding over three years beginning in 2024 for the Finch West Light Rail Transit through the Ontario-Toronto New Deal. At this time, Metrolinx anticipates that the Finch West Light Rail Transit will achieve Substantial Completion and be ready for revenue service operation by the end of 2024.

 

A clear understanding and agreement between the City, TTC and Metrolinx on the operating procedures, funding obligations, approvals, dispute resolution and decision-making processes is critical to the successful implementation and operation of the Finch West Light Rail Transit. This report recommends terms negotiated by the City and TTC with Metrolinx that expand on the terms of the 2021 Revised Agreement in Principle[2]. The terms in this report outline the details that will govern the City’s funding obligations, the TTC’s operating performance and maintenance requirements, revenue and payment processes, renewal and dispute terms, and processes for resolving non-fulfillment of obligations. As such, this report seeks City Council authority for City staff to execute the Finch West Light Rail Transit Train Operating and Services Agreement with the TTC and Metrolinx, based on the key terms identified in this report and set out in Attachment 1. Should City Council approve the recommendations in this report, the Train Operating and Services Agreement is expected to be executed in the first quarter of 2024.


[1] https://www.toronto.ca/legdocs/mmis/2012/cc/bgrd/backgroundfile-53862.pdf
[2] https://www.toronto.ca/wp-content/uploads/2021/08/9672-revised-ontario-toronto-agreement-in-principle-2021.pdf

Date
2024-02-06 17:21 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
25-0
Status
Carried
Feb 6, 2024
2024.EX11.1

Municipal Non-Resident Speculation Tax on Foreign Buyers of Residential Property

As part of the Updated Long-Term Financial Plan considered in September 2023, City Council directed staff to report back with an implementation plan to introduce a new land transfer tax on foreign buyers of residential property in the City. This report recommends introduction of a new Municipal Non-Resident Speculation Tax on foreign buyers of certain residential property, effective January 1, 2025.

 

The primarily objective of the Municipal Non-Resident Speculation Tax is to safeguard and enhance the availability of residential housing supply and to maintain a level of affordability in the residential real estate market by discouraging international buyers from purchasing property in the City of Toronto, particularly those buyers who do not intend to live in the property, or where the purchase is for purely speculative motives. Staff are recommending introduction of a 10% rate on the residential purchase price, which, when coupled with other land transfer tax related impacts, is expected to effectively deter real estate speculation.

 

The Province of Ontario currently levies its own Non-Resident Speculation Tax of 25% of the purchase price on the purchase or acquisition of an interest in certain residential property located anywhere in Ontario by foreign entities (individuals who are not citizens or permanent residents of Canada and foreign corporations) and taxable trustees. Originally implemented in 2017, the purpose of the provincial Non-Resident Speculation Tax was to discourage speculation and thereby 'help to address unsustainable demand' in the Greater Golden Horseshoe area.

 

To ensure successful implementation, it is recommended that the Municipal Non-Resident Speculation Tax mirror the current provincial Non-Resident Speculation Tax provisions, as outlined further in this report, as it pertains to applicability, rebates, refunds and exemptions. Implementation is being recommended for January 1, 2025, in recognition of a current federal Prohibition on the Purchase of Residential Property by Non-Canadians Act which temporarily bans the purchase of homes by foreign buyers from January 2023 to December 2024.

 

Overall, the introduction of the Municipal Non-Resident Speculation Tax is expected to have a positive impact on reducing speculation, and where speculation may persist the Municipal Non-Resident Speculation Tax will positively contribute to the City's multi-year budgeting strategy.. Preliminary estimates indicate the City may generate up to $15 million in revenue in 2025, following the lifting of the federal ban.  These estimates have been reflected in the City's enhanced multi-year budget modelling introduced as part of the 2024 budget process and are intended to offset one-time bridging actions applied to the 2024 budget.

 

In addition, the New Deal Agreement with the Province identified the Non-Resident Speculation Tax as a key opportunity for the City and the Province to strengthen alignment of incentives to help ensure availability of housing to residents. Staff will continue to engage in discussions with the Province to promote alignment between the Non-Resident Speculation Tax and Municipal Non-Resident Speculation Tax, among other financial-related incentives, while monitoring any potential impacts of the federal ban in order to refine estimated impacts for 2025.

Date
2024-02-06 16:46 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
24-1
Status
Carried
Feb 6, 2024
2024.DM14.2

Balanced Approach to Distributing Legislative Meeting Materials

  • City Councillors discussed challenges with managing agenda items and documents.
  • The Clerk’s Meeting Portal is helpful but not suitable for all members.
  • The practice of providing printed materials was stopped during the pandemic but continued without consultation.
  • Staff have spent significant time preparing printed materials for meetings.
  • There is a need for a balanced approach that considers accessibility and reduces screen time.

Decisions and Recommendations

  • Councillor Chris Moise, supported by Amber Morley, recommended that:
    1. The City Clerk should survey Council members about their needs for printed materials.
    2. Findings, proposals, budget implications, and implementation options should be reported as part of the 2024 Budget process.
  • City Council did not adopt Item DM14.2 on February 6 and 7, 2024.
AI Generated
Date
2024-02-06 16:25 PM
Motion
Adopt Item
Vote
No
Decision body
City Council
Total
10-15
Status
Lost
Date
2024-02-06 16:13 PM
Motion
Amend Item
Vote
No
Decision body
City Council
Total
3-20
Status
Lost
Date
2024-02-06 16:11 PM
Motion
Amend Item
Vote
No
Decision body
City Council
Total
10-12
Status
Lost
Feb 6, 2024
2024.DM14.1

Reimbursement of Cities Forum 2023 Conference Expenses, Torino, Italy

  • The meeting involved discussions about travel expenses incurred by City Councillor Nick Mantas.
  • Councillor Mantas attended the Cities Forum 2023 in Torino, Italy, with his Chief of Staff in March 2023.
  • Due to unforeseen circumstances, they missed their return flight, leading to additional costs exceeding $7,000.
  • According to the Constituency Services and Office Budget Policy, expenses over $7,000 require City Council approval.

Decisions and Recommendations

  • City Council approved the reimbursement of travel expenses for Councillor Mantas and his Chief of Staff.
  • The expenses will be covered by the Member’s Constituency Services and Office Budget.
  • City Council directed the City Clerk to review travel provisions for Members' staff as part of a report on Council travel scheduled for the third quarter of 2024.
AI Generated
Date
2024-02-06 15:24 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
21-3
Status
Carried
Date
2024-02-06 15:23 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
23-1
Status
Carried
Feb 6, 2024
2024.EX11.8

RapidTO: Surface Transit Network Plan

While the majority of transit planning efforts in the City of Toronto are focused on higher-order transit initiatives, bus and streetcar routes provide transit services across most parts of the city as complements to, and extensions of, the higher-order transit network. Currently, 70 percent of all Toronto Transit Commission journeys include a surface transit trip.

 

Improving the reliability of bus and streetcar transit supports the City's priority of keeping Toronto moving. A reliable surface transit network is essential to enable people to move around the city and access employment, business/retail, education and recreational/cultural facilities, particularly for Neighbourhood Improvement Areas and equity-deserving communities. Improving transit services in the inner suburbs is a key recommendation of the City of Toronto’s Poverty Reduction Strategy. Supporting transit reliability is critical for meeting the City’s TransformTO Climate Action Strategy’s goal of 75 percent of trips under a 5 kilometres area walked, biked, or by transit by 2030.

 

The Official Plan identifies that “recognizing their importance, the network of bus and streetcar routes will be enhanced to improve service reliability and travel times by reducing interference from other road traffic through the implementation of transit priority measures, and by improving operational efficiency and rider convenience by such means as providing more frequent service.”

 

The Surface Transit Network Plan aims to create a comprehensive network of surface transit priority corridors along arterial roads through the use of tools such as reserved lanes, intersection and signal improvements and customer comfort improvements at transit stops to prioritize public transit in the City's road network. The Surface Transit Network Plan was referred to as the RapidTO: Surface Transit Network Plan during the consultation process.

 

This report seeks City Council endorsement in principle of the overall Surface Transit Network Plan, provides a status update on four projects where roadway-specific studies have been completed or initiated, seeks City Council endorsement of the initiation of three (3) additional roadway-specific studies in the near-term (2024-2025), and responds to a related request from Infrastructure and Environment Committee.

 

Staff from Transportation Services, City Planning and the Toronto Transit Commission worked collaboratively to develop the Surface Transit Network Plan with consideration for roadways identified in the City of Toronto Official Plan's Surface Transit Priority Network (Map 5), the Toronto Transit Commission's 5-Year Service Plan and 10-Year Outlook, as well as other bus and streetcar routes with more than 20,000 daily riders.

 

In developing the plan, feedback was received from over 7,100 participants over two phases of consultation with local community representatives and the public:

 

In Phase 1 (October to November 2021), participants were asked to rate and provide feedback on the importance of evaluation criteria in selecting bus and streetcar roadways to prioritize. There was overall support for the initial evaluation criteria presented, and a new criterion for connectivity to Major Destinations was added as a result of the consultation feedback.

 

In Phase 2 (March to April 2022), participants were asked to provide feedback on the list of roadways to be prioritized over the next ten years. Overall, participants expressed support for the initial twenty (20) roadways. Many survey respondents expressed support for accelerated implementation and some frustration about the need to undertake more studies for individual roadways.

 

Assessment of technical data and public input helped inform the identification, evaluation, and prioritization of 47 candidate roadways for surface transit improvements. As a result, twenty (20) priority roadways have been identified to be included in the Surface Transit Network Plan over the next ten years. Attachment 1 shows the location of the Surface Transit Network Plan priority roadways, along with the 27 candidates for long-term planning studies across the City of Toronto.

 

Corridors identified for roadway-specific studies will be subject to further feasibility analysis to determine suitable surface transit priority measures and development of design options. Public consultation for each corridor will strive to engage residents and local community groups through online and in-person consultation activities, where possible. Staff will work with Councillors' offices to identify key groups, such as residents, businesses and other community representatives, that should be included in outreach and notification efforts. The public will have an opportunity to review and provide feedback on proposed design options.

 

Confirmation of the preferred design will be developed with both technical

analysis and community input. The preferred option would be recommended in an

implementation report to the appropriate Committee for Council approval,

before proceeding to implementation.

 

As previously directed by Council, there are four (4) projects where roadway-specific studies have been completed or initiated associated with the Surface Transit Network Plan: Eglinton Avenue East, Jane Street, Steeles Avenue, and Victoria Park Avenue. This report contains updates on each of these studies.

 

Subject to City Council approval of the Surface Transit Network Plan, three (3) additional roadway-specific studies are proposed to be initiated in the near-term (2024-2025) to move forward on feasibility study, design, and community consultation for the following roadways:

 

- Finch Avenue East between Victoria Park Avenue and McCowan Road;

- Dufferin Street between Wilson Station and Dufferin Gate; and

- Lawrence Avenue East between Victoria Park Avenue and Morningside Avenue. Transit signal priority and improving accessibility at bus stops will be considered east of Morningside Avenue.

 

Finch Avenue East, Dufferin Street, and Lawrence Avenue East were identified as priority corridors in Toronto Transit Commission’s 5-Year Service Plan and 10-Year Outlook. Dufferin Street and Lawrence Avenue East were identified as high priority corridors under the Surface Transit Network Plan evaluation framework. The above referenced sections of these roadways are being recommended for near-term study to leverage potential opportunities for delivery as part of upcoming capital projects. Initiation of feasibility studies for the remaining segments of Finch Avenue East and Lawrence Avenue East will be considered at a future time.

 

Each roadway-specific study will require two to three years to undertake feasibility study, design, and community consultation prior to seeking City Council approval for implementation of the proposed changes which will include a phased approach to accelerate implementation of shorter segments of the roadway, where possible.

 

While the Surface Transit Network Plan looks at delivering large scale surface transit improvements on priority roadways, there are other concurrent programs that aim to implement localized transit priority measures city-wide to enhance service.  Actions include:

 

- Delivering up to 12 stand alone queue jump lanes in the next 5 years;

- Implementing transit signal priority to 50 locations annually; and

- Implementing targeted regulatory measures at 10 locations per year.

 

More information about these actions along with other transit improvements will be presented in the Toronto Transit Commission’s 5-Year Service and Customer Experience Action Plan to be submitted to the Toronto Transit Commission Board in the first quarter of 2024.

 

In partnership with Toronto Transit Commission and City Planning, Transportation Services will report to the appropriate Committee and City Council at key milestones as part of the implementation of the Surface Transit Network Plan.

Date
2024-02-06 14:56 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
23-3
Status
Carried
Date
2024-02-06 14:55 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
22-4
Status
Carried
Date
2024-02-06 14:53 PM
Motion
Amend Item (Additional)
Vote
No
Decision body
City Council
Total
9-17
Status
Lost
Feb 6, 2024
2024.EY10.5

4884-4896 Dundas Street West - Official Plan Amendment and Zoning By-law Amendment Application - Appeal Report

On April 28, 2022, a combined Official Plan Amendment and Zoning By-law Amendment application was submitted for a development at 4884-4896 Dundas Street West to permit a 12-storey mixed-use building containing 225 residential units and 1214 square metres of retail space at-grade. The heritage building on the site is proposed to be retained and relocated. A revision was submitted on June 15, 2023 to permit a 29-storey mixed-use building containing 395 residential units and a total of 1322 square metres of at-grade retail space along Dundas Street West. The revision continues to retain the heritage building within the site but proposes to move it entirely out of the public right-of-way.

 

On June 23, 2023, the applicant appealed the application to the Ontario Land Tribunal citing City Council's failure to make a decision on the application within the time period prescribed under the Planning Act. The site is also the subject of an associated application for Site Plan Control approval, which has not been appealed. A Case Management Conference was held on September 28, 2023 (OLT Case OLT-23-000654). City staff require direction from City Council in advance of the next Case Management Conference scheduled for the week of February 19, 2024. An Ontario Land Tribunal hearing has been scheduled from June 17 to 21, 2024.

 

This report recommends that Council direct the City Solicitor, together with appropriate City staff, to attend the Case Management Conference and any future Ontario Land Tribunal hearing to oppose the application in its current form and to continue discussions with the applicant to resolve outstanding issues.

Date
2024-02-06 10:34 AM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
24-0
Status
Carried
Feb 6, 2024
2024.MM14.17

717 - 733 Mount Pleasant Road - Request for City Solicitor to Attend at the Ontario Land Tribunal

  • The City Council meeting addressed the minor variance application for 717 – 733 Mount Pleasant Road.
  • The application was submitted by Rockport (MPE) Inc. to modify a previous Zoning By-law amendment.
  • The Ontario Land Tribunal will hear the case on March 22, 2024, following a refusal by the Committee of Adjustment.
  • Planning staff collaborated with the applicant to modify the application based on community planning reports.

Decisions and Recommendations

  • City Council directed the City Solicitor to attend the Ontario Land Tribunal with necessary staff or consultants.
  • The goal is to ensure the Tribunal imposes City staff’s recommendations if the variance is approved.
  • City Council will oppose the application if further revisions are made that lack staff support.
  • The City Solicitor is authorized to negotiate a resolution regarding the appeal, consulting with relevant officials as needed.
AI Generated
Date
2024-02-06
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
25-0
Status
Carried
Jan 29, 2024
2024.PH9.14

Fraternities should not be exempt from the Multi-Tenant Housing Bylaw

  • The City Council meeting discussed fraternity and sorority residences in Ward 11.
  • These residences accommodate four or more students and are currently unregulated.
  • The Multi-tenant House Licensing By-law will take effect in April 2024 to ensure safe living conditions.
  • Previous attempts to regulate these residences were halted due to lack of consultation.
  • Ongoing issues with neighbor conflicts and compliance were reported by residents.

Decisions and Recommendations

  • Councillor Dianne Saxe recommended that the Executive Director of Municipal Licensing and Standards report on applying the Multi-tenant House Licensing By-law to fraternity and sorority residences at the February 2024 Planning and Housing Committee meeting.
  • A second report is to be prepared for Q2 2025 regarding the regulation of co-operative student residences.
  • The Planning and Housing Committee did not adopt the amended item PH9.14 related to these recommendations.
AI Generated
Date
2024-01-29
Motion
Adopt Item as Amended
Vote
Absent
Decision body
Planning and Housing Committee
Total
1-5
Status
Lost
Jan 19, 2024
2024.SC10.5

54-62 Glen Everest Road - Rental Housing Demolition Application - Decision Report - Approval

The application proposes to demolish three three-storey apartment buildings containing 68 rental units located at 54 to 62 Glen Everest Road. The 68 rental units are proposed to be replaced as part of the new 12-storey building comprised of 414 dwelling units.

 

The properties are also the subject of a Zoning By-law Amendment application (21 134156 ESC 20 OZ), which was appealed to the Ontario Land Tribunal. The Ontario Land Tribunal issued a written decision on August 11, 2023, approving the Zoning By-law Amendment in principle, with the final order being withheld until all outstanding matters, including the necessary agreements with the City, are secured, including the rental housing matters.

 

This report recommends approval of the Rental Housing Demolition application under Chapter 667 of the Toronto Municipal Code and the Residential Demolition Permit under Chapter 363 of the Toronto Municipal Code, subject to conditions to replace the rental housing and provide Tenant Relocation and Assistance.

Date
2024-01-19
Motion
Without Recommendations
Vote
Yes
Decision body
Scarborough Community Council
Total
3-2
Status
Carried
Jan 19, 2024
2024.SC10.3

2031 Kennedy Road - Zoning Amendment Application - Decision Report - Approval

This application proposes to amend the former City of Scarborough South Agincourt Employment Districts Zoning By-law 24982 to permit additional commercial uses while maintaining the current parking ratio at 2031 Kennedy Road. The application seeks to expand the permitted uses within the existing at grade commercial spaces to include restaurant, take-out restaurant, personal service shop, convenience store, medical/dental office and office uses.

  

The proposal is consistent with the Provincial Policy Statement (2020) and conforms with the Growth Plan (2020), while advancing Official Plan direction for Mixed Use Areas to encourage a broad range of commercial uses. The proposal incorporates additional commercial uses permitted under city-wide Zoning By-law 569-2013 into the site specific zoning by-law that regulates the subject lands.

 

This report reviews and recommends approval of the application to amend the former City of Scarborough Employment Districts Zoning By-law 24982, as amended, and to incorporate the site into the city-wide Zoning By-law 569-2013.

Date
2024-01-19
Motion
Adopt Item
Vote
Yes
Decision body
Scarborough Community Council
Total
4-0
Status
Carried
Dec 15, 2023
2023.BL13.1

Introduction of General Bills and Confirming Bills

  • The City Council held a meeting to discuss important legislative matters.
  • The focus was on introducing General Bills and Confirming Bills.

Decisions and Recommendations

  • City Council passed By-laws numbered 1222-2023 to 1332-2023.
  • The meetings for these decisions took place on December 13, 14, and 15, 2023.
AI Generated
Date
2023-12-15 15:46 PM
Motion
Introduce and Pass Confirmatory Bill
Vote
Yes
Decision body
City Council
Total
19-1
Status
Carried
Date
2023-12-15 15:45 PM
Motion
Introduce and Pass Confirmatory Bill
Vote
Yes
Decision body
City Council
Total
19-1
Status
Carried
Date
2023-12-15 15:43 PM
Motion
Introduce and Pass Confirmatory Bill
Vote
Yes
Decision body
City Council
Total
19-1
Status
Carried
Dec 15, 2023
2023.RM13.1

Call to Order

  • The City Council meeting was held on December 13, 2023.
  • The meeting began at 9:39 a.m. with the national anthem, "O Canada."
  • A moment of silence was observed to remember various individuals and victims of a recent terrorist attack.
  • Speaker Nunziata acknowledged the Indigenous Peoples of the land and emphasized the importance of improving relationships and understanding their cultures.
  • The meeting was conducted on the traditional territory of multiple nations, including the Mississaugas of the Credit.

Decisions and Recommendations

  • Speaker Nunziata called the meeting to order and addressed the Council.
  • The City Clerk posted all agenda materials online for public access.
  • Speaker Nunziata provided guidance on the rules regarding Points of Order and Points of Privilege, encouraging members to review them for proper conduct during the meeting.
  • Members will only be given the floor if they adhere to these established rules.
AI Generated
Date
2023-12-15 15:38 PM
Motion
Defer Item
Vote
Yes
Decision body
City Council
Total
18-1
Status
Carried
Date
2023-12-15 15:33 PM
Motion
Extend the Meeting
Vote
Yes
Decision body
City Council
Total
20-1
Status
Carried
Date
2023-12-14 20:54 PM
Motion
Extend the Meeting
Vote
Yes
Decision body
City Council
Total
15-6
Status
Carried
Date
2023-12-14 10:31 AM
Motion
Introduce Report
Vote
Yes
Decision body
City Council
Total
22-2
Status
Carried
Dec 15, 2023
2023.MM13.8

Reimbursement of Cities Forum 2023 Conference Expenses, Torino, Italy

  • The meeting involved a discussion about travel expenses incurred by Councillor Nick Mantas and his Chief of Staff.
  • The expenses were related to their attendance at the Cities Forum 2023 in Torino, Italy, in March 2023.
  • The total cost of the trip exceeded $7,000 due to a missed return flight and additional accommodation.
  • According to the City’s budget policy, expenses over $7,000 require City Council approval.

Decisions and Recommendations

  • Councillor Nick Mantas, supported by Councillor Jennifer McKelvie, recommended that the City Council approve the reimbursement of travel expenses from the Constituency Services and Office Budget.
  • City Council decided to defer the discussion of this item (MM13.8) to the meeting scheduled for February 6, 7, and 8, 2024.
AI Generated
Date
2023-12-15 15:38 PM
Motion
Defer Item
Vote
Yes
Decision body
City Council
Total
18-1
Status
Carried
Date
2023-12-14 14:56 PM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
22-3
Status
Carried
Dec 15, 2023
2023.MM13.24

Conveyance of Parkland - 2150 and 2194 Lake Shore Boulevard West and 23 Park Lawn Road

  • The City Council meeting discussed the phased mixed-use development at 2150 and 2194 Lake Shore Blvd and 23 Park Lawn Road.
  • This development includes 7500 residential units, affordable housing, parkland, a new GO station, and community facilities.
  • There are construction constraints in Phases 2 and 3 that require delaying parkland conveyances until the last building's occupancy.
  • The delay aims to minimize disruption during construction and allow the use of future parkland for staging.

Decisions and Recommendations

  • City Council approved the conveyance of parkland to the City prior to the registration of the condominium or first occupancy of specific towers.
  • For Phase 2, a local park of at least 2,500 square meters must be conveyed.
  • For Phase 3, a community park of at least 10,000 square meters must be conveyed.
  • Both parkland dedications must meet specific improvement requirements and satisfy city officials.
AI Generated
Date
2023-12-15 15:37 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
21-0
Status
Carried
Dec 15, 2023
2023.MM13.14

8-26 Jopling Avenue South - Request for City Solicitor to Attend at the Toronto Local Appeal Body

  • The meeting discussed an application for variances from Site-Specific By-law 187-2022.
  • The applicant proposed changes to a mixed-use development with two towers and increased dwelling units.
  • The Committee of Adjustment approved the variances with conditions, including a cash contribution.
  • City Planning Staff expressed concerns about some variances related to height, floor area, and amenity space.

Decisions and Recommendations

  • Councillor Stephen Holyday recommended that the City Solicitor appeal the Committee of Adjustment’s decision.
  • The City Solicitor was also recommended to retain outside consultants as needed.
  • The City Solicitor was authorized to negotiate a resolution regarding the application and resolve the matter at their discretion.
  • City Council did not adopt Motion MM13.14 during the meeting on December 13, 14, and 15, 2023.
AI Generated
Date
2023-12-15 15:32 PM
Motion
Adopt Item
Vote
No
Decision body
City Council
Total
3-17
Status
Lost
Dec 15, 2023
2023.PH8.23

Supporting Purpose Built Rental Homes in Etobicoke North

65 Rexdale Blvd. has been home to the International Muslim Organization’s (IMO) mosque
since 1994. It has been used as and will remain as a place of worship by a large and committed congregation.

 

The City of Toronto is in the midst of a housing crisis. The City has pledged to build 285,000 homes by 2021. The IMO seeks to redevelop their site to construct a new, nine storey residential rental building with approximately 220 rental units, a new publicly accessible park and to rebuild the mosque. Twenty to thirty percent of the units will be affordable pursuant to CMHC guidelines.

 

This site is appropriate for a mixed use development as it is across the street from another multi-residential building and a short walk to community amenities such as Toronto Public Library’s Northern Elms branch, a pharmacy, a bank, and a variety of large-format retail stores. 65 Rexdale Blvd. is also in proximity to properties used for light industrial activity, such as logistics firms, that in other contexts could be viewed as a transition area to mixed use development.

 

This is a request for a Minister’s Zoning Order (MZO) to permit a mixed use development.
As such, site plan approval would continue to be required to review the proposal against functional servicing, transportation, and other technical compliance requirements. City staff held a pre-application meeting with the proponent’s representatives earlier this year. An MZO would bypass the required City approvals to permit the proposed uses on the site. Requiring site plan approval would allow City staff and the proponent to work collaboratively to identify necessary interventions to meet City requirements, including the necessary noise studies to mitigate from noise generated by Pearson International Airport.

Date
2023-12-15 15:24 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
17-4
Status
Carried
Dec 15, 2023
2023.ST4.1

Council Member Appointments to the City-School Boards Advisory Committee

The purpose of this report is to recommend to City Council the appointment of Council Members to the City-School Boards Advisory Committee.

Date
2023-12-15 15:17 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
21-0
Status
Carried
Dec 15, 2023
2023.MM13.35

Re-Opening and Amending Item MM11.34 - Opening City Hall - Regarding the Terms of Reference for the City-School Boards Advisory Committee

  • The City Council meeting focused on the City-School Boards Advisory Committee.
  • Consultation was held with Toronto's French-language school boards.
  • The goal is to establish the committee before the new year.

Decisions and Recommendations

  • City Council approved changes to the Terms of Reference for the City-School Boards Advisory Committee.
  • The number of City Council members on the committee will be reduced from four to two.
  • The requirement for representation from each of Toronto's four Community Councils was removed.
  • One trustee will be appointed from each of the Conseil scolaire Viamonde and the Conseil scolaire catholique MonAvenir.
  • The new committee composition will include up to seven members, including various trustees and two City Council members.
AI Generated
Date
2023-12-15 15:15 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
21-0
Status
Carried
Date
2023-12-15 14:19 PM
Motion
Introduce Motion without Notice
Vote
Yes
Decision body
City Council
Total
22-0
Status
Carried
Dec 15, 2023
2023.CC13.10

250 Wincott Drive and 4620 Eglinton Avenue West - Authority to Amend Section 37 Agreement to Reflect the Minor Variance Decision of the Committee of Adjustment

  • The City Council meeting took place on December 13, 14, and 15, 2023.
  • It addressed the development of lands at 250 Wincott Drive and 4620 Eglinton Avenue West.
  • A minor variance application was approved by the Committee of Adjustment on November 9, 2023, requiring amendments to the existing Section 37 Agreement.

Decisions and Recommendations

  • City Council authorized officials to amend the Section 37 Agreement to reflect new timelines for municipal infrastructure improvements.
  • The City Solicitor was authorized to make necessary amendments for implementation.
  • City Council amended the Municipal Code to prevent parking permits for residents and visitors of the development.
  • Conditions for Site Plan approval were set, including advisories for purchasers regarding parking eligibility and availability.
  • City Planning and the Applicant were requested to prioritize pedestrian sidewalks along Eglinton Avenue and connect the site with public streets.
AI Generated
Date
2023-12-15 15:13 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
20-1
Status
Carried
Date
2023-12-15 15:12 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
17-4
Status
Carried
Dec 15, 2023
2023.IE9.3

Update and Action Plan on the Single-Use and Takeaway Items Reduction Strategy, including the Circular Food Innovators Fund

This report presents an update on waste reduction initiatives from the Solid Waste Management Services Division (Solid Waste). The report proposes a new Single-Use and Takeaway Items Bylaw (SUTI Bylaw) applicable to retail business establishments as part of Stage 2 of the Single-Use and Takeaway Items Reduction Strategy (Reduction Strategy).

 

The proposed Single-Use and Takeaway Items Bylaw includes the following mandatory activities by a retail business establishment operator:

 

- confirm a customer needs a single-use accessory food item prior to distribution;

- confirm a customer needs a paper shopping bags prior to distribution;

- charge customers a minimum amount for a reusable shopping bag, with the minimum amount to increase one year following the proposed SUTI Bylaw comes into force;

- accept the use of reusable shopping bags by a customer;

- confirm a customer needs a single-use beverage cup prior to distribution; and

- accept the use of a reusable beverage cup by a customer.

 

Table 1. Summary of Single-Use and Takeaway Items Bylaw and proposed implementation timeline

 

Targeted Items

Proposed Implementation Date of Mandatory Measures, Post-Adoption by City Council  

March 1, 2024

May 1, 2024

May 1, 2025

Single-Use Accessory Food Items

Ask-First/By-Request

 

 

Paper Shopping Bags

Ask-First/By-Request

 

Compatibility

   

Reusable Shopping Bags

Mandatory Acceptance

Minimum Amount Charged - $1.00

Minimum Amount Charged - $2.00

Single-Use Beverage Cups

Ask-First/By-Request

 

 

Reusable Beverage Cups Provided by Customers

Mandatory Acceptance

 

 

 

This report also responds to City Council's direction to advise on options to incentivize businesses to reduce single-use and takeaway items by proposing a new business grant program, the Circular Food Innovators Fund (CFIF). This report outlines Phase One of the Circular Food Innovators Fund, which focuses on supporting businesses to implement reuse systems that eliminate single-use and takeaway items.

 

Lastly, the report outlines next steps for Stage 3 of the Reduction Strategy, to further explore measures targeted towards the use of reusable items and the further reduction of single-use and takeaway items, in addition to next steps for the second phase of the Circular Food Innovators Fund.

 

Please note that in advance of the Infrastructure and Environment Committee meeting scheduled for November 29, 2023, Solid Waste staff will provide a supplemental report that provides an update as it relates to the recent decision issued on November 16, 2023, by the Federal Court in Responsible Plastic Use Coalition v. Canada (Environment and Climate Change) regarding the constitutionality of the Government's current approach to banning single-use plastics. The report will also address the impacts, if any, to the Single-Use and Takeaway Items Bylaw proposed in this report that may result from the decision.

Date
2023-12-15 15:07 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
23-0
Status
Carried
Date
2023-12-15 15:05 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
21-3
Status
Carried
Date
2023-12-15 15:04 PM
Motion
Amend Item (Additional)
Vote
No
Decision body
City Council
Total
21-3
Status
Carried
Dec 15, 2023
2023.MM13.11

Renaming the Stadium at Centennial Park

  • The City Council meeting focused on recognizing the late Rob Ford's contributions.
  • Rob Ford served nearly 15 years on Toronto City Council and was the Mayor for 4 years.
  • His dedication to his community and passion for football were highlighted.
  • The discussion coincided with the reimagining of Centennial Park as per the approved Master Plan.

Decisions and Recommendations

  • City Council approved the renaming of the Centennial Park Stadium to "Rob Ford Stadium."
  • This decision was made despite the existing City of Toronto Naming Policy.
  • The Acting General Manager of Parks, Forestry and Recreation is tasked with designing and installing new signage for the stadium, also waiving relevant policy provisions.
AI Generated
Date
2023-12-15 14:17 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
17-6
Status
Carried
Date
2023-12-15 14:16 PM
Motion
Amend Item (Additional)
Vote
No
Decision body
City Council
Total
5-18
Status
Lost
Date
2023-12-15 14:15 PM
Motion
End Debate
Vote
Yes
Decision body
City Council
Total
18-4
Status
Carried
Date
2023-12-14 14:59 PM
Motion
Waive Referral
Vote
Yes
Decision body
City Council
Total
19-6
Status
Carried
Dec 15, 2023
2023.MM13.13

Crisis Looms as Aging Booms: Creating a Path Forward to Age in Place

  • The City Council meeting focused on the need to support seniors in aging in place rather than institutionalizing them.
  • A Naturally Occurring Retirement Community (NORC) is a residential area with a high concentration of older adults, which can enhance their independence and well-being.
  • Toronto's senior population is growing, with projections indicating that by 2041, over 21% of residents will be 65 or older.
  • There is a pressing need for innovative housing models and coordinated services to assist this demographic.

Decisions and Recommendations

  • City Council adopted a request for the Government of Canada to create a national strategy for NORCs.
  • A call for long-term funding from provincial and federal governments to support NORC infrastructure and programming was made.
  • The Province of Ontario was urged to streamline home care services in NORCs.
  • The City Manager was tasked with developing a comprehensive NORC strategy by late 2024, including collaboration with health networks and enhancing community resources.
  • Recommendations were made to incorporate aging-in-place strategies into the Toronto Seniors Strategy 3.0.
AI Generated
Date
2023-12-15 13:26 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
21-0
Status
Carried
Date
2023-12-15 13:25 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
22-0
Status
Carried
Dec 15, 2023
2023.PH8.3

Housing Action Plan: Zoning By-law Simplification and Modernization for Low-rise Residential Zones - Phase 1 Final Report

This report recommends changes to Zoning By-law 569-2013 (‘the city-wide Zoning By-law’) to be advanced as part of the first phase of work to simplify and modernize low-rise residential zoning regulations. The recommended zoning amendments would remove barriers, ease administration, and enable the creation of more housing as part of the Housing Action Plan to achieve or exceed the provincial housing target of 285,000 new homes over the next 10 years.

 

As described in the June 19, 2023 Proposals Report (Item PH5.5), this study organizes proposed changes by three key themes: ‘simplification’, ‘harmonization’, and ‘modernization’.

 

The recommended ‘simplification’ zoning changes advanced in this report include updating and clarifying zoning regulations for multiple secondary suites in one building in the R zone to reduce confusion, and clarify the distinction between secondary suites, multiplexes and low-rise apartment buildings. This includes the introduction of new conversion regulations to preserve existing permissions that allow detached houses and semi-detached houses to be converted to contain multiple units.

 

The recommended ‘harmonization’ zoning changes would align regulations, such as main wall height provisions for flat roof buildings between building types (i.e., detached and semi-detached houses) and across zones to ensure a consistent approach to city-wide performance standards for buildings of a similar scale, while enabling a diversity of architectural styles. Additional recommended zoning changes include a harmonization of performance standards in the R zone for low-rise apartment buildings with those for multiplexes to facilitate conversions and remove barriers to creating low-rise apartment buildings where they are already permitted.

 

The ‘modernization’ changes identified in the Proposals Report included exploration of alternative approaches to regulating building area (Floor Space Index (FSI)) and moving the city-wide Zoning By-law towards a more form-based approach focusing on the external characteristics of a building. Through consultation, additional considerations have been identified and further analysis is necessary before a preferred approach to zoning changes can be recommended. Staff will continue this analysis and consultation and report back on potential approaches in Q4 2024.

 

The recommended zoning changes in this report respond to provincial policy changes to the Planning Act (Bill 23) and have been informed by review of best practices in comparable jurisdictions in Ontario, Canada, and North America, ongoing stakeholder engagement, and integration with other zoning and policy modernization initiatives such as the Expanding Housing Options in Neighbourhoods (EHON) initiative.

Date
2023-12-15 13:23 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
21-1
Status
Carried
Dec 15, 2023
2023.IE9.5

Proposed Building Emissions Performance Reporting By-Law

Existing buildings are Toronto’s largest source of greenhouse gas emissions, accounting for approximately 58 percent of total community-wide emissions. The City’s Net Zero Existing Buildings Strategy focuses on reducing emissions from existing buildings with the ultimate target of achieving net zero emissions by 2040, and an interim target of cutting emissions nearly in half by 2030, relative to 2008 levels. Achieving these ambitious targets will require the City to take nine key actions identified in the Net Zero Existing Buildings Strategy.

 

Mandatory emissions performance standards for all existing buildings that will require improved emissions performance over time is the most critical of these actions to drive transformation. In the Updated Long-Term Financial Plan (2023.EX7.1), staff recommended the expedited introduction of a mandatory emissions performance standards by-law which is necessary to drive the scale and depth of emissions reductions in the buildings sector, including residential, commercial, industrial and institutional buildings in the City of Toronto.  Introduction of these requirements would establish the City of Toronto as a leader in its commitment to reducing building emissions and provide certainty to the development and retrofit sectors on actions needed to support emission reduction.  A critical step towards enabling the establishment of emissions performance standards for existing buildings is to require annual emissions performance reporting and public disclosure to improve property owners’ and the City's understanding of the performance of Toronto’s homes and buildings.  Ontario was the first jurisdiction in Canada to introduce energy benchmarking regulations, developed in consultation with Toronto and actualized through the provincial Energy and Water Reporting and Benchmarking program. Energy and Water Reporting and Benchmarking currently requires all buildings above 50,000 square feet to report their performance data on an annual basis.

 

This report proposes that City Council adopt a by-law that would require owners of large and medium-sized buildings to report building energy and water use data to the City annually (the “Building Emissions Performance Reporting” By-law or the “By-Law” as set out in Attachment 1). Energy and water use both have greenhouse gas impacts associated with them. The energy and water use information collected under the By-law will allow the City to calculate the greenhouse gas impacts associated with each property and building.

 

The Building Emissions Performance Reporting By-law would apply to all buildings 929 square meters (~10,000 square feet) and larger, which would predominantly include buildings from the commercial, multi-residential, institutional, and industrial sectors.  This size threshold is based on the total gross floor area for the building, including all energy and water used on the premises, regardless if metered in bulk or separately for uses or spaces within the building. For example, a small office building with about 30 to 60 employees or a small multi-residential building with 15 average-sized suites could have a gross floor area close to this lower limit.  Coverage of all buildings larger than this lower size threshold aligns with the direction adopted with the 2021 Net Zero Existing Buildings Strategy (2021.IE26.1) and is informed by feedback received during stakeholder engagement.

 

The By-law would phase-in compliance with buildings that have a gross floor area equal to or greater than 4,645 square meters (~50,000 square feet) being required to report as of the first business day of July 2024 (i.e. July 2, 2024) (these buildings are already required to report under Energy and Water Reporting and Benchmarking) and those with gross floor area equal to or greater than 929 square meters (~10,000 square feet) would begin reporting as of the first business day in July 2025 (i.e. July 2, 2025).   This 2025 reporting deadline for the smaller buildings (929 to 4,645 square meters in size) will give Environment and Climate Division time to work with utilities to ensure a streamlined reporting process, which is especially important for owners of properties with smaller buildings.

 

The impacts of the proposed By-law on property owners are non-monetary in nature. The cost associated with reporting stems from the time required to gather energy and water data and enter it into the City’s reporting tool.  This is a relatively small time-commitment, estimated at a few hours of time annually, per building.  A potential side effect of the Emissions Performance Reporting By-law could yield a possible energy cost savings by encouraging property owners to more closely track and better manage their buildings' energy and water use. 

 

Requiring property owners to report the energy and emissions performance of their buildings is critical to achieving the City's net zero by 2040 greenhouse gas emissions reduction target, both due to the greenhouse gas reduction benefits of reporting itself, and to reporting's role as a key enabling action that is needed to implement other critical greenhouse gas-reduction actions called for in the Net Zero Existing Buildings Strategy – notably, the establishment of emissions performance standards for existing buildings.

 

Reporting energy and water use enables property owners to track their buildings' energy, water and emissions performance and allows them to compare their buildings' performance over time, to other buildings in their portfolio, or to other buildings in Toronto.  If the old management adage "you can’t manage what you don’t measure" is true, then tracking, benchmarking, and reporting energy use is the first step towards better managing energy use and energy operating costs, and to improving building efficiency and energy and emissions performance.

 

Requiring property owners to report the energy and emissions performance of their buildings is also critical to enabling the City to implement subsequent key actions called for in the Net Zero Existing Buildings Strategy.  Receiving annual building greenhouse gas emission performance data will enable the City to design future by-laws around these subsequent key actions so that they reflect an ambitious yet realistic pace for property owners to achieve the 2040 net zero emissions target.  The most notable key action in this regard is establishing emissions performance standards for existing buildings, which will set limits on the amount of greenhouse gas emissions buildings can emit. The intent of establishing an emissions performance standard is to encourage building owners to make improvements to their buildings so that Toronto can achieve community-wide greenhouse gas emissions reductions which provide a benefit to all Torontonians. Environment and Climate Division staff plan to present a proposed bylaw that would require property owners to meet set emissions performance standards for their buildings (the "Building Emissions Performance Standards By-law") to Council in 2024 as directed by Council in the Long-Term Financial Plan.

Date
2023-12-15 13:22 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
19-4
Status
Carried
Dec 15, 2023
2023.IE9.1

Eastbound F.G. Gardiner Expressway and Northbound Don Valley Parkway Closures - 2024 Toronto Triathlon Festival

The purpose of this report is to seek City Council's authority to close portions of the eastbound lanes on the F.G. Gardiner Expressway and northbound lanes on the Don Valley Parkway for the Toronto Triathlon Festival event for 2024. The proposed route of the 2024 Toronto Triathlon Festival event will remain the same as 2023.

Date
2023-12-15 13:19 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
22-1
Status
Carried
Dec 15, 2023
2023.CC13.23

4174 Dundas Street West - Request for Directions

  • Meeting held on December 13, 14, and 15, 2023.
  • Discussion focused on a Zoning By-law Amendment for a 15-storey residential building with 117 units.
  • The application faced appeals at the Ontario Land Tribunal due to delays in decision-making.
  • City Council previously directed the City Solicitor to oppose the applications.
  • The upcoming hearing is scheduled for February 12, 2024, necessitating urgent decisions.

Decisions and Recommendations

  • City Council adopted the confidential instructions to staff as amended.
  • Authorized the public release of certain confidential documents.
  • Amended the Municipal Code to restrict parking permits for residents at 4174 Dundas Street West.
  • Accepted a settlement offer related to the applications and directed the City Solicitor to support it at the Ontario Land Tribunal.
  • Established conditions for the owner regarding infrastructure, environmental assessments, and site plan approvals.
  • Authorized necessary actions to implement the decisions.
AI Generated
Date
2023-12-15 13:18 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
20-1
Status
Carried
Date
2023-12-15 13:16 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
20-0
Status
Carried
Dec 15, 2023
2023.PH8.16

Amendments to Toronto Municipal Code Chapter 667: Rental Demolition and Conversion By-law

This report recommends that City Council amend Chapter 667 of the Toronto Municipal Code, the Residential Rental Property Demolition and Conversion Control By-law (“Chapter 667”), in response to recommendations made by the Auditor General respecting tenant access to affordable rental replacement housing based on financial need, and to improve administrative coordination with Toronto Municipal Code, Chapter 363 (Building Construction and Demolition) (“Chapter 363”) and to improve the clarity of the process for the public.

 

Chapter 667 prohibits the demolition or conversion of residential rental units in buildings containing six or more residential units, of which at least one is rental, without obtaining a permit from the City. This report advances proposed amendments, developed in consultation with Legal Services, which include:

 

· The requirement for owners of affordable rental replacement units to develop and implement an Access Plan, which includes the use of the City’s Centralized Affordable Rental Housing Access System upon operation of the system, along with income eligibility requirements;

 

· Streamlining the coordination efforts between Toronto Building and the City Planning with respect to the administration of different chapters of the Municipal Code; and

 

· Stylistic, technical and process updates to improve accuracy and clarity for the public, including changes to permitted conditions of approval for applications delegated to the Chief Planner to include tenant relocation and other assistance for impacted tenants.

 

The recommendations in this report build on recent staff efforts to standardize affordable rental housing eligibility requirements and to harmonize City Planning’s administration of affordable rental housing with the Housing Secretariat’s practices.

 

Staff recommend that City Council adopt the recommendations in this report and amend Chapter 667 in accordance with Attachment 1 to this report.

Date
2023-12-15 12:28 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
22-0
Status
Carried
Date
2023-12-15 12:26 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
22-0
Status
Carried
Dec 15, 2023
2023.EX10.12

Updates to the Constituency Services and Office Budget Policy

The purpose of this report is to recommend a revised Constituency Services and Office Budget Policy, renamed as the Members of Council Operations Policy.  The revised Policy will help to address several things that have changed since the policy was adopted in 2012.  These changes include updating the policy to include an ability for Members to expense home security installation and monitoring to the Council General Expense budget, making various changes to technology-related and transportation-related provisions, and improving flexibility to existing expense categories.  The overall goal of creating the revised Members of Council Operations Policy is to simplify and improve the readability of the policy and increase flexibility for Members in how they operate their office.

Date
2023-12-15 12:21 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
21-1
Status
Carried
Date
2023-12-15 12:19 PM
Motion
Amend Item
Vote
No
Decision body
City Council
Total
5-17
Status
Lost
Date
2023-12-15 12:18 PM
Motion
Amend Item (Additional)
Vote
No
Decision body
City Council
Total
3-19
Status
Lost
Dec 15, 2023
2023.MM13.32

Request for City Planning to Launch the Glencairn Subway Station Planning Study

  • The Marlee Avenue corridor is experiencing a surge in applications for new multi-residential buildings.
  • This increase is necessary for housing in Toronto but follows the restrictive Bill 23, limiting municipal planning powers.
  • The area faces heavy traffic and lacks essential community services like a community center, library, and daycares.
  • The Glencairn Subway Station Planning Study aims to address these infrastructure needs for a sustainable community.

Decisions and Recommendations

  • City Council directed the Chief Planner to issue a Request for Proposal for the Glencairn Subway Station Planning Study by the first quarter of 2024.
  • The study will identify necessary social and community infrastructure for future growth.
  • It will also assess traffic and transportation improvements in the Marlee and Lawrence Avenue West corridor to alleviate congestion and safety issues.
AI Generated
Date
2023-12-15 11:40 AM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
23-0
Status
Carried
Dec 15, 2023
2023.MM13.33

Display of 988 Crisis Line Information Poster

  • The City Council meeting addressed the adoption of 988, a national suicide and crisis hotline in Canada.
  • MP Todd Doherty requested the City of Toronto to support this initiative.
  • The proposal includes advertising the 988 suicide prevention poster in City-owned buildings.

Decisions and Recommendations

  • Councillor Paul Ainslie, supported by Councillor Jennifer McKelvie, recommended the following:
    1. City Council should recognize the importance of removing barriers for those in crisis.
    2. City Council should continue to support the 988 crisis line initiative.
    3. The 988 crisis line information poster will be displayed in all City-owned buildings.
  • City Council formally adopted these recommendations on December 13, 14, and 15, 2023.
AI Generated
Date
2023-12-15 11:39 AM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
23-0
Status
Carried
Dec 15, 2023
2023.NY9.4

55 Yeomans Road - Inclusion on the Heritage Register

This report recommends that City Council include the property at 55 Yeomans Road on the City of Toronto's Heritage Register for its cultural heritage value and interest.

 

Located on the northeast corner of Danby Avenue and Yeomans Road, south of Sheppard Avenue West, west of Bathurst Street, the subject property at 55 Yeomans Road comprises a Modernist style synagogue, known as the Beth David B’nai Israel Beth Am Synagogue, completed in 1959 to the designs of celebrated modernist Canadian architect Irving Grossman and artist Graham Coughtry.  

         

The Beth David B'nai Israel Beth Am Synagogue was identified in the North York Modern Inventory in 1997.

 

The property at 55 Yeomans Road has been researched and evaluated by staff using the criteria prescribed in Ontario Regulation 9/06 and meets one or more of the provincial criteria for determining cultural heritage value or interest and is believed to be of cultural heritage value or interest.

 

A municipal heritage register may include properties that have not been designated but Council believes to be of "cultural heritage value or interest", and that meet one or more of the provincial criteria for determining whether they are of cultural heritage value or interest. The Ontario Heritage Act (the Act) now also limits listing to a period of two years.

 

Properties on the Heritage Register will be conserved and maintained in accordance with the Official Plan's Heritage Policies. The listing of non-designated properties on the municipal heritage register also extends interim protection from demolition and provides an opportunity for City Council to determine whether the property warrants conservation through designation under the Act should a development or demolition application be submitted.

 

On January 1, 2023, amendments to the Act through the More Homes Built Faster Act, 2022 (Bill 23) came into effect. Under the Act, should a property be subject to an Official Plan Amendment, Zoning By-law Amendment and / or Draft Plan of Subdivision Application, properties must be listed on the Heritage Register prior to Part IV designation and before the occurrence of a "Prescribed Event". Heritage Impact Assessments are required for development applications that affect listed properties. 

Date
2023-12-15 11:36 AM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
23-0
Status
Carried
Date
2023-12-15 11:35 AM
Motion
Reconsider Item
Vote
Yes
Decision body
City Council
Total
22-1
Status
Carried
Date
2023-12-14 17:11 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
24-1
Status
Carried
Date
2023-12-14 17:09 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
24-0
Status
Carried
Dec 15, 2023
2023.GG8.14

Non-Competitive Contract with N. Barry Lyon Consultants for Multi-Tenant Housing Land Economics Study

The purpose of this report is to seek City Council authority to enter into a non- competitive contract with N. Barry Lyons Consultants for professional services to conduct a land economics study of the economic viability and impacts on residential property values of multi-tenant houses. The study also seeks to assess the economic viability of other residential units and housing types in comparison to multi-tenant houses under the new multi-tenant houses policy and regulatory framework. The expected term of the contract is anticipated to be for a period of 16 weeks commencing from the date of award and would end on March 31, 2024, with a value $48,500 net of all taxes and charges ($49,354 net of Harmonized Sales Tax recoveries).

 

In October 2021 and December 2022, through items 2021.PH25.10 and 2023.CC2.1, City Council directed the Chief Planner and Executive Director, City Planning, the Executive Director, Municipal Licensing and Standards, the Executive Director, Housing Secretariat, the Chief Communications Officer, the Executive Director, Toronto Building, and the Fire Chief and General Manager, Toronto Fire Services to report to Planning and Housing Committee on various matters throughout the implementation period for the new multi-tenant houses Regulatory Framework.

 

This direction includes reporting to Council on the results of a land economics study related to multi-tenant housing permissions as introduced, including their economic viability and impacts on residential property values, and the economic viability of other residential units and housing types in comparison to multi-tenant houses. As part of the overall implementation reporting work, City Planning proposes to retain N. Barry Lyon Consulting to complete the Land Economics Study through a non-competitive fixed price contract with a value of $48,500 ($49,354 net of harmonized sales taxes).

 

The proposed non-competitive procurement will cause the cumulative value of contracts between City Planning and N. Barry Lyon Consulting to exceed the staff authority threshold, as discussed below.

 

The Chief Planner and Executive Director, City Planning, entered into a contract with N. Barry Lyon Consulting in 2018 to provide professional services in land economics research and analysis to evaluate the financial impacts of a range of inclusionary zoning requirements on the housing market in support of the City's Inclusionary Zoning framework. The final value of this contract was $491,307 ($499,954, net of Harmonized Sales Tax recoveries) and it was awarded through Purchase Order 6048042 resulting from non-competitive procurement number 9327, with subsequent amendments to address changing provincial legislative requirements and additional Council direction. That contract remains open with an unspent value of $95,214 relating to work that is currently on hold pending announced provincial regulatory changes.

 

Procurement for the multi-tenant houses Land Economics Study with a value of $48,500 ($49,354 net of harmonized sales taxes) will therefore bringing the cumulative value of non-competitive contracts between City Planning and N. Barry Lyon Consulting to $539,807 exclusive of all taxes and charges.

 

City Council approval is required in accordance with Municipal Code Chapter 195- Purchasing, where the current request exceeds the Chief Purchasing Official's authority of the cumulative five-year commitment for each supplier, under Article 7, Section 195-7.3 (D) of the Purchasing By-Law or exceeds the threshold of $500,000 net of Harmonized Sales Tax allowed under staff authority as per the Toronto Municipal Code, Chapter 71- Financial Control, Section 71-11A.

Date
2023-12-15 11:32 AM
Motion
Amend Item
Vote
Absent
Decision body
City Council
Total
20-2
Status
Carried
Dec 15, 2023
2023.PH8.2

Recommended Amendments to Zoning By-laws for Bars, Restaurants and Entertainment Venues as part of the Night Economy Review - Final Report

This report recommends the adoption of zoning by-law amendments to modernize and clarify the rules for bars, restaurants and other entertainment venues as part of the City's inter-divisional Night Economy Review. For details on the proposed licensing framework and considerations in potential City support of the night economy, refer to the Municipal Licensing and Standards Division and the Economic Development and Culture Division staff reports prepared for the November 28, 2023, meeting of the Economic and Community Development Committee.

 

This report also provides context on how proposed zoning by-law amendments align with the Municipal Licensing and Standards (MLS) Division's proposed updates to City licensing regulations and exploratory work led by the Economic Development and Culture (EDC) Division into City steps required to support an enhanced night economy.

 

Staff have considered the research and input received to date and weighed this information to develop balanced regulations that intend to align with evolving business models and provide flexibility and support for businesses, while ensuring an appropriate level of regulatory oversight to mitigate potential community nuisance and public safety issues.

 

The current zoning by-law regime for bars, restaurants and entertainment venues is a harmonization of regulations found in the Former General Zoning By-laws, with regulations originating between the 1960's to the early 2000's. The regulations do not reflect contemporary and forward focussed expectations around these activities and land uses. Other than area-specific reviews, this policy area has not had the benefit of a comprehensive review and consultation in decades.

 

The proposed zoning by-law amendments complement proposed licensing regulations and broader City considerations to respond to a range of City Council directives related to the night economy. The proposed amendments seek to support live music, align the review of zoning and business licensing regulations, support emerging entertainment areas outside the downtown core, modernize and clarify licensing and zoning regulations for restaurants, bars and entertainment venues, and address impacts of problematic establishments.

 

Staff recommend the following zoning by-law amendments to support the night economy:

  • Increase the permitted maximum ancillary entertainment area inside eating establishments from 6% to 25%;
  • Permit nightclubs outside the downtown area in certain commercial zones, subject to conditions including the requirement to be in a non-residential building;
  • Reduce amusement arcade restrictions;
  • Remove amusement device restrictions;
  • Harmonize reductions for the calculation of interior floor area; and
  • Modernize entertainment-related use definitions and align those definitions with Toronto Municipal Code Chapter 545, Licensing.

The following City Divisions, Agencies, Boards and Commissions were consulted in the preparation of this report: Municipal Licensing and Standards, Economic Development and Culture, Toronto Building, Toronto Fire, Toronto Paramedic Services, Toronto Police Service, Toronto Public Health, Transportation Services, Toronto Transit Commission and the Alcohol and Gaming Commission of Ontario.

Date
2023-12-15 11:23 AM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
24-1
Status
Carried
Date
2023-12-15 11:23 AM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
23-2
Status
Carried
Date
2023-12-15 11:22 AM
Motion
Amend Item (Additional)
Vote
No
Decision body
City Council
Total
6-19
Status
Lost
Dec 15, 2023
2023.EC8.14

Supporting the Growth of the Night Economy

The night economy – which accounts for an estimated 300,000+ jobs[1] across a range of sectors – includes all activities taking place between dusk and dawn: dining, community and special events, performing arts, recreation, live music, festivals, shift work, retail, transit and emergency services. A healthy night economy that supports the needs of residents, visitors, and workers requires a proactive municipal approach to lay the groundwork for nighttime business and culture to thrive. A coordinated, strategic approach across City divisions and related external agencies is vital to ensuring that Toronto’s night experience is safe, positive, sustainable, and inclusive.

 

This staff report addresses two distinct but related areas of work in supporting Toronto's night economy: an update on progress of work regarding City Council directives contained in item EC6.8 Strengthening Toronto's Night Economy; and, a summary of key takeaways for the Economic Development and Culture (EDC) Division regarding the 2023 consultations for the multi-divisional Toronto Night Economy Review: Licensing and Zoning for Restaurants, Bars and Entertainment Venues Public Consultation (Toronto Night Economy Review, Attachment 1).

 

This report complements the proposed licensing and zoning changes and by-law amendments for the dining and entertainment sectors of the concurrent reports from City Planning (CP) - Recommended Amendments to Zoning By-laws for Bars, Restaurants, and Entertainment Venues as part of the Night Economy Review – Final Report being considered by the Planning and Housing Committee at the November 30 meeting, and from Municipal and Licensing Standards (MLS) - Recommended Amendments to Chapter 545, Licensing for Bars, Restaurants, and Entertainment Venues as part of the Night Economy Review, being considered by the Economic and Community Development Committee at the November 28 meeting.

 

The Night Economy Internal Working Group made up of City Planning, Municipal and Licensing Standards, Transportation Services, Toronto Paramedic Services, Toronto Police Service, Toronto Public Heath, and others was consulted in the preparation of this report.

Date
2023-12-15 11:17 AM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
22-3
Status
Carried
Date
2023-12-15 11:16 AM
Motion
Amend Motion
Vote
Yes
Decision body
City Council
Total
21-4
Status
Carried
Dec 14, 2023
2023.EX10.16

Cummer Station - Response to Council Motions

This report responds to a number of motions from City Council regarding a potential future subway station at Yonge Street and Cummer/Drewry Avenues (i.e., Cummer Station) as part of the Yonge North Subway Extension (YNSE).  Originally planned as part of the Province of Ontario’s YNSE project, Cummer Station and another station at Royal Orchard Road in the City of Markham were descoped by Metrolinx following the completion of their Initial Business Case analysis and prior to the further planning and design of the project.  However, Metrolinx later agreed to deliver Royal Orchard Station despite its poorer performance relative to Cummer Station.  At present Cummer Station remains out of scope for the YNSE.

 

City staff were directed through MM11.19 Last Chance to Urge Province to Build Cummer Station for the Future of North York, to prepare a business case for Cummer Station which will form the basis for another request to the Province to include Cummer Station in the YNSE’s base scope.  As such, City staff have developed the preliminary business case included in Attachment 1 to this report.

 

EX5.3 Update on Metrolinx Subways Program – Second Quarter 2023 also included motions related to Cummer Station.  This report also responds to these motions. 

Date
2023-12-14 21:51 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
20-0
Status
Carried
Dec 14, 2023
2023.EX10.9

Operating Variance Report for the Nine Months Ended Sept 30, 2023

The purpose of this report is to provide City Council with the Operating Variance for the nine months ended September 30, 2023 as well as projections to year-end. This report also requests City Council's approval for amendments to the 2023 Approved Operating Budget and recommended expenditure authority that have no impact on the City's Net Budget.

 

In 2023, the City continues to experience significant financial impacts, both in the form of added costs and revenue losses as a direct result of the lasting impact of the COVID-19 pandemic. As a result, the 2023 Operating Budget was balanced based on the expectation of continued COVID-19 support funding from the Government of Canada and Province of Ontario with a total budget amount of $932.8 million.

 

To date, $53.7 million in 2023 COVID-19 support funding has been committed specific to Public Health costs, $4.5 million committed to Seniors Services and Long-Term Care with an additional $22.6 million for COVID related expenses in Shelters, Support & Housing Administration. In addition to COVID-19 support funding, the City has generated $33.7 million in offsets associated with projected COVID-19 impacts compared to budgeted estimates, resulting in a $818.3 million remaining COVID-19 funding shortfall in 2023.

 

Table 1 in the following page details the budgeted 2023 City-wide COVID-19 related financial impacts against secured and assured COVID-19 support funding; and the resulting financial position that is reflected in the year-end variance projections:

 

Table 1: 2023 Anticipated COVID-19 Financial Impacts

Transit

366.4

 

 

366.4

Shelters

317.2

22.6

 

294.6

Other Municipal Pressures

161.9

4.5

 

157.4

Public Health

87.4

53.7

33.7

0

Total COVID-19 Impacts

932.8

80.8

33.7

818.3

 

Tax-Supported Programs:

The following table summarizes the projected year-end financial position of the City's Tax-Supported Operations as of September 30, 2023.

 

Table 2: Tax-Supported Operating Variance Summary

 

Budget

Actual

Var

Budget

Actual

Var

Tax-Supported Operating Variance Summary

City Operations

2,245.6

2,257.1

(11.5)

3,066.6

3,086.4

(19.8)

Agencies

2,189.0

2,111.1

78.0

2,899.3

2,844.4

55.0

Corporate Accounts

(858.5)

(530.3)

(328.2)

(1,057.8)

(232.3)

(825.5)

Total

3,576.1

3,837.8

(261.7)

4,908.1

5,698.4

(790.3)

 Less Toronto Building

(1.2)

(11.3)

10.1

(16.1)

(32.3)

16.2

 Less City Planning

6.4

6.2

0.3

10.0

9.8

0.2

Total Variance-Excluding Toronto Building/City Planning

3,570.8

3,843.0

(272.1)

4,914.3

5,720.9

(806.7)

% of Gross Budget

 

 

-7.6%

 

 

-16.4%

 

Nine Month Year-to-Date and Projected Year-End Spending Results:

 

As noted in Table 2 above, for the nine months ended September 30, 2023, Tax-Supported Operations experienced an unfavourable net variance of $272.1 million or (7.6%) of planned expenditures adjusted for Toronto Building and City Planning. It is important to note that the September 30th experience is a snapshot in time and the year-end projection is based on current and expected future impacts.  The continued impact of COVID-19 and any deviation from expectations to year-end will impact variance projections.  Any changes will be reflected in the year-end variance report.

 

For year-end, the City is projecting an unfavourable variance of $806.7 million or (16.4%) of the 2023 Net Operating Budget, adjusted for Toronto Building and City Planning. The projected unfavourable variance results from:

 

·  $818.3 million COVID-19 funding shortfall;

·  $38.1 million projected unfavourable variance within Shelter Services driven by the Refugee Response funding shortfall of $103.0 million;

·  $49.7 million projected favourable variance across all other City Programs and Agencies.

 

Rate-Supported Programs:

Rate-Supported Programs reported a favourable year-to-date net variance of $35.5 million.  At year-end, Rate-Supported Programs are projecting a favourable variance of $49.9M.    

 

Table 3: Rate-Supported Operating Variance Summary

 

Budget

Actual

Var

Budget

Actual

Var

Solid Waste Management Services

(9.2)

(17.9)

8.8

0.0

(13.5)

13.5

Toronto Parking Authority

(19.0)

(32.2)

13.2

(25.4)

(37.3)

11.9

Toronto Water

(22.5)

(36.0)

13.6

0.0

(24.5)

24.5

Total Variance

(50.6)

(86.2)

35.5

(25.4)

(75.4)

49.9

 

The favourable year-to-date variance is driven by all three programs, with expense savings in Solid Waste Management and Toronto Parking Authority, as well as favourable revenue in Toronto Water. The year-end is projecting similar drivers, with Toronto Water showing the largest favourable variance.

 

Rate-Supported Programs are funded entirely by the user fees that are used to pay for the services provided and the infrastructure to deliver them. Solid Waste Management Services and Toronto Water’s respective year-end surpluses, if any, must be transferred to the Waste Management Reserve Fund and the Wastewater and Water Stabilization Reserves respectively, to finance capital investments and ongoing capital repairs and maintenance.

Date
2023-12-14 21:25 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
19-2
Status
Carried
Dec 14, 2023
2023.EX10.2

Advancing Generational Transformation of Toronto's Housing System - Aligning Housing Mandates and Strategic Efforts

The worsening housing crisis demands heightened action and investments from all orders of government. In response to the urgent need to ramp up efforts, on September 6, 2023, City Council adopted Item EX7.2 - 'Urgently Building More Affordable Homes', and directed the Deputy City Manager, Development and Growth Services, among other things, to:

 

- Create a plan, implementation framework and timeline to achieve 25,000 new rent-controlled homes, in addition to the City's previous HousingTO 2020-2030 Action Plan (HousingTO Plan) target of 40,000 affordable rental homes; and

- Report back on an effective alignment of resources, mandates, structure, and personnel of all City of Toronto agencies, boards, commissions, corporations and divisions involved with housing, in particular Toronto Community Housing Corporation and CreateTO, that would enable the City of Toronto to build new public and community housing in collaboration with co-ops, non-profit housing providers, governmental organizations, and other partners.

 

 At its meeting of November 8 and 9, 2023, City Council adopted Item EX9.3 – “Generational Transformation of Toronto’s Housing System to Urgently Build More Affordable Homes”, and identified a suite of City actions and initiatives that are required to shift and strengthen Toronto's housing system to better address the housing needs of low, moderate and middle income households. including:

 

- Dedicating additional City-owned land to create new affordable homes;

- Accelerating the delivery of ‘housing ready’ projects on City and non-profit owned land;

- Streamlining and optimizing people, processes, and technology resources to expedite approvals and housing delivery;

- Developing new and sustainable funding models; and

- Supporting the Indigenous, non-profit and co-operative housing sectors to build housing.

Additionally, to urgently advance the City's efforts and actions, City Council directed the Deputy City Manager, Development and Growth Services to report to the December 5, 2023, meeting of the Executive Committee with recommendations to ensure alignment of the strategic plans and mandates of Toronto Community Housing Corporation and CreateTO, with the City’s housing plans and targets.

 

This report responds to Council's directions in Item EX7.2 and Item EX9.3 and outlines a number of recommendations that will ensure a more consistent and strategic approach in how the City, CreateTO and Toronto Community Housing Corporation plan and deliver housing services. This includes a more effective alignment of resources, mandates, structure, and personnel. This approach will provide greater clarity and direction for each organization and optimize existing resources and expertise across teams in support of the City's housing plans and targets.

Date
2023-12-14 21:13 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
19-1
Status
Carried
Dec 14, 2023
2023.EC8.8

Toronto Fire Services 2022 Annual Report

The Toronto Fire Services (TFS) 2022 Annual Report provides an overview of the fire protection services provided to Toronto's residents and visitors, along with a clear and transparent reporting of outcomes and service level performance. TFS provides Toronto residents, visitors, and businesses with world-class fire protection services, through public education, fire prevention and all-hazards emergency response services.

 

Toronto Municipal Code Chapter 79, Fire Services, requires the Fire Chief to prepare and present an annual report to Council. This report fulfills that requirement and provides Council with an update on fire protection service levels, service level performance, and an overview of the numerous achievements and accomplishments in 2022.

Date
2023-12-14 20:59 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
21-0
Status
Carried
Date
2023-12-14 20:58 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
6-15
Status
Lost
Date
2023-12-14 20:56 PM
Motion
Amend Item (Additional)
Vote
Yes
Decision body
City Council
Total
7-14
Status
Lost
Dec 14, 2023
2023.MM13.15

413 The Kingsway - Request for City Solicitor to Attend at the Toronto Local Appeal Body

  • The City Council meeting addressed an application for a variance related to the height of an ancillary building.
  • The application was for an addition to a cabana in the rear yard of a property at 413 The Kingsway (Application Number A0328/23EYK).
  • The Etobicoke York District Panel of the Committee of Adjustment refused the application on October 26, 2023.
  • The applicant has appealed this refusal to the Toronto Local Appeal Body.
  • Community Planning Staff recommended refusal, citing concerns about neighborhood character and zoning regulations.

Decisions and Recommendations

  • City Council directed the City Solicitor to oppose the appeal at the Toronto Local Appeal Body with appropriate staff.
  • The City Solicitor was authorized to negotiate a resolution for the appeal and to settle the matter at their discretion, after consulting with the Ward Councillor and the Director of Community Planning.
  • These decisions were adopted on December 13, 14, and 15, 2023.
AI Generated
Date
2023-12-14 20:07 PM
Motion
Adopt Item
Vote
No
Decision body
City Council
Total
12-7
Status
Carried
Dec 14, 2023
2023.MM13.29

Confronting the Legacy of the Transatlantic Slave Trade: Renaming Civic Assets Bearing the Henry Dundas Name

  • In June 2020, a petition with nearly 14,000 signatures called for renaming Dundas Street due to its namesake's historical ties to the delay of the abolition of the trans-Atlantic slave trade.
  • In July 2021, City Council voted to rename Dundas Street and formed a Community Advisory Committee (CAC) to recommend new names and a transition plan.
  • The CAC, consisting of diverse community leaders, met regularly and selected "Sankofa Square" as the new name for Yonge-Dundas Square in December 2023.

Decisions and Recommendations

  • City Council adopted the name "Sankofa Square" for Yonge-Dundas Square, to be finalized by mid-2024.
  • The Jane/Dundas Library will be renamed by mid-2024.
  • The Dundas subway station will be renamed by late 2024, with no budget impact.
  • The Dundas West subway station will be renamed by 2025.
  • A public education campaign on the trans-Atlantic slave trade will be initiated, with a funding request of $50,000 for 2024 and 2025.
  • Work on remaining recommendations from 2021 will be paused until further direction is provided.
AI Generated
Date
2023-12-14 20:01 PM
Motion
Adopt Item as Amended
Vote
No
Decision body
City Council
Total
17-4
Status
Carried
Date
2023-12-14 19:57 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
19-2
Status
Carried
Date
2023-12-14 19:56 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
19-2
Status
Carried
Dec 14, 2023
2023.CC13.17

975 Danforth Avenue - Ontario Land Tribunal Hearing - Request for Directions

  • The City Council meeting took place on December 13, 14, and 15, 2023.
  • The meeting addressed a Zoning By-law Amendment application for a 10-storey mixed-use building at 975 Danforth Avenue.
  • The application was appealed to the Ontario Land Tribunal due to the City Council's failure to make a decision.
  • An urgent hearing is scheduled for February 26, 2024.

Decisions and Recommendations

  • City Council adopted confidential instructions from the City Solicitor regarding the application.
  • The public release of certain confidential recommendations was authorized.
  • City Council accepted a settlement offer and directed the City Solicitor to support it at the Ontario Land Tribunal.
  • The City Solicitor was instructed to ensure all outstanding issues with the application are resolved before any construction begins.
  • A construction management plan with specific community engagement and safety measures was mandated.
  • The City Solicitor was authorized to take necessary actions to implement these decisions.
AI Generated
Date
2023-12-14 17:14 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
20-5
Status
Carried
Dec 14, 2023
2023.CC13.7

Uber Litigation Regarding Limit on Number of Private Transportation Company Driver Licences

  • The City Council meeting focused on legal matters involving Uber Canada Inc. and Uber Raisier Canada Inc.
  • A report from the City Solicitor is being prepared to provide legal advice on a court application against the City.
  • This report will be reviewed by the City Council during its upcoming meeting on December 13, 14, and 15, 2023.

Decisions and Recommendations

  • City Council decided to rescind part of a previous policy limiting vehicle-for-hire licenses, allowing the issuance of new driver licenses under an older system.
  • The Executive Director of Municipal Licensing and Standards is tasked with reporting options to limit licenses, considering factors like congestion and climate targets by March 20, 2024.
  • Confidential legal advice from the City Solicitor will remain confidential due to solicitor-client privilege.
AI Generated
Date
2023-12-14 16:50 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
23-0
Status
Carried
Date
2023-12-14 16:48 PM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
23-0
Status
Carried
Date
2023-12-14 16:43 PM
Motion
Amend Motion
Vote
No
Decision body
City Council
Total
3-21
Status
Lost
Dec 14, 2023
2023.MM13.31

Silent Nights and Peaceful Days - Providing relief to residents from Metrolinx's Whistle Sounding at Manse Road Rail Crossing on the Lakeshore East Corridor

  • Metrolinx assessed the Manse Road at-grade crossing as a safety risk.
  • Starting November 23rd, Metrolinx began using train whistles at this crossing, alarming local residents.
  • The noise is particularly disruptive during peak commuting hours.
  • Residents are seeking relief from the whistle noise, especially with the upcoming holidays.
  • The City of Toronto is working on safety improvements requested by Metrolinx.

Decisions and Recommendations

  • City Council directed the City Manager to ask Metrolinx to collaborate with City staff on quick safety options to stop the whistles.
  • If quick measures are not possible before the holidays, a safety worker should be posted at the crossing to help stop the whistles.
  • City Council delegated authority to the City Manager to approve and implement necessary safety measures for the crossing.
AI Generated
Date
2023-12-14 15:12 PM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
25-0
Status
Carried
Dec 14, 2023
2023.PH8.11

Federal Rapid Housing Initiative - Program Update and Phase Three Implementation

At its meeting of November 8 and 9, 2023, City Council adopted Item EX9.3 – “Generational Transformation of Toronto’s Housing System to Urgently Build More Affordable Homes”, which outlined the urgent need for new and enhanced government investments to strengthen and shift the housing system to increase the supply of public and non-profit owned homes. These homes are critical to adequately address the unmet housing needs of low- and moderate-income households.

 

A key federal program that has supported the City and the Indigenous and non-profit sectors to create new deeply affordable supportive housing is the federal Rapid Housing Initiative (RHI). The RHI program provides up to 100% capital grant funding towards the costs to build or acquire and renovate properties to create net new affordable and supportive rental homes for people experiencing or at risk of homelessness. With almost $440 million in federal investments over Phases One and Two of the RHI program, the City has been able to accelerate the delivery of almost 1,100 new homes to successfully move people out of homelessness.

 

As part of Budget 2022, the Government of Canada announced Phase Three of the RHI and allocated $1.5 billion to create over 4,500 affordable rental homes across Canada. In July, 2022, through Item PH35.21, City Council authorized staff to submit an application to the Canada Mortgage and Housing Corporation (CMHC) for funding under this new phase of program and to report back on the outcome of the application, once known. This report responds to Council’s request and provides an update on the City’s RHI funding application.

 

As part of Phase Three of the RHI program, CMHC has recently approved a total investment of $169.4 million in grant funding to support 9 projects, estimated to create 416 net new rent-geared-to-income (RGI) homes across Toronto over the next 18 months. While this allocation falls short of the City’s requested funding to deliver over 1,300 affordable and supportive homes, the City greatly appreciates this federal commitment and looks forward to additional opportunities for collaboration and enhanced partnership. Approved and announced projects are outlined in this report, and Confidential Attachment 1 to this report provides details of the approved and unannounced projects, which must remain confidential until publicly announced by CMHC, as required in the City’s funding agreement with CMHC.

 

To deliver deeply affordable rental and supportive housing, a tri-government partnership approach is essential. To complement federal capital investments, the City has committed its own land and financial incentives to support delivery of the new homes. This report recommends that City Council request the provincial government to also join federal and City efforts and commit to incremental and sustained operating funding (for housing benefits and support services) to help create net new supportive housing opportunities. This is on top of the $48 million annual commitment made by the provincial government for 2023-2025 to support an estimated 2,000 supportive housing opportunities created over 2021 and 2022 through new construction, acquisitions, and layering on supports to existing rental units. Deeply affordable homes with a range of individualized, wraparound social and health supports are key to ending chronic homelessness. Besides providing people with improved health and social outcomes, investments in permanent affordable and supportive housing help reduce systemic and structural inequities; strengthen our housing, homeless and public health systems; and result in avoided costs and cost-savings for all orders of government. 

 

This report also provides a status update on in-flight rapid and modular housing projects, in line with direction from City Council in July 2023 through Item AU2.7. Specifically, Item AU2.7 from the Auditor General recommended that staff provide Council with more regular updates on the status of modular housing projects. Further, this report seeks City Council approval for staff to allocate funding from the Housing Secretariat approved 2023 Capital and Operating Budgets, as well as federal and provincial sources, to previously approved RHI projects, including proponent-led projects, subject to funding availability and conditions specified by the Housing Secretariat. These authorities are required to ensure that in-flight City, Indigenous and non-profit projects, which are essential to relieving pressure on the emergency shelter system, can continue to advance despite the current challenging construction environment with rapidly escalating labour and material costs.

 

A whole-of-government and whole-of-community approach is needed to effectively address the housing and homelessness crisis which threatens the social, economic, and cultural growth and prosperity of Toronto, Ontario, and Canada. As outlined in Item EX9.3, new and enhanced policy, program, and financial tools are urgently needed to meet the shared housing supply and growth targets of all orders of government. This includes a commitment from the federal and provincial governments to invest in the HousingTO 2020-2030 Action Plan. Investments in upstream interventions, including changes to social assistance programs to reflect the current cost of living, and increased access to health and social services, are also urgently needed to prevent more households from falling into poverty, housing precarity and homelessness.

Date
2023-12-14 14:51 PM
Motion
Reconsider Item
Vote
Yes
Decision body
City Council
Total
9-16
Status
Lost
Dec 14, 2023
2023.MM13.27

Federal Housing Accelerator Fund - Supporting Generational Transformation of Toronto's Housing System

  • The City Council meeting addressed Toronto's housing crisis.
  • Urgent action and investment from all government levels are necessary.
  • The focus is on increasing housing supply and protecting existing homes.
  • The Housing Action Plan 2022-2026 aims to achieve 285,000 new homes in 10 years.
  • A new target of 65,000 rent-controlled homes was established to support low-and-moderate-income households.

Decisions and Recommendations

  • City Council authorized the Deputy City Manager to negotiate a Contribution Agreement under the Housing Accelerator Fund.
  • Council approved receipt of funds from the Housing Accelerator Fund.
  • Initiatives to increase housing supply and enhance the application were approved.
  • A Housing Accelerator Reserve Fund will be established for received funds.
  • A municipal Indigenous housing pre-development fund will be considered.
  • Reports on zoning for low-rise housing, shadow policies, and transit-oriented housing will be prepared.
  • Confidential information was approved for public release at the Deputy City Manager's discretion.
AI Generated
Date
2023-12-14 12:34 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
22-2
Status
Carried
Date
2023-12-14 12:33 PM
Motion
Amend Item (Additional)
Vote
No
Decision body
City Council
Total
20-4
Status
Carried
Dec 14, 2023
2023.TE9.42

321 Davenport Road - Construction Staging Area

As the Toronto Transit Commission (TTC) operates a transit service on Davenport Road, City Council approval of this report is required.

 

321 Davenport Road Limited is constructing a 9-storey residential condominium building at 321 Davenport Road. The site is located on the south side Davenport Road between Dupont Street and Bedford Road.

 

Transportation Services is requesting approval to close the south sidewalk, south side parking lane, south side bicycle lane, and the south side eastbound lane on Davenport Road for a period of 8 months, from December 14, 2023 to July 31, 2024 inclusive to facilitate construction staging operations. Pedestrian movements on the south side of Davenport Road, abutting the site, will be maintained in a minimum 1.8 metre-wide covered and protected walkway. The eastbound bicycle lane will be temporarily closed, and cyclists will be redirected to a 1.8-metre-wide exclusive bicycle lane within the existing eastbound lane. The construction staging area will result in the loss of five on-street parking machine spaces on the south side of Davenport Road.

 

To accommodate the required staging area, Transportation Services is also requesting the authority for the General Manager of Transportation Services to issue Temporary Street Occupation permits for the developer on Davenport Road, notwithstanding that not all the criteria within the City of Toronto Municipal Code Chapter 743, Streets and Sidewalks, Use of, for so doing would be met.

Date
2023-12-14 10:13 AM
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
22-2
Status
Carried
Dec 14, 2023
2023.EX10.17

Advancing Eglinton East Light Rail Transit

The Eglinton East Light Rail Transit (EELRT) is a proposed 18.6-kilometre LRT in Scarborough, with a total of twenty-seven (27) stops. The alignment begins at Kennedy Station, continues east on Eglinton Avenue and Kingston Road, and proceeds north on Morningside Avenue, Ellesmere Road, New Military Trail, Sheppard Avenue East and Neilson Road. The EELRT terminates at two locations, one at Sheppard-McCowan Station, currently under construction by Metrolinx for the Scarborough Subway Extension (SSE), and the other at Malvern Town Centre. The EELRT will travel through, or adjacent to, seven Neighborhood Improvement Areas (NIAs), providing higher-order transit service to historically underserved communities in the city. By providing connections to the TTC and GO Transit networks, the EELRT will also offer more transportation options to residents in eastern Scarborough.

 

City staff last reported to City Council on the EELRT through EX33.2 - Advancing City Priority Transit Expansion Projects - Eglinton East Light Rail Transit and Waterfront East Light Rail with the outcomes of a constructability assessment related to interface conflicts between the EELRT and the SSE at Kennedy Station. Through this report, City Council adopted the staff recommendation to proceed with a distinct-service concept with an at-grade connection at Kennedy Station, which could deliver additional benefits including cost savings, shorter construction duration, reduced property impacts, and design flexibility by avoiding dependency on the Eglinton Crosstown LRT technology, operations, and maintenance requirements, thereby enabling vehicles to be accommodated at the preferred Maintenance Storage Facility at the Conlins Yard over the long-term.

 

In response to City Council direction to advance the above noted distinct-service concept, this report seeks approval of the EELRT alignment, summarizes the updated initial business case, and provides a status of the preliminary studies in advance of the Transit Project Assessment Process. This report also seeks City Council authority for City staff to modify a portion of the EELRT alignment should there be an overlap with a confirmed Provincially-led extension of rapid transit along Sheppard Avenue, east of the existing TTC Line 4. Additionally, the report also seeks City Council approval to advance the required next steps to progress the EELRT project, including securing accommodation of the EELRT by adjacent projects to the extent possible.

Date
2023-12-14 10:04 AM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
23-0
Status
Carried
Dec 14, 2023
2023.TE9.27

685 Lake Shore Boulevard East - Applications for Zoning By-law Amendment and Site Plan Control - Appeal Report

On September 2, 2022 the City received applications for Zoning By-law Amendment and Site Plan Control to permit a mixed-use development in the Port Land’s McCleary District. This application proposed two 35-storey residential towers connected by a 4-storey commercial base building. A resubmission of the application was received on June 22, 2023, revising the height of the residential towers to 38 and 43-storeys respectively. The revised application contains 899 condo dwelling units and two levels of underground parking.

 

On July 10, 2023 the applicant appealed these applications to the Ontario Land Tribunal ("OLT") due to Council's failure to make a decision within the time frame prescribed by the Planning Act. A Case Management Conference has been scheduled for November 17, 2023.

 

This report recommends that the City Solicitor and appropriate City staff attend the OLT hearing to oppose the application in its current form and continue discussions with the applicant in an attempt to resolve outstanding issues and to ensure coordination with ongoing precinct planning for the McCleary District.

Date
2023-12-14 09:59 AM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
22-0
Status
Carried
Dec 13, 2023
2023.RM13.7

Review of the Order Paper

  • The City Council meeting focused on reviewing the Order Paper.
  • The Order Paper includes the agenda and items for discussion and decision.

Decisions and Recommendations

  • On December 13, 2023, the City Council adopted the Order Paper, with amendments, and approved all other items not held on consent.
  • On December 14, 2023, the City Council adopted the Order Paper for that day.
  • On December 15, 2023, the City Council adopted the Order Paper for that day as well.
AI Generated
Date
2023-12-13 17:38 PM
Motion
Amend the Order Paper
Vote
Yes
Decision body
City Council
Total
14-9
Status
Lost
Date
2023-12-13 11:31 AM
Motion
Amend Item
Vote
No
Decision body
City Council
Total
3-20
Status
Lost
Date
2023-12-13 10:52 AM
Motion
Remove from Committee
Vote
Yes
Decision body
City Council
Total
22-4
Status
Carried
Date
2023-12-13
Motion
Amend the Order Paper
Vote
Yes
Decision body
City Council
Total
20-3
Status
Carried
Dec 13, 2023
2023.CC13.2

Ontario-Toronto New Deal Agreement

  • The City Council meeting focused on the Ontario-Toronto New Deal.
  • Announced by Premier Doug Ford and Mayor Olivia Chow on September 18, 2023.
  • A Working Group was formed to ensure financial stability for the City of Toronto.
  • The New Deal Term Sheet outlines provincial and federal support for the City’s financial plan.
  • The City Manager will update the Council on progress by the end of 2024.

Decisions and Recommendations

  • City Council approved the Ontario-Toronto New Deal Term Sheet in principle.
  • Authorized key staff to continue discussions with the Government of Ontario and accept provincial funding.
  • Directed the Toronto Transit Commission Board to fulfill commitments related to transit.
  • Requested the Federal Government to partner in the New Deal and provide necessary funding.
  • Ensured that efficiency measures for the Long Term Financial Plan are presented to Council before implementation.
  • Directed staff to negotiate future transit commitments and maintain confidentiality on certain legal documents.
AI Generated
Date
2023-12-13 16:36 PM
Motion
Adopt Item as Amended
Vote
Yes
Decision body
City Council
Total
24-0
Status
Carried
Dec 13, 2023
2023.MM13.17

Balanced Approach to Distributing Legislative Meeting Materials

  • City Council meeting focused on challenges with agenda items and supporting documents.
  • Councillors expressed difficulties with the Clerk’s Meeting Portal and online document navigation.
  • The previous practice of providing printed materials was discontinued during the pandemic but continued without consultation afterward.
  • Printing and preparing materials has become time-consuming for staff.
  • There is a need for a balanced approach that considers accessibility and screen time reduction.

Decisions and Recommendations

  • Councillor Chris Moise, supported by Amber Morley, recommended:
    1. The City Clerk should consult and survey Council members about their needs for paper copies of meeting materials.
    2. The findings, proposal, budget implications, and implementation options should be reported as part of the 2024 Budget process.
  • City Council deferred Item MM13.17 to the meetings scheduled for February 6, 7, and 8, 2024.
AI Generated
Date
2023-12-13 15:38 PM
Motion
Defer Item
Vote
Yes
Decision body
City Council
Total
18-1
Status
Carried
Dec 13, 2023
2023.SC9.9

Birchmount Road and Chaldean Street/Glendower Circuit - Pedestrian Crossing Protection

As the Toronto Transit Commission (TTC) operates a transit service on Birchmount Road, City Council approval of this report is required.

 

Transportation Services has reviewed the need for pedestrian crossing protection (PXO) at the intersection of Birchmount Road and Chaldean Street/Glendower Circuit.  Based on the assessment undertaken, Transportation Services does not recommend the installation of either a PXO or traffic control signals at this intersection as the warrant criteria was not met.

Date
2023-12-13 11:11 AM
Motion
Adopt Item
Vote
Yes
Decision body
City Council
Total
25-1
Status
Carried
Dec 13, 2023
2023.IA13.1

Renaming Dundas Street

  • City Council meeting held on December 13, 2023.
  • Councillor Stephen Holyday submitted an Administrative Inquiry about renaming Dundas Street.
  • Inquiry focuses on costs associated with the renaming and recent research on Henry Dundas.

Decisions and Recommendations

  • City Council received Administrative Inquiry IA13.1 regarding the renaming of Dundas Street.
  • The inquiry includes questions about total costs for the renaming and past expenditures related to the project.
  • Questions also address how recent peer-reviewed articles on Henry Dundas have been communicated to the Mayor and Councillors.
  • The City Manager's response IA13.1a was also received for information.
AI Generated
Date
2023-12-13 10:22 AM
Motion
Refer Item
Vote
No
Decision body
City Council
Total
11-15
Status
Lost
Dec 13, 2023
2023.NY9.2

Wilson Avenue and Maniza Road - Traffic Control Signals

As the Toronto Transit Commission operates a transit service on Wilson Avenue, City Council approval of this report is required.

 

Transportation Services has reviewed the need for traffic control signals at the intersection of Wilson Avenue and Maniza Road.  Based on the assessment undertaken, Transportation Services does not recommend the installation of traffic control signals at this intersection as the warrant criteria was not met.

Date
2023-12-13
Motion
Amend Item
Vote
Yes
Decision body
City Council
Total
22-4
Status
Carried